  • ..* _

8107140590 810712 PDR ADOCK 05000010 p

PDR e

assigned.. Reporting to him.are:

( 1)

Technical Staff' Supervisor, (2) Of'f'ice Supervisor, (3) Station Security Adminis-trator, (4) Quality Control* Supervisor~ and*

(5) Rad/Chem Supervisor..

  • 1*.5.1.4. 1 Technica1 Staff Super.visor The Technical Sta.ff Supervisor provides technical support for plant operations, refueling,.

maintenance, modifications and in-service inspection and eva1-

' uates process data ~d equipment

  • performance and adequacy of station_ procedures.

He makes recommendations and advises the Assistant Superintendent with respect to qual.ity assur-ance.

He has the responsibilities and authority as described in Section 6.0 of the Technica1 Specifications for implementation**

of* the* onsite review function.

He* is also responsibile :for the

f ol:lowing:* "
a. Witnessing* of *assi~ed testing f'or verifying comple*-

tion of' modifications. and equipment maintenance.

b. Verification. of incorj>ora.tion.
  • . of' approved engineering chang.es.

into station maintenance and opera ting procedures, *.

c.. Verificatiori of comple-tion*. of*

reported. corrective* action *.

1.5.t.4.2 Quality Control Supervisor 1*-26 The Station Quality Control Supervisor reports" to the Ad.min**'

istrative and Support Services.

Assistant Superintendent and is.

reaponsibl.e* for* the* quality control. activi.ties at the Station such as:. reviewing drawings, specifications*, Maintenance/Modi-*

fication Procedures and requests'

.r1r~1~~*

Commonwealth: Edlaon:

18

Control and approval of subcontractors quality assur-

. ance pr<>grams, procedures' and personnel qualification, are the*

responsibility of the specific contractor involved.

Such contractor actions are to be documented and will be subject to audit by CECo.

1.2* Evaluation of Vendors An evaluation of vendor capability will be required forASME Section III and safety-related items.

Where valid records of vendor capability and quality performance are not available to CECo, a survey of the supplier's facilities, capa-bilities and quality assurance system-will be m~de by CECo or its designated representative *. For i.tems* requiring* ASME Code*

conformance*,. vendors must be able to meet ASME. Code, requirements *..

The Project Engineerizlg and Station Nuclear Engineering Department Qua1ity Assurance Coordinator will be respo~ible for assuring that vendor or contractor Quality Assurance Program evaluations are.carried out.

The Purchasing Department will maintain the Approved Bidders* List !or contractors and suppliers of ASME and safety-related items~ Addition of vendors to the Approved Bidders* List shall on1y be* made upon approval by

  • Station Nuclear Engineering Manager and the Manager of Quality*

Assurance, or their designees,*as to meeting tecbni~al. and quality assurance requirements..

For vendors or contractors to be placed on the*_ Company Approved. Bidders.* List for-ASME or safe.ty-related.

items or work, a controlled copy of their Q\\ullity Assurance Program.

shall be assigned' toj the CECo, Manager' of Quality Assilrance**.

. Section 9.* *. 0 *of this. report,:. "Control of. Special.

Processes.,." es~blishes the* evaluation and assessment of certain process~ and inspection capabilities of' the vendor such. as, welding:,.

heat trea*tment, arid nondestruc.ti ve examination.

Past performance* of' a contractor/v.endor will be: conside*red.

during procurement activities~ by CECo*.

Prior to contract or*

  • purcha*se order award, the bidder* s capability and. q.uality per!or-* * * *.,
  • mance~ w111 be* reviewed rela,tive to the* product,. process*,. or service' being procured*. I.t records. are* inadequate.-, a, survey o.t the bidder* s facilities sprior to award may be required.

Surveys will *

  • * \\

include, as applicable, review of facilities, organization,

. 18 quality assurance.program.and experience, existing controls, knowledge* of. special *processes:, possession. of a* current ASME.

Certificate, of Authorization, and an understanding* of, and a*

willingness to. meet contractor or purchase order requirements.

1*. 3 Stirveillance* of.: Vendor* Operations Source; surveillance will.. be* 'carried out through. noti.fl-*

cation. points established as a condi.tion* of. procurement of* safety-related or ASME Section III items:.

  • Special consideration will be" given.tor surveillance* during,. manufactur~* when one of. the !ollowing*

is involved:

7._2 Rev *. 18 7 /12/81' commonwealth'.' Edisoni *

  • Specification,* etc., required to assure that the CECo purchased items meet Code requirements and to perform rece.ipt inspection.

Also, for material supplied by non-Certificate holders, the CECo su.rvey data covering such firms is made available to. site Code contractors.

When CECo performs receipt inspection of such purchases or *when CECo upgrades stock material for ASMl:: Code use, CECo provides these contract6rs with the applicable Certified Material Test Reports.and/or Data Reports plus the Material Receiving Report to provide verification that the purchased items supplied by CECo meet Code* requirements.

