Submits Proposal to Modify 830801 Request for Mod to Tech Spec 4.6.2.e Re SEP Topic VIII-3.A, Battery Testing. Each Battery Will Be Subj to Discharge Test at Least Once Per 60 Months to Show Battery Capacity at Least 80%
ML17255A494
Person / Time
Site: Ginna 
Issue date: 10/26/1983
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
TASK-08-03.A, TASK-8-3.A, TASK-RR NUDOCS 8311080352
Download: ML17255A494 (6)


Text

REGULATORY~IFORMATION DISTRIBUTION S'EM (RIBS)

ACCESSION NBR: 8311080352 DOC ~ O'ATE: 83/10/26 NOTARIZED:

NO DOCKET FACIL:50 244 Robert Emmet Ginna Nuclear Plant~ Unit li Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION MAIERe JOE ~

Rochester Gas 8,Electric Corp'EC IP ~ NAME RECIPIENT AFFILIATION CRUTCHFIELDg D ~

Operating Reactors Branch 5

SUBJECT:

Submits proposal

.to modify 830801 request for mod to Tech Spec 4 ~ 6 ~ 2 ~ e re SEP Topic VIII<<3,A< "Battery Testing,"

Each battery will be isubj to discharge test at least once per 60 months to =show battery capacity at least 80/,

DISTRIBUTION CODE ~

A035S COPIES RECEIVEDeLTR ENCL SIZEs 6

Z TITLE:

OR Submittal:

SEP Topic NOTES:NRR/DL/SEP icy, 05000244 RECIP IENT ID CODE/NAME NRR ORBS BC 01 INTERNALS NRR/DL/ORAB 11 NRR/DSI/AEB NRR/DSI/CSB 07 RGN1 COPIES LTTR ENCL RECIPIENT ID CODE/NAME NRR/DL/SEPB 12 SB LE 04 COPIES LTTR ENCL EXTERNAL; ACRS NRC PDR NOTES:

14 0?

6 1

LPDR NTIS 03 5

TOTAL NUMBER OF COPIES REQUIRED LTTR 22 ENCL

N N

0 1

II ftr W

~l f

.Vr >1 II 1'NWI K.

Nag I-N I

gf wf f>

I 'I(

f 1.I "I wl wry wy Wwf N

ew r

r 1

e e

5 ~

I

~

I I

f f II, l

Wjfwi Il

<w 1; 1

NN

'NK

~

K1 t 1 N' 0

1

'AII IN' 1

=I "I" frr 1

l

N 1

I ~

~ <<g f II t '. ~

Kyf d

1r>f '1 rw l f11

~eeeeemeee e eew>>

~

III 1

II ~ 1 1

g N

g I >,'K 1',y

~ fiaf II N

1

',w

~ II' f

I lw 4

II NI if l NT 1" ll 1

N W

3 1

t us~rrzs~

zwzsri"

SJI/gl ittss ZZ ROCHESTER GAS AND ELECTRIC CORPORATION

~ 89 EAST AVENUE, ROCHESTER. N.Y. 14649 JOHN E. MAIER Vico Prosldont TfLCPHONC ARE* CODE 7/o 546.2700 October 26, 1983 Director of Nuclear Reactor Regulation Attention:

Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.

5 U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

SEP Topic VIII-3.A, Battery Testing R.

E. Ginna Nuclear Power Plant Docket 50-244

Dear Mr. Crutchfield:

In our letter dated August 1,

1983, RG&E proposed that the Ginna Technical Specification 4.6.2.e be added, reguiring the performance of a battery discharge test at least once each 60 months.

This discharge test is suggested by IEEE-450, which was the review basis document for SEP Topic VIII-3.A.

An additional testing requirement of IEEE-450, not specifically committed to by RG&E during the topic assessment, (see letter from Maier to Crutchfield, January 15, 1982) concerns the freguency of the discharge test.

It is stated that the test should be performed annually whenever the battery shows signs of degradation or when 85% of the expected service life has been reached.

"Degradation" is indicated when the battery capacity drops more than 10% of rated capacity from its average or previous performance tests, or is below 90% of the manufacturer's rating.

RG&E agrees that the more frequent testing when battery capacity is below 90% of the manufacturer's rating is useful, and will incorporate such a provision into our proposed Technical Specifications.

However, RG&E does not believe that, in addition, the annual testing when 85% of expected service life is reached, is warranted.

RG&E considers that if the battery capacity is shown to be adeguate

(>90%), sufficient margin above the minimum requirement of 80% is demonstrated.

RG&E thus proposes to modify our Technical Specification modification request of August 1,

1983, as follows:

83ii080352 83i026 PDR ADOCK 05000244 P

PDR

l, i

'4 II

ROCHESTER GAS AND ELECTRIC CORP.

October 26, 1983 Mr. Dennis M. Crutchfield SHEET NO.

"4.6.2.e Each battery shall be subject to a discharge test at least once per 60 months.

The purpose of this test is to show that the battery capacity is at least 80% of the manufacturer's recommendations.

When performed, this discharge test may substitute for the load test.

4.6.2.f The discharge test shall be performed annually for any battery that shows signs of degradation.

Degradation is indicated when the battery capacity drops more than 10%

of rated capacity from its average on previous discharge

tests, or is below 90% of the manufacturer's rating."

Very truly yours, Jo n E. Maier

~

~