ML17252A671
| ML17252A671 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Quad Cities, Zion, LaSalle |
| Issue date: | 06/01/1981 |
| From: | Abel J COMMONWEALTH EDISON CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0696, RTR-NUREG-0737, RTR-NUREG-696, RTR-NUREG-737, TASK-3.A.1.2, TASK-TM NUDOCS 8106050304 | |
| Download: ML17252A671 (2) | |
Text
..
~-...
Commor&1th Edison One First NJ.l!!lifa"I Plaza. Chicago. Illinois Address-Repiy!o: Posi-ditice Box 767 Chicago. Illinois 60690 June l, 1981 Mr. Darrell G. Eisenhut D i r e c t o r., D i v i s i o r, o f L i c e n s i n g Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Dre~aen Station Units l, 2 ctnd 3 Quad Cities Station Units I and %
Zion Station Units l and 2 LaSalle County Station Units l and 2 June l, 1981 Response to NUREG 0737 Item II I.A. l.2 Concerning Emergency Response Facilities NRC Docket Nos. 50-10/237/249, 50-2S4/265, 50-295/304 and 50-373/374 References (a):
D. G. Eisenhut letter to Al I Licensees dated February 18, 1981.
( b) :
J. S.
- Abe I l e*t t er to D. G. E i sen hut dated April 10, 1981 (45 dcty response to Reference
( a ) ).
Dear Mr. Eisenhut:
Th i s l e t t er, w i th a t t a c ti nr e rt t s,
i s i n response to the requirement set forth in Reference (a) to provide by June l, 1981, a c on c e p t u a l
<J e s i g n o f t h e E rrr e r g e rr c y R e s po n s e F il c i l i t i e s a t Commonwe~lth Edison Nuclear Statiorrs.
The attachments to this letter aescribe the conceptual or actual designs for o~r Emergency Response Facilities.
NUREG 0696 has been used as a guide in design of these facilities.
The facilities described herein are applicable to Dresden U n i t s 2 and 3, Q 1... ad C i t i e s Uri i t s l an d 2, L i o rr U r1 i t s I and 2 a rr d LaSalle County ~nit l.
LaSalle County Unit 2 and 8yron and Braidwooa-info... mation will be supplied as appropriate in connection with the review process for those units.
Sch e du le s for imp le me rr tat ion of t11 e ER F ' s t or these u n it s were prov i de d i n Ref ere n c e * ( b ).
A Li (J i t i on a l i ri f or nr il t i on i s µ r o v i de d in these attachments with respect to those schedules.
It shoult.l be noted that Co111monwe<lltl1 Edisor1 is currently reviewinl.:J the i.nstrur11er1Lation para111eter sets uescribed in Regulatory Guide 1.97 (RG l.97 is incorporated intu NUREG OG9u by retereni:e). 0
/
we i n ten a t o prov i de au d i t i on a l i n t o. r in at i o n t o I I ow i n y rec e i pt of Pc 'd-further guidance (as discussed in Reference (a)) on NUREG 0696
..S implementation.
- /Vo.
'~<":*,.
-~-
Please adaress any questions you 111ay have cuncerni11g this matter tu this off ice.
One (1) signed original and riinety-nine copies of this submittal are provided for your use.
Very truly yuurs, J~JR~A
.k J.S. Abel 7)-' Director.of cc:
RIII Inspectcr, Dresden RIII Inspector, Quad Cities
.RIII Inspector, Zion Rill Inspector, LaSalle Attachments 0195a Nuclear Lice11siny