REGULATORNFORNATION DISTRIBUTION TEN (RIBS)
AGCESSION NBR g 8312090257 DOC ~ DATE: 83/12/01 NOTARIZED:
NO DOCKET
.FACIL:50 244 Robent; Emmet>> Ginna Nuclear Pl anti Uni,t 1g>>Rochester "G.
05000244 AUTH'P ME AUTHOR "AFFIL'IATION MAIERiJ,E,
'Rochester Gas' Electric Carp>
'RECIP,NAMEi RECIPIENT AFFILIATION GRUTCHFIELD'iD~.
Oper ating Reactors Br anch,5
SUBJECT:
Addresses
~T'ech Spec r equir ement -for tendon insp resu'I ting
.from tendon 75'amage during Jul Isurveillance.Reasons-,why
- exemption.from requirement"should be granted listed>No "broken wines identified, DISTRIBUTION CODE:
A001S COPIES RECEIyED~LTR.
ENCL,SIZE:
,TITLE:
OR Submittal':
General Distribution
,NOTES:NRR/DL/SEP,icy,.
05000244 RECIPIENT ID CODE/NAME>>
,NRR ORB5 "BC 01 INTERNAL! ELD/HDS4 NRR/DL, DIR ETB EG AL 04 iCOPIES CTTR EN L.
"7 1-1 1
REC IP IENT ID CODE'/NAME>>
NRR/DE/MTEB NRR/DL/ORAB NRR/DSI/RAB RGN1
~COPIES LTTR ENCL
.EXTERNALS ACRS NRC PDR NT'I'S NOTlESG 09 02'.
LPDR NSIC 03.
05 (TOTAL NUMBER'F COPIES REQUIRED j LTTR 26 ENCL:,
(cln I 0)
~'lI~'fjlTliOI81 BIQ POITA,'~><r) it1.
HvTg Ju~) JH ralar)r>
- '3% I')ATVV I Oi5 fi~8; JTAr). QuP 4 PSOE'05'f 68: ROll iht)I88,333A lib Nv~)089 0
~e raerto~i
~
> I 0 r nU gnat f 9 ice f vul4 snr) i'd/
lemma 9aedoR GAS-Oc '.
JIVA'10I TAIJI )QA RV><TUA
~
DNA>l,HTVA
.aso3 argSae f3 8
asO ze)aerlooR,,'J.l
>HJIA<<
>.1AITAIJI 3-lA
>)t)3 J.9ID')H JNAM-9I ):3R c.'lansiO aqodase5) gnifc~eqf3 0 <uJ3IQH JTU~J pni0 fu"e~ qani nohneN sot Pnemearupea ooqc: nveT 988e'1hbA:rvaf,~
)e Y<4w pnnare5).eanr f tievqU8 fuf. pni~uh
~grrr~sb dV nobnef molt o!4.bedwarf oetnssp e6 hfuorfe 9neme~rupeq mop%
norPqme)ce
,heitifnebr geaiw nesoarjRE I8
'DN 3 5fTJ: 03YI333R 83IQ() J r". I00a: anfj:) ~uITuul 5)Te Iu no r 8 vd i q 0 e i0 I r ~ ene f): f c>f 9 r mdud Hf):3 I T I T
>>) 800r)i'0
,yo I 938iJWXARrl:CENT')A 8 J I'<r)J J J)43 HTTJ TH3 I 9 IDLER 3'A~AX.IQOQ r)I c".3I90 J J3y13 R fTJ Ti43I9I33M 3MANX1003 OI l0 3"
HHRU RRA qg Tfcijr)yRHM r)ARDXJQXRHtt'A'PNI80%~R>
IYdH 9
l
<~POHiuJ.>: JAAH PT~" I R I r) JV X'HH~'~
l 8 f'SNAB I'P,QX>'R~)
y0 RJIR 03
)
Il vr)9J 3ICV c)')
9 0
~ I 50 P fi0A:JAGER 3 T X,3 909 J9s>
P, I T ~)
i/
SISS /
ZSikl!E
/
AlVP i (zi'l inure 3Z ROCHESTER GAS AND ELECTRIC CORPORATION
~ e9 EAST AVENUE, ROCHESTER, N.Y. I4649 December 1,'983 JOHN E. MAIER Vice PresiCent TELEPHONE AREA CODE 7 la 546.2700 Director of Nuclear'eactor Regulation Attention:
Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.
