Commonwe..AEdison One First Nation~za, Chicago, Illinois Address Reply to: Post Office Box 767 Chicago, Illinois 60690 WPW Ltr. #633-73 A. Giambusso Deputy Director for Reactor Projects Directorate of Licensing U.S. Atomic Energy Coamisston Washington, D.C.

20545 50-249 Dresden Nuclear Power Station a:* *a.* 11 Morris, IL 60450 August 23, 1-973

SUBJECT:

License DPR-25, Dresden Nuclear Power Station, Unit li3, Section 6.6.C.l of the Technical Sp~cifications~ Fast Closure of MSIV 3-203*1B.

Reference:

Letter from W. P. Worden to A. Giambusso dated August 7, 1973, concerning fast closure time -of "lB" MSIV.

Dear Mr. Giambusso:

As per reference 1, this letter is to inform you of the results of the investigation of the fast closure of "lB" MSIV-*.

On August 8, 1973, the oil level in the valve operator was checked and found to be satisfactory.

The other causes of this drift in valve timing cou~d not be determined.

The valve was retimed to close in 3.7 secs, which is within the 3 to 5_sec Technical Specification limits, and returned to service.

The timing of this valve will be closely followed in the future.

WPW:RLW:slb cc:

P'il_e/ >.y.C Corr cat I Sincerely,

~.v.~~

w. P. Worden Superintendent Dresden Nuclear Power Station