Forwards Addl Commitments to TMI Action Plan Items II.B.4, III.D.3.4,II.K.3.29 & II.F.2,per NRC 810701 Request
ML17252A718
Person / Time
Site: Dresden, Quad Cities, Zion  Constellation icon.png
Issue date: 07/02/1981
From: Delgeorge L
COMMONWEALTH EDISON CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.4, TASK-2.F.2, TASK-2.K.3.29, TASK-3.D.3.4, TASK-TM 2248N, NUDOCS 8107080411
Download: ML17252A718 (4)


Text

e*

e

e. * *
  • Commonwealth Edison B.
  • One First National Plaza,* Chicago, Illinois

. ~ Address Reply to: Post Office Box 767 Chicago; Illinois 60690

.. j u ly 2, l 9 8 1

  • Mr. DarrelY G. -Eisenhut,.Direct*or D.i v i s i o.n of L i c en s i n g..

U~S. Nuclear R~gul~tory C~m~issiO~

Washington, DC 20555

Subject:

. Dresden St~~ion Units 1, 2 and 3

  • .Quad* C~ties Station Units 1. and 2 Zion Stati6n Units 1 ana 2 A d d it i o n a 1 R e s.p on s e s
  • t o N U R E G 0 7 3 7 Items NRC Dockat N-0s *. 5b-10/~37/249, 50-254/265r and 50~295/304

~

References ( a) :

-D

  • L
  • Pe op 1 es letter to D
  • G. E i sen hut dated

( b) :

( c ) :

Junel2, *1980 Corde 1 l Reed 1 et t er to D ~ G..

  • E i sen h.u t dated July 25, )980.

J. S

  • Abe l 1 et t er to D
  • G. -E i sen hut. dated December 15,: 1980 J. S.* Ab~l letter to D. G. Eisenhut dated*

Dec ember 31, 1980 (e):. Cordell* Reed letter to D. G. Eisenhut dated January 23, 1981 (f):

J. S. Abel letter to D. *G. Eisenhut dated Apr i 1 1,. 1 9 8 l **

Dear *Mr. Eiien~ut:

In response to a* telephone re~uest by Mr~ T. A; Ippolito on Ju*ly *1, 1981, the enclosure to this letter provides additional

.commitments for NUREG 0737 Items II.B.4, III.-D.3.4, ILK.3.29 and II.F.2.

Ple.ase address any questioijs you maj h~ve regarding~this matter to this office.*

I 8107080411. 810702.

PDR ADOCK 05000010 P

PDR

    • e* On~ (1) si~n~d original and

~eventy-nine (79) copies of

.*this transmittal are provided for your u~e~

. Very truly yours,~-

..*. /'d0V~---~;~--C.

,::::?'

    • L. 0. DelGeorge Director of Nuclear.Licens*ing Enclosure cc:

Messrs. T. A.. Ippolito

.J~* G. Keppler*

RIII Inspecto~ -

D~esden

  • Rill Inspecto~

Q~~d Cit~es Rill rn*spector Zion 2 248N.

ENC LOSU'R E Co~mon~ea1th Edison Companx Additional Responses to NUREG 0737 Ite~s Reguested *bx T. A. Ippolito on Julx 11 1981 I I

  • B. 4 T r a i n i n *g f o r M it i g a t i n g C o r e D am a g e..

Dresden, Quad Cities.and Zion *Response.

See

  • pr i or. responses i n
  • References (c ), * ( d ) and ( f )
  • CE Co will commit to initiating oper~~or lraining wit~in ~O days.

Dresden and Zion Stations have already initiated the training of their*

operat~rs.

Qua~ Cities Station is ~theduled to in it fate the training: of their operators on or before July 27, 1981.

As stated in Referente (f)~ we will mak.e every. effort to complete the training of operators. in these topics via the license requalification program

  • b y 0 c t o b e r. 1,
  • 1 9 8 1
  • III.D.3.4 Control-Room Ha.bita'bility Reguirements Dresden, Qu~d Cities and Zicin ResQo~s~

S e e p r. i o r r e s p o n s e s i n. R e f e r e n c e s. ( a ),. *. (.b ). a n d (. e.)

  • C E C o wi 11 commi.t to provide withfo 60 days {by September 1;.1981), a
    • re p o rt of t h e o n g o in g e v a 1 u a t i o ri of' : t h e ad e q u a c y o f
  • o u r
  • co n t r o 1 r o om
  • des i g n *s. *:

I t i s our u*n.de rs tan d i n g t h*a t

  • th i s report s h. o u 1 d b. e w r i t ten **

in sufficient detai 1 for the NRC to assess the adequacy of our

_ rev few pro g r am, w h i c h

  • w i 1 1
  • be c om p 1 et e d by J ~ n u.a r y
  • 1, _ 1 9 8 2.

II.K.3.29-Studx to Demonstrate Performance.of Isolation Condensers with Noncondensibles Dresden Response See prior responses in References (a), _(b), (t) and. (f).

CECo. will commit to provide within 60 days (September 1, 1981) the.

  • results of an evaluation performed to resolve th.is issue.

This evaluation will document the fact that the isolation condenser at Dresden plays no req~ired.role in the plant r~sponse to ~mall break L 0 C A '* s a ri d t h e a c c i. d e n 't a n a 1 y s e s f o r s m a 1 1 b r e a k L 0 C A ' s d. () n o t t a k e.

t~edit for thi~ system.

II.F.2 In~trumentation for Det~ction of Inade§uate Core Coolin~ (rec)_

  • ~

Zion Response See prior responses iri -Referentes (c) and (f).

CECo. will*

commit t6 provide within 30 days the ~~sign information that we

a

  • 2 -

bel.ieve to b~ o~tstaodin~.

However~ procedures feq~i~ing a

  • Pre~imple~~nt~tibn revi~w ~~e being.dey~lo~ed by the Westinghouse Owners Group.. This ongoi~g ~ork.associated with g~idelines and.
  • procedures for the use of instrumentation during and.. following ICC was: documente.d to 'the NRC by t.he. w*estinghouse*.- Owners Group Letter
  1. OG-44 da.ted November 10, 1980 as -stated in Reference (f).

2248N