Amend 3 to License DPR-18,eliminating Descriptive Battery Charger Wording,Specifically 75 & 150 Ampere Chargers
ML17254A296
Person / Time
Site: Ginna 
Issue date: 04/01/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17254A297 List:
References
NUDOCS 8504040272
Download: ML17254A296 (5)


Text

gP,S AK00

~Ci Vp

+

O~

p 4u fl C

0 lp lO

++*+~

C O

UNITEDSTATES NUC EAR REGULATORY COIVIMISSION WASHINGTON, D. C. 20555 ROCHESTER GAS AND ELECTRIC CORPORATION DOCKET NO. 50-244 R.

E.

GINNA NUCLEAR POWER PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

3 License No.

DPR-18 l.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

B.

C.

D.

E.

The application for amendment by Rochester Gas and Electric Corporation (the licensee) dated December 5,

1984, complies with the standards and requirements of the Atomic Energy Act of l954, as amended (the Act), and the Commission's rules and regulations set forth in 1.0 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules arid regulations of the Commission; There is reasonable assurance (i) that the activities authorized.

by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities wil'1 be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 5l of the Commission's regulations and all applicable requirements have been satisfied.

8504040272 850401 PDR ADOCK 05000244 PDR

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C(2) of Facility Operating License No.

DPR-18 is hereby amended to read as follows:

(2)

Technical S ecifications The Technical Specifications contained in Appendix A, as revised through'mendment No.

3

, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

Attachment:

Changes to the Technical Specifications

- Date of Issuance:

April 1, 1985.

FOR E NUCLEAR REGULAT RY COMMISSION

\\

Joh A. Zwolinski, Chief Oper ting Reactors Branch t5 Division of Licensing

ATTACHMENT TO LICENSE AMENDMENT NO. 3 FACILITY OPERATING LICENSE NO. DPR-l8 DOCKET NO. 50-244 Revise Appendix A Technical Specifications by removing the pages identified be1ow and inserting the enclosed pages.

The revised pages are identified by the captioned amendment number and contain marginal 1ines indicating the area of change.

REMOVE

3. 7-l 3.7-4 INSERT
3. 7-l 3.7-4

~ ~

3.7 AUXILIARYELECTRICAL SYSTENS A plicabilit Applies to the availability of electrical power for the operation of plant auxiliaries.

To define those conditions of electrical power availability necessary (1) to provide for safe reactor operation>

and (2) to provide for the continuing availability'of engineered safeguards.

S ecification 3.7.1 The reactor shall not be maintained critical without:

a.

The 34.5 KV-4160 Volt station service transformer in service.

b.

480-volt buses>

14>

16>

17 and 18 energized.

c.

4160-volt buses 12A and 12B energized.

d.

Two diesel generators operable with onsite supply of 10<000 gallons of fuel available.

e.

Both batteries and,both d.c.

systems operable<

and battery chargers with a capacity of at least 150 amps in service for each battery.

3.7.2 During reactor operation the requirements of 3.7.1 may be modified as follows:

3 \\ 7 1

Amendilient No.

3

N maintain the containment pressure within the design value.

The minimum diesel fuel oil inventory at all times is maintained to assure the operation of both diesels carrying design load of all the engineered safeguards equipment for at least 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />.

Commercial oil supplies and trucking facilities exist (1) to assure deliveries within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

Battery chargers with at least 150 amps capacity shall be in service for each battery so that the batteries will always be at full charge.

This ensures that adequate dc power will be available.

The plant can be safety shut down without the use of offsite power since all vital loads (safety systems>

instruments, etc.)

can be supplied from the. emergency diesel generators.

The two diesel generatorsI each capable of supplying safeguards loads<

and the station'auxiliary transformer provide three separate sources of power immediately available for operatio'n of these loads.

Thus>

the power supply system meets the single (2) failure criteria required of safety systems.

References:

(1)

FSAR Section 8.2.1 (2)

FSAR Appendix 8A 3 ~ 7 4

Anendment No. 3