MONTHYEARML24291A0272024-10-31031 October 2024 NRC Letter to C. Mayer Illinois SHPO Request to Initiate Section 106 Consultation for Subsequent License Renewal of Units 2 and 3 RS-24-103, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-10-21021 October 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-102, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-5912024-10-21021 October 2024 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-591 RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24225A2132024-09-26026 September 2024 Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval ML24253A0942024-09-23023 September 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID L-2024-Sle-0002) (Docket Numbers: 50-237 and 50-249) ML24270A0332024-09-20020 September 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 24-0030, ISFSI Annual Effluent Release Report2024-09-20020 September 2024 ISFSI Annual Effluent Release Report IR 05000237/20244022024-09-19019 September 2024 – Security Baseline Inspection Report 05000237/2024402 and 05000249/2024402 - (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000237/20230052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Dresden Nuclear Power Station, Units 2 and 3 (Report 05000237/2023005; 05000249/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000237/20240022024-08-14014 August 2024 Integrated Inspection Report 05000237/2024002 and 05000249/2024002 ML24215A2912024-08-14014 August 2024 Request for Withholding Information from Public Disclosure Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations IR 05000237/20240102024-08-0909 August 2024 NRC Age-Related Degradation Inspection Report 05000237/2024010 and 05000249/2024010 ML24157A0792024-08-0808 August 2024 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID L-2024-Sle-0002) (Docket Numbers: 50-237, and 50-249) IR 05000237/20230112024-08-0707 August 2024 Reissue - Dresden Nuclear Power Station, Units 2 and 3 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 IR 05000237/20200012024-08-0606 August 2024 Reissue - Dresden Nuclear Power Station, Units 2 and 3 - Integrated Inspection Report 05000237/2020001 and 05000249/2020001 ML24184A1712024-08-0202 August 2024 SLRA Schedule Letter RS-24-073, Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information2024-07-31031 July 2024 Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information ML24136A1322024-07-30030 July 2024 Transmittal Letter for Renewed License ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24193A0882024-07-24024 July 2024 Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Unit 1 Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations (Docket 50-10) ML24204A1862024-07-24024 July 2024 – Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2; TSTF-591, Revision 0; and 10 CFR 50.69 IR 05000237/20243012024-06-27027 June 2024 NRC Initial License Examination Report 05000237/2024301; 05000249/2024301 ML24138A0572024-06-26026 June 2024 – Issuance of Amendment Nos. 285 and 278 Application to Adopt TSTF-564, Safety Limit MCPR ML24138A1812024-06-18018 June 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review ML24128A2742024-06-14014 June 2024 Notice of Acceptance and Opportunity for Hearing - Letter RS-24-063, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-06-14014 June 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24156A2332024-06-11011 June 2024 Letter Supplemental Information for Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24183A2752024-05-30030 May 2024 Registration of Use of Casks to Store Spent Fuel SVPLTR 24-0020, Registration of Use of Casks to Store Spent Fuel2024-05-30030 May 2024 Registration of Use of Casks to Store Spent Fuel RS-24-056, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2024-05-28028 May 2024 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24145A0432024-05-23023 May 2024 Registration of Use of Casks to Store Spent Fuel 10 CFR 72.212 SVPLTR 24-0019, Registration of Use of Casks to Store Spent Fuel2024-05-23023 May 2024 Registration of Use of Casks to Store Spent Fuel ML24158A0012024-05-22022 May 2024 License Amendment Request to Adopt TSTF-564 (EPID L-2023-LLA-0120) Illinois State Concurrence ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24135A0722024-05-10010 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report ML24129A1352024-05-0808 May 2024 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-59 ML24134A1132024-05-0808 May 2024 Retraction: LER 2303-001-00 for Dresden Nuclear Power Station, Unit 2, HPCI Inoperable Due to Air Void Accumulation ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) 2024-09-06
