,ACCESSION NBR 8411010395" DOC ~ DATE 84/10/23 NOTARIZED NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant~ Unit ip Rochester G
05000244 AUTH BYNAME AUTHOR AFFILIATION KOBERiR ~ bti Rochester Gas 8, Electric Corp.
REC IP, NAME RECIPIENT AFFILIATION
- PAULSON,N ~ 4 ~
Operating Reactors Branch 5
1
SUBJECT:
Advises that'er 840924
- meeting, w/NRC 8
US Tool 8 Die're revised seismic analysis of 840402 submittalgspent fuel storage Rack 5 weld orientations inspected 8 verified as consistent w/calculations in 840927 ltd DISTRIBUTION CODE:
A001D COPIES RECEIVED;LTR ENCL SIZE ~
/
p
'ITLE:
OR Submittal:
General Distribution NOTES:NRR/DL/SEP 1cy ~
OL: 09/19/69 05000244 RECIPIENT ID CODE/NAME NRR ORBS BC 01 INTERNAL: ADM/LFMB NRR/DE/MTEB NRR/DL/DRAB NRR/DSI/RAB RGN1 COPIES LTTR ENCL 7
1 1
1 1
1 1
RECIPIENT ID CODE/NAME ELD/HDS4 NRR/DL DIR
/METB EG F IL 04 COPIES LTTR ENCL EXTERNAL; ACRS NRC PDR NTIS NOTES0 09 02 6
6 1
1 1
1 1
1 LPDR NSIC 03 05 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 27 ENCL ~2
r C
tt It II e
'I N
0 1
It I,
/
IIItIII IIIIIIIIII
///////
//////I/////
ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, HI,v LIE~ Oall&
ROCHESTER, N. K 14649-0001 ROGER W. KOBER VXe PtteSIOeNT ELECTRIC &STEAM PROOVCTtON
'tELEPHONE ARCA COOS Tle 546-2700 October 23I 1984 Director of Nuclear Reactor Regulation Attention:
Mr. Walter A. Paulsoni Acting Chief Operating Reactors Branch No.
5 U.S. Nuclear Regulatory Commission Washingtoni D.C.
20555
Subject:
Modification of Spent Fuel Storage Racks R. E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Paulson:
On September 24I 1984 members of the NRC staff met with representatives of Rochester Gas and Electric Corporation and its contractor U. S. Tool and Die to discuss the revised seismic analysis for our submittal of April 2I 1984.
During this meeting we agreed to verify'the weld orientation in the racks when a rack was removed from the pool.
On October 22, 1984 Mr. John Cook (RG6E) and Mr. Dale Michel (USTD) inspected Rack 5 and verified that the orientation of the welds in the rack was consistent with that indicated on Figure 5.2.1 of the mechanical analysis attached to our September 27I 1984 letter.
This orientation was used in the calculations.
r truly yoursi R
er W. Kober e~iiOi03g.05000244