REGULATORY NFORMATION DISTRIBUTION SYo EM (RIDS)
ACCESSION NBR;8009120344 DOC ~ DATE: 84/09/07 NOTARIZED'O DOCKET FACIL:50 244 Robert Emmet Ginna Nuclear Plantg Unit li Rochester G
05000204 AUTH BYNAME AUTHOR AFFILIATION KOBER~R,N, Rochester Gas 8 Electric Corp.
RECIP ~ NAMF RECIPIENT AFFILIATION PAULSON~N ~ A, Operating Reactors Branch S
SUBJECT! Advises that mods ll procedure changes re main hoist of auxiliary bldg crane will be'ompleted prior to handling, spent fuel caskiper commitment re control of heavy loads>
DISTRIBUTION COOK@
A033D COPIES RECEIVED!LTR ENCL
'IZE!
(
TITLE:
OR Submittal:
USI A 36 Control of Heavy Load Near Spent Fuel NOTES:NRR/DL/SEP 1cy ~
OL!09/19/69 REG~06 OS000204 RECIPIENT ID CODE/NAME NRR ORBS BC INTERNAL; ADM/LFMB NRR/DL/ORAB 12 NRR/OS I/AEB 00 COPIES LTTR ENCL REC IP IFNT ID COOK/NAME NRR SINGHgA 01 NRR NEIGHBORS09 NRR/DL/TAPMG NRR/OSI/ASI RGN1
'COPIES LTTR EN EXTERNALt ACRS NRC POR NTIS NOTES:
13 02 LPDR NSIC 03 06 TOTAL NUMBER OF COPIES RKQUXRKDI LTTR 30 ENCL 9
I
~ )
I )
II l
~
~
~
~
W'lh"I f
Q I
Ill $
F g
1 l
f h
Wl
')
l ggiy WF H
4 I
~
W FI
z",izn izem AIVO
~
dE/
mls zsuivzr/
~~/ '.~c ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 ROGER W. KOBER VICE PRESIDENT ELECTRIC &STCAM PRODUCTION TSI.KPHONC ARc* coDE TIs 546.2700 September 7>
1984 Director of Nuclear Reactor Regulation Attention:
Mr. Walter A. PaulsonT Acting Chief Operating Reactors Branch No.
5 U.S. Nuclear Regulatory Commission WashingtonT D.C.
20555
Subject:
Control of Heavy Toads R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Paulson:
This letter is in response to a request from members of the NRC Staff.
In Section 4.0 of the Attachment to our letter dated July 31, 1984 regarding control of heavy loads, we committed to modify the main hoist of the auxiliary building crane and to complete certain procedure changes.
These modifications and procedures changes will be completed prior to handling a spent fuel cask.
V r truly yours>
~tJ Roger W. Kober 8409>P0344 840907 PDR ADOCK'5000244 L'" P.'DR