ML17252A929
Jump to navigation
Jump to search
| ML17252A929 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 01/21/1974 |
| From: | Worden W Commonwealth Edison Co |
| To: | James Keppler US Atomic Energy Commission (AEC) |
| References | |
| Download: ML17252A929 (1) | |
Text
VEC239 <l ~30> <1*032874CO17> PD o 11\\lf\\f :ti.U jtllf.MJ!:\\li77 PH 4: 4 7 03190 T.DVE l'DRRIS IL 98 01* 17 3 l5P CDT.
/-_:;./--/'/
ICS IPl'IVEI C
- MVN PMS "R JAMES G KEPPLER REGIONAL 'DIRECTOR DIRECTORATE OF REGULA.TORY OPERATIONS REGION 13 US ATOIUC ENERGY COMMISSION WUX 79, ROOSEVELT ROAD GLEN ELLYN IL i0137 SUBJECT DPR-25 DRESDEN NUCLEAR POWER STATION UNIT 13 THIS WILL CONF'IRN A CON\\IERSATIQN WITH fl1R F MAURA OF YOUR-OFFICE AT 1415 HOURS THIS.DATE CONCERNING A FAILURE OF THE 3A ELECTROMATIC RELEASE VALE TO OPEN. THE FAILURE WAS DISCOVER£1 Al-2255 HOURS ON. JANUARY 16 1974 WHILE CONDUCTING SURVEILLANCE OF TKE AUTOMATIC PRESSURE RELEASE, SYSTEM IN ADVANCE OF A SCHEDULED l'IAINTENANCE OUTAGE OF THE HIGH PRESSURE COOLENT INJECTION SYSTEM.
UNIT 3 IS~IN THE PROCESS OF BEING SHUT DOWN TO REPAIR SF-1201 (~)
THE IEFECTIVE VALVE W P WORDEN*
SUPT DRESDEN NUCLEAR POWER NNNN
. SF-1201 (RM9) a-:i-¢9
\\
- ~
i'.~
i *..