ML17255A649
| ML17255A649 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 01/30/1984 |
| From: | Crutchfield D Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17255A650 | List: |
| References | |
| NUDOCS 8402010075 | |
| Download: ML17255A649 (5) | |
Text
'p,A RE0y P0
++*++
UNITED STAT'ES NUCLEAR REGUL'ATORY COMMISSION WASHINGTON, D. C. 20555 ROCHESTER GAS AND ELECTRIC CORPORATION DOCKET NO. 50-244 R.
E.
GINNA NUCLEAR POWER PLANT AIIENDlIENT TO PROVISIONAL OPERATING LICENSE Amendment No. 59 License No. DPR-18 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Pochester Gas and Electric Corporation (the licensee) dated August 1, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
8402010075 840i30 PDR ADOCK 05000244 P
. 'DR
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C(2) of Provisional Operating License No. DPR-18 is hereby amended to read as follows:
(2)
Technical S ecifications The Technical Specifications contained in Appendix A as revised through Amendment No. 59, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
January 30, 1984 Denni s M. Crutchfiel d hief Operating Reactors Branch P5 Division of Licensing
ATTACHMENT TO LICENSE AMENDMENT NO.
59 PROVISIONAL OPERATING LICENSE NO.
DPR-18 DOCKET NO. 50-244 Revise Appendix A Technical Specifications by removing the page 3.5-5 and inserting the enclosed page 3.5-5.
This revised page contains the captioned amendment number and marginal lines which indicate the area of change.
TAM,E 3 5-2 E52fKENCY GXif.ING I'iO. WNCI'IGNAL UNIT NO. of QIANNELS 2
3 NO. of hiIN.
QiANNU,S OPL'fVQ3LE, TO TRIP'~***
Q INCAN Ef8 lrIW.
DEGREE OF RH'UNOAIKY PER'IISSIBLE BYPASS CONDITIONS 6
OPERATOR ACTION XF CONDITIONS OF CXrLUEK 3 OR 5 Cmmer BE m.<
I.
SAll TY lh3L'(.SIGN
- a. I'janlral 2
Ii. leigh Containrent 3
Vrussure
- c. Ste rm Generator Im) Steam Pressure/Loq ri. I'r.'~.':".ur. iver law Pressure Primary pressure less than 2000 Ps1g Primary lwessure less than 2000 psig Hot Shutdown***-
)
IIot Shutdown" **
Hot Shutdown***
llot Shutdown***
2.
GNZAIMZM~'EdAY a
Igal lua1
- b. !li-lriCo>>tainn>>t 2 sets Pressure (CGllLain-of 3 nant Spray) 2of3 in ea.
set 2 133r set I/set Hot Shutdown***
Hot Shutdown***
- " I;u't actuate 2 switclres simultaneously.
- "If rrinir rur. cvrrditions are not met within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, steps shall be taken on tie affecLed unit to place Lhe unit in cold shutduw>> conditions.
"""'fa furrctiorral unit is olwrating with the minirnurn ofmrable charnels the neer of channels to trip the reacLor will l
Im colur,rn 3 less column 4.
3.5-5 Amendment N0.~7, 5g