5 U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Containment Vessel Evaluation Program R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Crutchfield:
This letter addresses the Ginna Technical Specification requirements for tendon inspection resulting from the damage to tendon no.
75 which occurred during the July Tendon Surveillance.
In our letter dated November 21," 1983, we reported that. prior to the incident, 12 tendons had been inspected and tested including no.
75.
The inspection of each tendon revealed no broken wires and. no other anomalies.
Furthermore, lift-offtests showed that all tendon forces exceeded the technical specification minimum requirement of 636 Kips, as well as showing excellent agreement with pretest predictions.
An inspection conducted after the incident revealed that 24 of 90,'/4-inch diameter steel wires in tendon no.
75 were broken.
Section 4.4.4.1 (d) of the Technical Specifications requires that all 160 tendons be inspected if more than 20 wires in 14 tendons are found broken since the last surveillance inspection.
We request that, Ginna be granted an exemption from this requirement for the following reasons:
(1)
The initial inspecton of tendon no.
75 and the other ll tendons revealed no broken wires prior to the incident.
(2)
The cause of the broken wires is attributable to the stressing equipment failure and not due to an unexplainable loss of tendon integrity.
(3)
Adherence to the technical specifications would involve degreasing the tendon heads prior to conducting an inspection.
Due to ambient temperatures this time of year, the casing filler covering the tendon heads is a stiff; putty-like substance making degreasing operations a time-consuming ordeal.
It will require approximately 30 days or roughly 200 manhours to complete this task.
001EDq0257 831201
~tie PDR ADOCK 05000244
,,8..,,
PDR p&
i 0
of)zoo od xoiar..
':E"aorF ovfia )9 orle qadi vr na p~f)
<<'.Xfl'g ixffPgig~)g'fO'P
)ggr:'jg,g)s
()y t'"
~ )q~)3'g".I
>q(
"g'~j cE".
~.))~ fIAF)t'I'.~d
-'iL>,:f
'L)P3,'x" ~%'0")
x~) ) fPpffg.PK D " 3 q'v
~~/<
.4<)
vi"x-; )ap~b qadi-."trirx.~var 0:"rs,
~.-<.i J-~~9 5sr>>,
x i '<;">x J JiM ZT
~ Iri~)f)"<a prci!')"s'~n")-"re 9 )'oi9>~vot'ro od') J~.,'~~.>>~d
-,aoni ~.;~) t-r A~ yf~f) rrr)a ', pi~
.,~ 9". iiJa ',),r."ix<-n~<
~
~ ~ B)~d
Containment Vessel valuation Program R. E. Ginna Nuclear Power Plant Docket No. 50-244 (4)
Subsequent visual inspection of the four adjacent tendons in accordance with Technical Specification 4.4.4.1 (e) revealed no broken wires.
(5)
Subsequent. lift-offtesting of two of the four adjacent tendons yielded lift-offforces of 701 kips and 724 kips.
Although predictions are not available for these
- tendons, the results are within the range of other tendon forces, thus indicating that no significant change in lift-offforce occurred in adjacent.
tendons.
Subsequent to realigning and detensioning tendon no.
75,'t was retensioned to a force equalling
.70 GUTS (+ 5S) of the remaining 66 effective wires.
This force value is equivalent to 532 Kips which is less than the minimum technical specification requirement of 636 Kips.
However, the adjacent four tendons, two on each side of no". 75, contribute adequate structural support in this region of the containment.
The minimum design requirement in terms of vertical membrane stress resultant is 636 Kips/2.13 ft.
(where 2.13 ft. is the tendon spacing) or 299 Kips per foot.
Based upon calculated average forces of the adjacent tendons,'he combined effect of the five tendons produce a stress resultant totalling 315 Kips per foot.
Therefore, the structural integrity in this region of the containment is maintained.
Further analysis is in progress to further refine a minimum required force for tendon no.
75.
Based on the fact that the cause of the broken wires on tendon no.
75 is known, that no other broken wires were found in the other 17 tendons which were originally part of the surveillance program or in the 4 adjacent tendons,'hat two adjacent tendons were tested for lift-offforce and showed no unusual results,'nd that average enforce in the vicinity of tendon no.
75 remains acceptable, we request a one-time exemption from the requirements for visual inspection in Technical Specification 4.4.4.1 (d).
Very truly yours,'.
E. Maier
E