REGULATORY OPERATIONS, REGION III A.
RO Inspection Report No.
Transmittal Date i.
Distribution:
RO Chief, l{.T&OB or RO Chief, RCR RO:HQ. (5)
DR Central Files Regulatory. Standards (3)
Lic;:ensing (13).
B.
RO Inquiry Report No.
Transmittal Date
- Distributio:i.:
. RO Chief,
~:f::&OB or RO Chief, RCB (2_)
RO:HQ (5)
DR Central Files Regulatory Standards (3)
Licensing (13)
Distribution:
RO Chief, M&FFB
- RO:HQ (4)****
L:D/D for Fuel & Materials
- . DR Central. Files Distribution:
RO Chief, N&FFB.
RO:HQ DR Central Files I
I I I
I I
- c.
Incident Notification From:
Commonwealth Edison (Dresden 3)
DPR.:..25 (Licensee & Docket No. (or License No.)
g:}c(:I
()~--ZtJ.
Transmittal Date January 9, 1973
~~----"'------'--'-~~~~~~~~~~~~~
Distribution:
RO Chief, RT&OB or RO Chief,_ RCB RO:HQ (4).
Licensing (4)
DR Central Files
- Distribution:
RO Chief, H&FFB..
RO:HQ (4)
L:D/D fdr Fu~l & Materials DR Central Files I
I l [
C.
(*
c
SUBJECT:
D.P.R.-25 DRESDEN NUCLEAR POWE-R. STATION UNIT 3: *
~
IH!S WILL CONFIRM A CONVERSATION WITH :MR* H. DANCE OF YOUR OFFICE*
AT 1630 HOURS. JANUARY 3 CONCERNING DILUTION o'F BORO~ SOLUTION IN*..
- THE STAND BY LIQUID CONTROL TANK. ON JANUARY :i.,3 AT 063L HOURS THE. **.
STAND BY LIQU.ID CONTROL TANK WAS SUPPOSEDLY P;LACED.ON* A IR.SPARGE::::*
THIS WAS DONE IN PREPARATION FOR A BORON SAMPLE TO BK TAKEN LA.IER...... -. _
.. ----., ~**--,~.. ~* -
(
>-:i:-120 1 ~Ji.-DAY. BY 0810 HOURS IT WAS REPORTED THAT THE TANK 11/AS OVER FLOWING
(
(
. 0
\\nAr:*VALUE CHECK ON THE SYSTEM DETERMINED THAT (lN ADDITION TO THE AIR SP.*
!"~J l. \\~I~*....
ARGE VAL.VE, A WATER FILL VALVE WAS ALSO OPEN. THE WATER FILLED VALVE WAS
.CLOSED AND A BORON SAMPLE WAS TAKEN TO DETERMINE THE BORON'CONCENIRAT ION.
AI THE SAME TIME, IN ANTICIPATION OF THE CONCENTRATION BEING TOO LOW I
I'
\\,
(
~
(
(
-l
(
(
(
(
(
(
(
AN ORDERLY SHUT DOWN. WAS INITIAIED.
.... 1
- r
( :
A DISCUSS ION WITH IHE PEOPLE: ON SHIFT REVEALED. THAT THE OPERATOR.,
(
(
I
- (
- 'r
- . '* '*,~
. ERRORED IN VVALVING IN THE IANK FOR AiR SPARGE*.A. REVIE1.(;0F.*
. * (
. *OPERATING. PROCEOURES WILL 8£ MADE.ro DET~RMINE' IF*~ REvi110N 'oR..
ADDITION CAN BE MADE TO ELIMINATE THE ~OSSIBILITY OF THIS SIIUATION F R0£1 RE-.
(
~
OCCUR!NG. AT THIS TIME LOAD 15 BEING REDUCED AT THE RATE OF g M~W.E.
l
(._
SF-1201 (R5-69}
PER.HOUR THIS LOAD DROP WILL c'oNTINUE UNTIL' EITHER THE. UNIT TS SHUT.
(
DOWN OR THE BORON CONCENTRATION IS WIJKIN LIMITS SHOW~ IN FIGURE *
(
3.4.1 OF TECHNICAL. SPECIFICATION
(
. (
(
W* Po WORDEN, SUPT~
COMMONWEALTH EDISON DRESDEN NUCLEAR POWER STATION RT 1 MORRIS ILL JAN 8. 1S7J
(
(.
(
- ,..