Forwards Outline of Proposed Load Testing Program for Proposed Mod to Auxiliary Bldg Crane,Per NUREG-0554.Test Loads Will Be Lifted Only Inches Off Transporting Truck Bed to Avoid Potential Consequences of Load Drop
ML17254A159
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/02/1985
From: Kober R
ROCHESTER GAS & ELECTRIC CORP.
To: Zwolinski J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0554, RTR-NUREG-554 NUDOCS 8501080185
Download: ML17254A159 (6)


Text

REGULATORY i.

ORMATION DISTRIBUTION SYS 9 (BIDS)

SUBJECT:

Forwards outline of proposed load testing program for proposed mod to auxiliary bldg crane per NUREG-0554 'est loads will be lifted only inches off transporting truck bed aVoid potential consequences of load drop, DISTRIBUTION CODEe H001D COPIES RECEIVED:LTR ENCL TITLE: File Location Distribution: Docket 50 SIZE:

ACCESSION NBR e 8501080185 DOC, DATE: 85/01/02 NOTARIZED:

NO DOCKET FACIL;50-244 Robert Emmet Ginna Nuclear Plant~ Unit 1r Rochester G

05000204 AUTH INANE AUTHOR AFFILIATION KOBERgR AN, Rochester Gas L Electric Corp.

REC IP ~ NAME RECIPIENT AFFILIATION Zl'lOLINSKIp J ~ A ~

Operating Reactors Branch 5

NOTES:NRR/DL/SEP

1cy, OL:09/19/69 05000240 RECIPIENT ID CODE/NAME INTERN:

REG FILE 01 COPIES L'TTR ENCL RECIPIENT ID CODE/NAME COPIES LTTR ENCL EXTERNAL: LPDR NTIS NOTES; 03 00 NRC PDR 02 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 5

ENCL 5

1 r

¹4 ft O'U,t ',

I II

ZPI' HI OIIla

>'II I'SWrnz 8Z.::::

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 ROGER W, KOBER VICE PRESIDENT ELECTRIC R STEAM PRODUCTION TELEPHONE ARE* CODE 7I6 546-2700 January 26 1985 Director of Nuclear Reactor Regulation Attention:

Mr. John A. Zwolinskii Chief Operating Reactors Branch No.

5 U.S. Nuclear Regulatory Commission Washingtoni D.C.

20555

Subject:

Auxiliary Building Crane Modification R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Zwolinski:

In a letter dated January 18, 1984< Rochester Gas and Electric requested a change in the Technical Specifications to allow handling of a spent fuel shipping cask at Ginna.

This request was based upon a proposed modification of the 40T Auxiliary Building Crane to satisfy the requirements of NUREG-0554.

In Section 8 of NUREG-0554I the requirements for load testing state that "The tests should include all positions generating maximum strain in the bridge and trolley structures...."

In response to NRC Staff questionsE we are taking exception to this requirement to the extent that the 50% and 125% test loads will be lifted only inches off the bed of the transporting truck and will not be moved to other positions in the auxiliary building".

This is necessary because of the potential consequences of the load drop from greater heights in an operating plant.

A brief outline of the proposed testing program is attached.

Note that the program will be in accordance with ANSI B30.2.0.

er truly yoursi e./

R er W. Kober 850i 080185 850 joe PDR

  • DOCK 05000244 P

PDR oo/

CW 1'g

Load Testin Pro ram For Modified 30-Ton Crane I.

Preliminary Tests Unreeved Condition A.

Check Main and Auxiliary Hoist motions in all directions<

adjust as, necessary.

B.

C.

Check Trolley Motion> adjust as necessary.

Check Bridge Notion> adjust as necessary.

II.

Load Tests Fully Reeved A.

B.

No-Load Test check hook motion at all elevations.

50% Load Test 1.

Check capacity over Low-boy Trailer in Auxiliary Building Truck lane.

2.

Test to be "inches only"< enough to determine proper braking.

C.

3.

Adjust as necessary and repeat if needed.

125% Load Test Check Capacity over Low-boy Trailer in Auxiliary Building.

2.

Test to be "inches only" > enough to determine proper braking..

NOTE:

Testing to be in accordance with ANSI B30.2.0.

2Property "ANSI code" (as page type) with input value "ANSI B30.2.0.</br></br>2" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process..

The 125% load will not be moved by the trolley or bridge>

the capacity check will be by the Main Hoist only

J lt