ML17254A465

From kanterella
Jump to navigation Jump to search
Amend 8 to License DPR-18,changing Tech Specs to Allow Low Power Physics Testing Prior to or During Certain Valve Testing
ML17254A465
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/25/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17254A468 List:
References
NUDOCS 8507310057
Download: ML17254A465 (5)


Text

~R REgg 0

Cy A,0O IVl0

+~

~o

++*++

UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 ROCllESTFR GAS AND ELECTRIC CORPORATION DOCKET NO. 50-244 R.

E.

GINNA NUCLEAR POMER PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 8 License No.

DPR-18 1.

The Nuclear Regulatory Commission (the Commission) has fnund that:

A.

The application for amendment by Rochester Gas and Electric Corporation (the licensee) dated September 13, 1982 complies'with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

ThI issuance of this amendment will not be inimical to the common defense and secur ity or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

850731'0o57-805OOOP'Pg PDR aDOCH 05O PDR P

I J

t I

l S

,l t

Accordingly, the license is amended hy changes to the Technical Specificatinns as indicated in the attachment to this license amendment and Paragraph 2.C(2> of Facility Operating License No.

DPR-18 is hereb:

amended tn read as follows:

(2)

Technical S ecifications The Technical Specifications contained in Appendi:: /',

as revised through Amendment No. 8

, are hereby incorporated in the licen e.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date nf its issuance.

FOR THE NUCLEAR REGU AT Y COYVISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

July 25, 1985.

John A. Zwolinski, Chief Opera ing'eactors Branch P5 Division of Licensing

ATTACHMFNT TO LICENSE AMENDMENT NO. 8 FACILITY OPERATING LICENSE NO.

DPR-18 DOCKFT HO. 50-2<4 Revise Appendix A Technical Specifications hy removing the pages identified belni; and inser+ing the enclosed pages.

The revised pages are identified by th~ car..ioned amendment number and contain marginal lines indicating the area of change.

RFMOVE 4.3-2 INSERT

4. 3-2

4.3.3 Check Valves 4.3.3. 1 Leakage testing of check valves 853A, 8538, 867A, 867B, 878G and 878'hall be accomplished prior to criticality, except for low power physics testing, following (1) refueling, (2) cold shutdown,'nd (3) maintenance, repair nr replacement work on the va".ves.

Leakage may be measured indirectly from the performance of pressure indicators, system volume measurements or hy direct measurement.

Minimum test differential pressure shall be greater than 150 psid.

See 4.3.3.4 for allowable leakage rates.

4.3.3.2 Check valves 878G and 878J will be tested for leakage following each safety injection flow test.

Minimum test differential pressure shall he greater than 150 psid.

See 4.3.3.4 for allowable leakage rates.

4.3.3.3 Motor-operated valves 878A and 878C and check valves 87?A, 8778,

878F, and 878H shall be tested at the first refueling outage following the date of this order* to individually assure integrity of at least two of the three pressure boundaries in each hot leg high-head safety injection path.

Testing shall also be performed

. after any opening of either motor-operated valve and at a minimum, once every 40 months.

Opening of the motor-operated

valves, and
testing, are to be performed at a test pressure less than that of the
  • YRf/8/Add/d/idd/+Hi'7/N7/IHHi
4. 3-2 Amendment No. 8