1 the tendon containing 6 broken wires) shall be inspected.
The acceptance criterion then shall be no more than 4 broken wires in any of the additional 4
tendons.
If this criterion is not satisfied, all of the tendons shall be inspected and if more than 5% of the total wires are broken, the reactor shall be shut down and depressurized.
4.4.4.2 Pre-Stress Confirmation Test a ~
b ~
Lift-offtests shall be performed on the 14 tendors identified in 4.4.4.la
- above, at the intervals specified in 4.4.4.1b.
If the average stress in the 14 tendons checked is less than 144 000 psi (60% of ultimate stress), all tendons shall be checked for stress and retensioned, if necessary,
.to a stress of 144,000 psi.
Before reseating a tendon, additional stress (6%)
shall be imposed to verify the ability of the tendon to sustain the added stress applied during accident conditions.
N'
~
~ ~
Containment Isolation Valves 4 ~ 4 ~ 5 ~ 1 Each isolation valve specified in Table 3.6-1 shall be demonstrated to be operable in accordance with the Ginna Station Pump and Valve Test Program submitted in accordance with 10 CFR 50.55a.
4.4 '
4.4 '.1 Containment Isolation Res onse Each containment isolation instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION, and CHANNEL FUNCTIONAL TEST operations for the NODES and at the frequencies shown in Table 4.1-1.
4 ~ 4 ~ 6 ~ 2 The
RESPONSE
TINE of the containment isolation valves, as listed in Table 3.6-1, shall be demonstrated to be within the limit at least once per 18 months.
This response time includes only the valve travel times for all valves that change position.
85p8lap2p4 85p8p9 PDR ADOCK P5PPPgyg I
P PDR 4.4-11 Amendment No. )$ 11, Corrected August 9, 1985