Text
REGULATORY NFORMATION DISTRIBUTION S TEM (RIDS)
ACCESSION NBR;8000160090 DOC ~ DATE! 84/04/06 NOTARIZED'O DOCKET ¹ FACIL:50-244 Robert Emmet Ginna Nuclear Planti Unit li Rochester G
05000244 AUTH,NAME AUTHOR AFFILIATION KOBER RAINE Rochester'as 8.Electr i c Cor p, REC IP, NAr<E RECIPIENT AFFILIATION CRUTCHFIELDgD ~
Operating Reactor s Branch 5
SUBJECT:
Requests
=safety assessment sys implementation dates be modified to show installation complete by June i986 8
operational status by June l987 per Suppl 1 to NUREG 0737.
DISTRISUTION CODE:
AOOSS COPIES RECEIVED;LTR.g ENCL E'IZE:
TITLE: OR/Licensing Submittal;'Suppl 1 to NUREG 0737(Generic Ltr 82"33)
NOTES:NRR/DL/SEP
- 1cy, 0500024li RECIPIENT ID CODE/NAME NRR ORB5 =BC INTERNALS IE/DEPER/EPB NRR/DHFS/HFEB NRR/DL/ORAB NRR/QS I/CP8 NRR/DS I/METB NRR/DS I/RS8 RGN$
EXTERNAL; LPDR NSIC.
NOTES:
COPIES LTTR ENCL.
5 1
i 1
1 RECIPIENT ID CODE/NAME NRR. PAULSONgH NRR/DHFS/PSRB NRR/DL/ORB5 NRR/DSI/ICSB ES NRC PDR NTIS COPIES LTTR FNCL TOTAL NUMBER OF COPIES REQUIRED:
LTTR 35 ENCL 3
NQ' f gjp tNQ
'iN I'w II
'~',e~,,ffN'rNc~~>s+(-
Y f+kl,,g~
i'ilsariijjjt~ j'g
~ f ~Q ijyfyjlligg
'jN'll,,l~
I ii, gf 0 N>jf yj',N'(I, I, Nff,.EDNN, jjf I <~fpljl It,jl f 0, I,,>>
'll iiN Ij j$'i "lni "0 iIN'i +
i.i)jjNj,g~'
t i ',
i'C jl,, il ~ j
,l Ii j;,'.NT NI'N~N j
< I,I, I>",
'jI,,
$ filjfl'f;-lf,f,ilji lt ii
'g'N i
'i 0 f
'i.N i
'Nft~>> )'iaaf Ilk jl g 'I y
ii IQ'k I I ~
$ 'ijlgj j$
i I le li pj I
I
)ej
~ ~ E gi
,Xll ~N
")/(
"i )3[>(g
~ fj )@ANN, ii,.)
4g i, il IilN,N 0 l
'I
>>I Vil
~
i Z87I IIII' LES 01t ~
I l'jii'I,l!ll" SSStC ROCHESTER GAS AND ELECTRIC CORPORATION o 89'EAST AVENUE, ROCHESTER, N.Y. 14649.0001 ROGER W. KOBER vKe psteslDeMT eLec7Ric s steAMDstDDuctsoN TCLCRHDNe AREA CODE 7ls 546-2700 April 6, 1984 Director of Nuclear Reactor Regulation Attention:
Mr. Dennis M. Crutchfield, Chief Operatinq Reactors Branch No.
5 U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
NUREG 0737, Supplement 1,
SAS R.
E. Ginna Nuclear Power Plant Docket No.
50-244
Dear Mr. Crutchfield:
An RG&E letter dated August 3, 1983 provided the Company's schedule for installation and operation of the Safety Assessment System (SAS).
The current vendor schedule for delivery of the Ginna Station SAS and the required plant process computer system is mid March 1985, which coincides approximately with the beginning of the 1985 refueling shutdown.
However-, after review-ing the vendor progress in system software development, RG&E has concluded that the actual delivery schedule will slip from three to six months.
This delivery schedule will preclude system installation during the 1985 refueling outage as previously planned.
Although every effort will be made to compress the current schedule to effect a
1985 installation, a realistic review of the rate at which tasks are being completed leads RG&E to now project system installation during the 1986 refueling outage with full operational status one year thereafter.
It should be noted that the system is expected to be functional when installed.
A complete test of the system hardware and software will be performed at the vendor's plant prior to shipment.
- However, a system this complex may require ten to twelve months of operation on site before full capability is achieved.
Since the delay of one year in installation will allow more extensive testing and operator training at the vendor's facilities prior to delivery, the "shakedown" period may be reduced.
However, it is impossible to quantify this potential reduction.
The slippage in schedule has resulted from four factors, the vendor's underestimate of the extent of system operating software to be developed, the incorporation of this software into a standard "product line", a shortage of personnel familiar with th
,8404160090 840406 PDR ADQCK '05000244
'F PDR
~s i1 i.
J jl
)l
ROCHESTER GAS AND ELECTRI CORP.
bATE April 6, 1984 To Mr. Dennis M. Crutchfield SHEET NO.
hardware operating
- systems, and the vendor's underestimate of applications software requirements.
RGaE has closely monitored the vendor's technical activities and has brought about changes in project management intended to accelerate the schedule.
RGGE management has also formally notified the vendor of the serious consequences of the additional slippage now anticipated.
RG&E has also evaluated alternatives to continuing the project with the current vendor.
However, the results of this study indicate that changing vendors would involve longer delays and greater costs than those anticipated with the current vendor.
In view of the facts outlined above, RG&E requests that the SAS implementation dates for Ginna Station be modified to show installation complete by June 1986 and operational status by June 1987.
e y truly yours, er W. Kober