[Table view] |
Text
.. 1'
.~
e CommonwAh Edison Dresden Nucle~ower Station l).R. #1 Morris, Illinois 60450 Telephone 815/942-2920 1
BBS Ltr. #76-287 April 6,
- Mr. James G. Keppler, Regional Director Directorate of Regulatory Operations - Region III U.S. Nuclear Regulatory Connnission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Enclosed_please find Reportable Occurrence number 50-249/1976-6. This report is being submitted to your office in accordance with the Dresden Nuclear Power BBS:aw
cc: Director Director Management Informatio~ Program Control
. File/NRC
- ...1_**
e LICENSEE EVENT REPORT e co.NTRDL,. BLOCK: I I I I I I I [PLEASE PRINT ALL REQUIRED INFORMATION]
1 6
'* LICENSEE LICENSE EVENT NAME LICENSE NUMBER TYPE TYPE
@E] IX IL.I DI RI$' 13 I 10101-10101010101-1010 I I.ff I / I t I I I ! I 10121 7 8 9 1A 15 25 26 30 31 32 REPORT REPORT CATEGORY . TYPE. SOURCE OOCKET NUMBER EVENT OATE . .. REPORT DATE
@E]coN'T I
- I I lhJ U::J 101s101~1012141q1 10 13. I;{_ 14-171"74I lbl4101~171~1 7 8 57 58 5!:! 60 61 68 69 75 80 EVENT DESCRIPTION (filg] I l>V&! J\)(t... SuRVt:I L-L.A.NC OE Tw~- UN 1T- ..:L cc.sw Fwoo Pi2D1E"cT10JJ Vr-\UL-r, og.tl r N I 7 8 9 80 10131 IVAW1£ d.-yggq -Jlf wlls [OuND BLOCf:t:O OPE.JJ mEc..J.iiO.N 1c.ALLY AND Lcc.-ne.1cl'lt.-LY I 7 8 9 80 lol41 I 1rJOPERA6LE". F°Ot.Lo WI NG- \Ht 0 l~C.C>vCR..Y OAJ UN' (- :2.,. 7 Tl+"S" '19 q? - ]Lf ynLvE OA.;!
7 8 9 . . . . 80 lol5l lutJ1-r-3 WA~ IN~ Pcc...-riso IJ. rJ a FOUND -ro r3<:::. { tJ n ~I l'Y/1LARJJN07>7=e..A81..0 CONDJ(IDNJ 7 8 9 > 80 lol6I I Tl-le: Vfl.LVS OJV 8D7H UNITS WcR.£ PL1lc£D mANufl\W...Y IN //-t C.UJsED Pos1noAJ I 7 8 9 PRIME (sec A-rlAGH~ S>+&sl) 80 SYSTEM CAUSE COMPONENT COMPONENT CODE CODE COMPONENT CODE SUPPLIER MANUFACTURER VIOLATION
@0 IWIBI 7 8 9 10 L1J 11 12 IVIAILIVIOl.PI 17 LbJ 43 IA 44 1~11 101 47 w48 CAUSE DESCRIPTION
@@I-nu;:: ccsw VAULT QR.fl.lNVALVf°"<; lAJE£E PART of jl\ V'YlDDIFCC-A~LOtJ (rJ1-ru*rrE-O 1J1JI 7 8 9 80 lol91 7
I 8 9*
14'(7,ld-_ AfVD comPt..ET£D, w1TH REV1~10N5;. OUR/NG- Tl-l'f: t'i 75: ReF'u£t..INC- ovrnG-f'S.
) J . .
I 80 .
IT@ l+uNc.**noivAL /<;;,111\JG-- ~6Qv1Rel'YIGN1'3; w~ Nor 10EtJr1FtED JN Ti+C moo11=1cA'T10A.J I 7 8 9 FACILITY METHOD OF (Sf:E AtrflC.~ SN£!) . BO STATUS % POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION EE] lg_] 1017121 N8 l£J Nft I 7 8 9 10 12 13 44 45 46 BO FORM OF /
ACTIVITY CONTENT '*
RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE
[!El .tzj ~ .._I_ _ N_fl._ _ ____, Nit 7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION
~ 1010101 @ NI+
7 8 9 11 12 13 80 PERS"ONNEL INJURIES EE) lololOI NUMBER - DESCRIPTION
..___N_A_____________________________________________.
7 8 9. 11 12 80 OFFSITE CONSEQUENCES
~ 80 7 8 9 LOSS OR DAMAGE TD FACILITY
. TYPE DESCRIPTION
-7El~la 9m Ii 10~----~'-'----------------~--~----------~~--------~--------~----------~a==o PUBLICITY E1?J NA 7 89 80 ADDITIONAL FACTORS
~ A 7 8 9 80 PHONE: CK(, .1.:t2
./--
EVENT DESCRfP-1'*ION -(continued) on the. date of the discovery-. The Unit..,-2 valve will be fully operational prior .to tinit start-up. The Unit-3 valve was made *operational on April 5, 1976~ and the Tech Spec su.rveillance was performed for verification.
(50-249/1976-6)
CAUSE DESCRIPTION (continued) approval; consequently,. the valves were not functionally tested upon
¢ompletion of the* ..modifications. Unqer current procedures, modification approvals are mo.re closely reviewed for inclusion of appropriate. post-modification te~ting requirements.
'."