REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
WJ7 - JA ACCESSION NBR;8211180283
. ~ DATE: 82/11/16 NOTARIZ Np FACIL:50-244 Rober t Emmet Ginna Nuclear Planti Unit li Rochester G
AUTH BYNAME AUTHOR AFFILIATION MAIERiJ ~ E, Rochester Gas 8 Electric Corp.
REtcrP.NAME, RECIPIENT AFFILIATION CRUTCHF IELDi D, Operating Reactors Branch 5
SUBJECT:
Revises commitment dates for SEP Topics II<<3' L III-7'E Detailed flooding analysis will be submitted by end of 1982.Liner analysis will be completed by Apr 1983.
DISTRIBUTION CODE:
A03bs COPIES RECEIVED:LTR g ENCL L
SIZE:
TITLE:
OR Submittal:
SEP Topic NOTES;NRR/DL/SEP
- 1cy, DOCKET 05000240 05000244 RECIPIENT ID CODE/NAME NRR ORB5 BC 01 INTERNAL: NRR/DL/DRAB 11 NRR/DSQ/
8 F
00 COPIES LTTR ENCL 3
1 1
1 1
1 1
RECIPIENT ID CODE/NAME NRR/DL/SEPB 12 NRR/DS I/CSB 07 RGN1 COPIES LTTR ENCL 3
3 1
1 1
1 EXTERNAL: ACRS 14 NRC PDR 02 NOTES' 6
1 1
1 1
LPDR NTIS 03 5
1 1
1 1
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 21
N hf )i'l4 il A
~
a
'4
"'4,
~,
g
(
]I lk
'4
, l a
h l
C:'M.-A II n
fl f
E IE t
Jk Pt N
.r f
/////////////
SIP/
Ill/If'/
EZililiI/
l rueP I//I///t/
ROCHESTER GAS AND NI~
L*a4 Oa fAaNl(
10'IA1$
ELECTRIC CORPORATION o
S9 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN F..
MAIER VICE PRESIDENT TEL,CPHONE AIIKACODE lid 546-2700 November 16, 1982 Director of Nuclear Reactor Regulation Attention:
Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.
5 U.S. Nuclear Regulatory Commission Washington, D.C.
20556
Subject:
SEP Topics II-3.B, III-7.B R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Crutchfield:
The purpose of this letter is to revise two SEP topic commitment dates made earlier this year.
In our August. 25, 1982 letter concerning the Draft NUREG-0821 open issues, RGS.E committed to submittal of a detailed flooding analysis by the end of September, 1982.
This commitment was made prior to the official scheduling of the ACRS Subcommittee Meeting on Extreme External Phenomena, held in Los Angeles on October 21 and 22, 1982.
The completion of our analysis was held in abeyance pending the anticipation of guidance resulting from this meeting.
Incorporating information gathered at the ACRS Subcommittee
- meeting, RGEcE plans to submit the detailed flooding analysis by the end of 1982.
RG6E also committed in the August 25 letter to complete the containment liner analysis by October 1, 1982.
- However, difficulty in locating records defining the as-built configuration of the liner and stud arrangement has not allowed this work to be completed by the scheduled date.
We anticipate that the liner analysis can be completed by April 1983.
This schedule would allow the resolution of this item to be included in the Integrated Assessment supplement which is to address the Ginna Structural
'Upgrade Program.
Very truly yours, John E. Maier 821 1'180283 821:1=16 PDR ADOCK 05000244 P
,PDR'.
r' I
It ~
I w"
~
V I
fhl V
h I
h I k
F (
V
~ '
I F 'Fll P
1 f
e e
'h Vh F'Ph K
IF I
h e
F I
P h
f
~
~
1 I
g, g'h g I II )
FI
~ I I,
~
V
'f I
Vlf e
Pf I
I I
II
~
Wfhlh