Documented evidence that material or equipment conforms to procurement requirements including, for Code* items, indication* of their compliance to the spe~ified quality program must be retained and available at the sit~ prior to use or installation~* P~rt.of this evidence shall be in the form of acceptable documentation such as Certified Material Test Reports, Pressure Test Reports;.' Certificates of Conformance,

.

  • etc.

Documentation requirements will be delineated in the *.

individual equipment specifications.

The ConStructio*n Materials Receiving Coordinator or designee will be responsible for assuring

  • that receiving inspection is completed where Project Construction or the Station Constru6tion Department is responsible for the work;

. receipt acceptance approval will be by Quall ty As.sutance or its de~;ignated agent.

Where ASME Section Ill components *and safety-related mate.rials and equipment are received by the Station Stores Supervisor, Station Quality Control will be responsible..for receiving inspection and the Quality* Ass.urance Engineer o*r Inspector for Maintenanc:e shall a:ssure through audit and surveil-lance that th~ receiving inspection is completa ~nd traceability is maintained.

ASME Code material transferred from Stores or another CEC6 Station shall meet the r~qu.!re~en~s specified f6r the deiig-nated install~tion. Nonconforming equipment will be coritrolled.

7.5 Supplier Audit Vendors of safety*-related and/or ASME.Section III items will be subjected to survey,. audit o*r surveillance of the*ir.quality assurance system by CECo, or its* agents, at intervals consistent with. the importance to safety,. complexity, and the quantity of the product or services being furnished in a~cord~nce with approved agenda and checklists furnished in accordance* with approved agenda

  • and checklists to assure that the necessary ~anufacttiring processes are being utilized and that quality controls are being maintained.
7. 6 Spare Parts and Replac*ements Spare parts and replacement items, equipment and compo-

. nents w,ill be purchased to or:ig*inal o.r better: *design req:uirements 18 in accordance with the_ controls herein.

The applicable~ quality assurance requirements-will be included in the procurement documents.

7-4 Rev *. 18 7/12/81 commonwealth' Edison,

Such spare parts and.replacements from vendors will require documentation by item, component, equ'ipment or part number for identification and traceability~ Documentation for material will be in accordance with procurement *order requirements.

\\fuen the procurement order for ASME Section III components and safety-related spare parts, material.* and. equipment includes a s.pecification or drawings, documentation will be received from the vendor which verifies conformance with those requirements.

In the case where the original part,* item, component or equipment was procured w.i th no-specifically identified quality assurance program requirements, identical spare parts_ and replacement items, components or equipment may be similarly procured from the original equipment manufacturer,*.but care shall be exercised to assu~e at least eqtiivalent performance; that. is, a joint technical engineering-quality assurance documented evaluation shall be* conducted to estab.lished requirements arid controls.

The evaluation shall assure that interfaces, interchangeability, safety, fit and function are not adversely affected or are* contrary

  • to applicable regulatory or code requirements.

In the use of procurements. of safety-related materials, parts* and items** that are a manuf acture*r 's standard* product (commercial grade item), such commercial grade items shall be inspected as part of the rece'ipt inspection function* to assure tha*t (1) damage was not susta*ined during shipment; (2) the* i teIIi received

.was the item ordered (i.e.,. its possesses the required attributes identical, as necessary; to the item specified; and (3) documentaeion, as applicable to the it~m, was received. and is acceptable plus, after be*ing, received, s.uch a commercial grade item shall be tested, where applicable to assure that it will perform its intended function (i.e., by* means of bench tes-ting and/or functional testing as required).

1.8..

A commercial grade item. is one that is not subject to design, specification, or testing requirements by the supplier that are unique to nuclear-pow et plants; is one that is used* in numerous; applications other than nuclear power plants; and it is one that can be ordered from the manufacturer/supplier on the basis of specifications set forth in the mariufacturer's published product description (i~e., catalog) or on the basis of its manufacture to national standards.

When *an item is purchased by specifying the manufacturer's catalog part number,. when documentation is required beyond that indicated in the catalog, and. when such documentation is no*t available* for items-w-ith the same* part n\\.1IIlbe*r obtained from the.

manufacturer, the item doe.s not meet the* definition of a commercial grade item and shall not be: treated as a commercial grade item.

7-5 Rev *. 18

. 7/12/,81-.dl' COmmonwealth"'C aont

The Station Stores Supervisor and Station Quality Control Supervisor are responsible for assuring that documentation for spare parts and equipment has been included as part"of the ship-ment.

The* documentation for the purchased material, equipment, and/or services., after being reviewed and accepted by the Quality/Control Supervisor will be retained at the Station.

When required documentation is lacking for safety-related and/or ASME Section III components or spare parts-, the Technical Staff Supervisor will verify that appropriate documentation is obtained or that suitable inspection and testing is performed to verify conformance to procurement* requirements and *that such items are trea*ted as nonconformances.

Receipt inspection of spare parts and equipment purchased to ASME.Section III and safety...,.related requirements shall be accepted by the Stat.ion Quality Assurance Engineer or Inspector for Maintenance.

7-6 Rev *. 18 7/12/81.

Commonwealth Edison*.


*------------