Text
/
REGULATORY 1
RMATION DISTRIBUTION SYST (RIDS)
ACCESSION NBR>e507090138 DOC,DATE: 85/07/03 NOTARIZED:
NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant~ Unit li Rochester G
05000244 AUTH BYNAME AUTHOR AFFILIATION KOBERgR ~
WE Rochester'as 8 Electric Colp.
RECIP ~ NAME~
RECIPIENT AFFILIATION ZWOLINSKIg D', A ~
Operating Reactors Branch 5
SUBJECT:
ards Rev 6'o QA manual App C re inservice pump tt valve te ing program or Jan 196
- Dec
- 1984, DISTRIB
-CO E:
047 OPIES EI:LTR j ENCL J SIZE e TITLE:
OR 'Submi ttal: Inser vice nspection/Test7ng NOTES:NRR'/DL/SEP 1cy, OL: 09/19/69 05000204 REOIP IENT ID CODE/NAME; NRR ORB5 BC 01 INTERNAL'e ACRS le ELD/HDSO N
MTE8 10 REG FIL OQ COPIES LTTR =ENCL 7
7 10 10 1
0 1-1 1
1 RECIPIENT ID CODE/NAME ADM/LFMB NRR/DE/MEB 15 NRR/DL/TAPMG RGN1 COPIES LTTR~ ENCL" 1
0 1
1 1
1 1
EXTERNAL; 24X NRC PDR NOTES 0?"
1 1
1 1
1 LPDR NSIC 03 05 1
1 1
1 TOTAL NUMBER'F COP IES" REQUIRED!" LTTR 29 ENCL<
27
0 0
J
'I 1
~
'l II l
~
r h
'1 t
~
C l
t W
1 l
II N
II h,
/iiii/iiii zest LME 0%1A ~
/ Tlgjjll/lllllllll
(/I//~it suzzz ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 ROGER W. KOBFR VCe PRESlomr ELECTRIC G STEAM PROOtJCTION TELEPHONE AREA cooE T10 546.2700 July 3, 1985 Director of Nuclear Reactor Regulation Attn:
Mr. John A. Zwolinski, Chief Operating Reactor Branch Number 5
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Subj ect:
Inservice Pump and Valve Testing Program R.
E. Ginna Nuclear Power Plant Doc ket Number 50-244 Lear Mr. Zwolinski:
Enclosed is Revision 6 to the Ginna Station Quality Assurance Manual, Appendix C, which describes the Inservice Pump and Valve Testing Program for the January 1,
1981 through December 31, 1989 testing period.
This revision further revises Revisions 3,
3A and 4 submitted on December 21, 1982, June 20, 1983 and Lecember 21, 1983 respectively.
The changes are threefold and include (1) a one-year shift in internal start and end dates to coincide with the other inspection program intervals and consistent with Ammendment 5
to the Ginna Full-Term Operating License issued June 19, 1985; (2) inclusion of reactor head vent solenoid valves into the test program; and (3) a change in the testing requirements for two sample isolation valves.
The changes are shown by a solid line in the left-hand margin on Pages 2,
5, 21, 23, 24 and 39.
Although the margin lines identify only the location of Revision 6 changes, the submittal contains all pages of the current Pump and Valve Testing Program.
r truly yours, R
er W. Kober Enclosure 8507090138 850703 PDR ADaCN, 05000244 P