Letter Confirming a 10/29/1973 Conversation Concerning Failure of the Air Start System on Diesel Generator Number 3 - Dresden Unit 3
ML17252A948
Person / Time
Site: Dresden 
Issue date: 11/09/1973
From: Worden W
Commonwealth Edison Co
To: Anthony Giambusso
US Atomic Energy Commission (AEC)
References
Download: ML17252A948 (3)


Text

UNITED STATES ATOMIC ENERGY COMMISSION DIVISION OF COMPLIANCE REGION Ill 799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS 60137 A.

RO Inspection Report No.

Transmittal Date Distribution:

RO Chief, FS&EB RO:HQ (5)

Distribution:

RO Chief, FS&EB

  • RO:HQ (4)

TELEPHONE (31 Z) 858-Z660 DR Centra 1 Files Regulatory Standards (3)

Licensing (13)

L:D/D for Fuel & Materials DR Central Files RO Files' B.

RO Inquiry Report No.

Tranamittal Date Distribution:

RO Chief, FS&EB RO:HQ (5)

DR Central Files Regulatory Standards (3)

Licensing (13)

RO Files RO Files Distribution:

RO Chief, FS&EB RO:HQ DR Central.Files RO Files C.

Incident Notification From: Commonwealth Edison Co.

(Licensee & Docket No. (o No.)

Transmittal Date Distribution:

RO Chief, FS&EB RO:HQ (4)

Licensing (4)

DR Central Files RO Files November 9, 1973 Distribution:

RO chief, FS&EB RO:HQ (4)

L:D/D for Fuel & Materials DR Central Files RO Files

...,1... -u.... 1.,...... _-

~-.-'**,*:** *:: -

~

  • --~* ~""'VE.£195C1542) Cl-020684C302> PD 10/29/73 154*0 I,, *1 *" o'.. 1.. ? o

'=* ',

~_1 : L.: u~

J

.1

\\,

, __,,i I r 1 lC.::i l?MVEIC MVN 03169 TDVE MORRIS ILL. 125 10-29 1145A CST PMS JAMl:S G KEPPLER REGIONAL DIR_ECTOR DIRECTORATE OF REGULARITY OPERATIONS REGION 3 US ATOMIC ENERGY COMMISSION 799 ROOSEVELT RD GLEN ELLYN ILL 60137

)UBJECT D?R-25 DRESDEN NUCLEAR POWER-STATION UNIT 3.

IHl~ WILL CONFIRf1 A COONVERSATION WITH MR F MAURA OF YOUR OFFICE AI 1120 HOURS THIS DATE CONCERNING A FAILURE OF THE AIR START SYSTEM ON DIESEL GENERATOR NUMBER 3.

ON OCTOBER 28, 1973 AT 910AM FOR UNIT 3 WAS IN THE COLD CH£CK DOWN CONDITION DIESEL GENERAI~~ NUMBER 3 WAS GIVEN A START SIGNAL FOR SOME PLANNED TESTING. INSUFFICIENT

>IARTING. AIR LINE AND THE DIESEL STARTED AND OPERATED SATISFACTORILY *. 2/3 DIESEL GENERATOR WAS ALSO STARTED SF-1201 (R5-69)

... :~

~:--

  • -**-**---~ -*-**

AND LOADED TO VERIFY lI.S OPERABILITY. AN INVESTIGATION INTO THE CAUSE OF FAILURE l.;;) UNDERWAY W P WORDEN SUPERINIENDENI DRESDEN NUCLEAR POWER.STATION CO!rJMONWEAL IH EDISON COMPANY RO UTE 1 MORR IS ILL OCT 3 1 SF-1201 (R5-69)

/

  • li:'.1.t*.-, n\\f *
  • *!-_~~

~~:;;:.

--......-.... ~*-

e

... \\

\\

+

50-249 i1iU WSH U.S'. *ATOMIC E~ERGY co~~

. t-wx.UNIT ICS IPMVEIC tlVN 03170 TOVE MORRIS ILL 125.1~-29 1145A CST PMS.4 GIAMBUSSO DEPUTY D.-IRECTOR FOR REACTOR PROJECTS illRECTORATE OF LICE~SING US ATOMJC ENERGY COMMISSION 1.-.iASHINGTON DC 205/iS SUBJECT DPR'."'25 DRESDEN NUCLEAR POl.JER STATION UNIT 3.

)*....

~IS WILL CONFIRM A COONVERSATfdN WITH 'MR F MAURA OF YOUR OFFICE AT 1120 HOURS THIS DATE CONCERNING A FAILURE OF THE AIR START SYSTEM ON DIESEL GENERATOR NUMBER 3.

~OCTOBER Bl 1973.AT 910AM FOR UNIT 3 WAS iN TH£ COLD

~ECK DOWN CONDITION. DIESEL GENERATOR NUMBER 3 WAS GIVEN A START ~IGNAL FOR SOME PLANNED' TESTING* INSUFFICIENT I

STARTING AIR Li~E AND THE DIESEL ~TARTED AND OPERATED SATISFACTORILY* 2/3 DIESEL GENERATOR WAS.4LSO STARTED A~D1LOADED TO VERIFY ITS OPERPl.BILITY. AN INVESTIGATION :INTO Ti-IE CAUSE OF FAILURE IS UNDERWAY 1-J P WORDEN

/

I SUPERINTENDENT DRESDEN NUCLEAR POWER ST~TION COMMONWEALTH EDISON COMPANY ROUTE 1 MORRIS ILL 823PEDT

+