Letter Regarding a 01/03/1973 Conversation Concerning Dilution of Boron Solution in the Standby Liquid Control Tank - Dresden Unit 3
ML17252B005
Person / Time
Site: Dresden Constellation icon.png
Issue date: 01/09/1973
From: Worden W
Commonwealth Edison Co
To: Grier B
US Atomic Energy Commission (AEC)
References
Download: ML17252B005 (2)


Text

  • r

-\\._,::.

,,, l',~

REGULATORY OPERATIONS, REGION III A.

RO Inspection Report No.

Transmittal Date i.

Distribution:

RO Chief, l{.T&OB or RO Chief, RCR RO:HQ. (5)

DR Central Files Regulatory. Standards (3)

Lic;:ensing (13).

B.

RO Inquiry Report No.

Transmittal Date

    • Distributio:i.:

. RO Chief,

~:f::&OB or RO Chief, RCB (2_)

RO:HQ (5)

DR Central Files Regulatory Standards (3)

Licensing (13)

Distribution:

RO Chief, M&FFB

  • RO:HQ (4)****

L:D/D for Fuel & Materials

  • . DR Central. Files Distribution:

RO Chief, N&FFB.

RO:HQ DR Central Files I

I I I

I I

c.

Incident Notification From:

Commonwealth Edison (Dresden 3)

DPR.:..25 (Licensee & Docket No. (or License No.)

g:}c(:I

()~--ZtJ.

Transmittal Date January 9, 1973

~~----"'------'--'-~~~~~~~~~~~~~

Distribution:

RO Chief, RT&OB or RO Chief,_ RCB RO:HQ (4).

Licensing (4)

DR Central Files

  • Distribution:

RO Chief, H&FFB..

RO:HQ (4)

L:D/D fdr Fu~l & Materials DR Central Files I

I l [

C.

(*

c

SUBJECT:

D.P.R.-25 DRESDEN NUCLEAR POWE-R. STATION UNIT 3: *

~

IH!S WILL CONFIRM A CONVERSATION WITH :MR* H. DANCE OF YOUR OFFICE*

AT 1630 HOURS. JANUARY 3 CONCERNING DILUTION o'F BORO~ SOLUTION IN*..

  • THE STAND BY LIQUID CONTROL TANK. ON JANUARY :i.,3 AT 063L HOURS THE. **.

STAND BY LIQU.ID CONTROL TANK WAS SUPPOSEDLY P;LACED.ON* A IR.SPARGE::::*

THIS WAS DONE IN PREPARATION FOR A BORON SAMPLE TO BK TAKEN LA.IER...... -. _

.. ----., ~**--,~.. ~* -

(

>-:i:-120 1 ~Ji.-DAY. BY 0810 HOURS IT WAS REPORTED THAT THE TANK 11/AS OVER FLOWING

(

(

. 0

\\nAr:*VALUE CHECK ON THE SYSTEM DETERMINED THAT (lN ADDITION TO THE AIR SP.*

!"~J l. \\~I~*....

ARGE VAL.VE, A WATER FILL VALVE WAS ALSO OPEN. THE WATER FILLED VALVE WAS

.CLOSED AND A BORON SAMPLE WAS TAKEN TO DETERMINE THE BORON'CONCENIRAT ION.

AI THE SAME TIME, IN ANTICIPATION OF THE CONCENTRATION BEING TOO LOW I

I'

\\,

(

~

(

(

-l

(

(

(

(

(

(

(

AN ORDERLY SHUT DOWN. WAS INITIAIED.

.... 1

r

( :

A DISCUSS ION WITH IHE PEOPLE: ON SHIFT REVEALED. THAT THE OPERATOR.,

(

(

I

(
'r
    • . '* '*,~

. ERRORED IN VVALVING IN THE IANK FOR AiR SPARGE*.A. REVIE1.(;0F.*

. * (

. *OPERATING. PROCEOURES WILL 8£ MADE.ro DET~RMINE' IF*~ REvi110N 'oR..

ADDITION CAN BE MADE TO ELIMINATE THE ~OSSIBILITY OF THIS SIIUATION F R0£1 RE-.

(

~

OCCUR!NG. AT THIS TIME LOAD 15 BEING REDUCED AT THE RATE OF g M~W.E.

l

(._

SF-1201 (R5-69}

PER.HOUR THIS LOAD DROP WILL c'oNTINUE UNTIL' EITHER THE. UNIT TS SHUT.

(

DOWN OR THE BORON CONCENTRATION IS WIJKIN LIMITS SHOW~ IN FIGURE *

(

3.4.1 OF TECHNICAL. SPECIFICATION

(

. (

(

W* Po WORDEN, SUPT~

COMMONWEALTH EDISON DRESDEN NUCLEAR POWER STATION RT 1 MORRIS ILL JAN 8. 1S7J

(

(.

(

  • ,..