Informs That Completion of in-house Engineering & Review of Consultant Work Re Control of Heavy Loads Has Necessitated Submittal Date Extension.Final Rept Will Be Submitted by 840201
ML17255A555
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/28/1983
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR NUDOCS 8312060293
Download: ML17255A555 (4)


Text

REGULATOR~NFORMATION DISTRIBUTION S TEM (RIDS)

.CLSSION NBR:831206o293, DOC, DATE: e3/11/28 NQTAR> ED:

NO DOCKET 0

SCIL:50 244 Robert Emmet Ginna Nuclear Planti Unit ii Rochester G

05000244 AUTH BYNAME AUTHOR AFFILIATION MAIERiJ ~ E, Rochester Gas L Electric Corp'EC IP i NAME RECIPIENT AFFILIATION CRUTCHF IELO p D, Operating Reactors Branch 5

SUBJECT:

Informs that completion of in-house engineer ing 8 review of consultant work re control of heavy loads has necessitated submittal date eat'ension.Final rept will be submitted by

e4o2o1, DISTRIBUTION CODE A033S COPIES RECEIVED:LTR ENCL SIZE; TITLE:

OR Submittal; USI A-36 Control of Heavy Load Near Spent Fuel"NUREG 06 NOTES:NRR/DL/SEP

1cy, 05000244 RECIPIENT IO CODE/NAME NRR ORB5 BC INTERNAL: NRR NEIGHBORS09 AEB G

04 COPIES LTTR ENCL RECIPIENT ID CODE/NAME NRR SINGHi A 01 NRR/DL/ORAB 12 NRR/DSI/ASI RGN1 COPIES LTTR ENCL EXTERNALS ACRS NRC PDR NTIS NOTES'3 02 LPDR NSIC 03 06

'v TOTAL NUMBER OF COPIES RE41UIRED:

LTTR 28 ENCL

H H

<< I H

'w'P>>

~ >>>>)>>'ll Wl, W HH>>f

>>IW f

y I)

') 'f

)H>>

lI

'I

~ ',,H

I ) 'll W

>>)

f >><<<<Ill )>>ll W>>

')

i ")<<>> f,)Ii H)

,,'+Hjf W

o f ~

) f I:I

~

>>W,

>>)g W ')

II If P'f "f)f )')')f>>

I>>I W<<II I

I-'b I

HW I

I III>>H">>

) I>>

W>>W>> r.) <<)

Wr,l

>> f g%/<<

III f <<>>>> <<)H) f >>>>f) fkr i

<<g~l>>

<<r f)r W.,

lr

.I)X II i>>IH f I I,,l W)H<<)

e 'f'off<<

'f <<)'>

If -)i'll 'I,,

>> )

I

(>>)W I

>>(Vl Ir)I <<

II <<)

)>>') ) H>>f>>,(

W>>IP HHHI I

\\

,H

)

)I

~ ff f II)

<< I I'I f.)>>

)jjf y)<

f

'g'1g f I

f

>> f J f, I f

~) II,)

)

f

<< I.)

>>fll )

1>>

II IHl I>>>>>>

)

g "if

>>>>blrll, I W'll f )>>>>

I >>I g f<<HIH'

r ammm zzezzzi A HID n(tgyzs sizrsst(l uuzXNP

~uzzz

/

ss Ass ROCHESTER GAS AND ELECTRIC CORPORATION

~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E, MAIER vie preeksens

'fCI.gPH0Ns:

ARsi coos: use 546-2700 November 28, 1983 Director of Nuclear Reactor Regulation Attention:

Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.

5 U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Control of Heavy Loads R.

E. Ginna Nuclear Power Plant Docket, No. 50-244

Dear Mr. Crutchfield:

Along with our submittal of March 2, 1983 regarding Control of Heavy Loads a Part Two submittal date was given of December 1,

1983.

The consultant contract work required for providing this response is nearing completion with some items outstanding.

The completion of in-house engineering and the review of consultant work has necessitated a submittal date extension.

Our final report on Control of Heavy Loads will be submitted by February 1,

1983.

Sincerely, J.

E. Maier 8312060293 831128 PDR ADOCK 05000244 p