ML17252A029

From kanterella
Jump to navigation Jump to search
Notice of Forthcoming Meeting with Nebraska Public Power District, Commonwealth Edison Co., and Energy Inc., Air Containment Atmosphere Dilution Hydrogen Control System for Cooper, Dresden, Units 2 and 3, and Quad Cities, Units 1 and 2
ML17252A029
Person / Time
Site: Dresden, Cooper, Quad Cities  Constellation icon.png
Issue date: 04/12/1976
From: Fletcher M
Office of Nuclear Reactor Regulation
To:
References
Download: ML17252A029 (4)


Text

Docket Nos. 50-298, 50-237,

~

50-254,

~*

OFFICE~

SURNAME~

DATEi!>-

Dennis L. Ziemann, Chief, Operating Reactors Branch #2, DOR FORTiiCOMING ?-~EETING WITII NE!3RASK.\\ PUBLIC POWER DISTRICT.

cm~*-10~H'!EALTH

. EDISON crn-!PANY, gm ENETHW n:cORPORATED -

AIR CONTAirn-!ENT ATI-!OSPHF:RE DI LUTTON (!\\CAD) !lYDROGf:N CONTROL SYSTIM F-OR COOPER NUCLEAR STATIOtJ, DRESDEN UNITS 2/3, AND QTJAD CITIES 1/2 Date and Time:

Thm*sday, April 22, 1976 9:00 a.m.

Location:

Maryland National Banl~ 8ui.lding, Room 6110

Purpose:

To discuss design and operation of (1) Contai.nment Atr.iosphere

~lanitori.ng System, (2) Containr.ient Atmosphere Dilution System, and (3) Contai.nmcnt Prcssur~ 131.eed Subsystem

Participants:

Nehraska Publ i.c Power District

Enclosure:

Agenda J. Pilant, et.al Com.rn<mweal th Edison Co-::ipany G. Abrell, et a1*

NRr.

C.

Gri~es,.J. !-'.night, f.f. Fletcher,. R. Snaider lo/

Michael ll. Fletcher, Project ~fanager Operating ~eacti!:lrs Branch it2 Division of Operating Reactors OR:ORB #2 0R:DRB:#2

                        • ,,,. n:~,..... rO"****........... :j *....... _::::r-:***F:***** ********************************************* ******************************************** * ************* ********************

.... ~.rn.tt1~~-=..... ****-~-~-~~-~~~-~i:~--~................................................................................................................ ~....................... ***********************************-

4 /, *i 176 4/ /">-/76 Form AEC-318 (Rev. 9*S3) AECM 0240

  • U. S: GOVERNME'NT:PRINTINQ OFFICES 1974-&ZO-USS

MEETING NOTICE DISTRIBUTION Docket # 'i 50-298, 50-237, 50.:.249, 50-254, 50*265.

NRC PDR 50-298, 50-237, 50-249, 50-254, 50-265 Local PDR 5-0-298, 50-237,*50-254 ORB #2 Reading NRR Reading B. i{usche E. G. Case V. Stello D. Eisenhut K. R. Goller R. A. Purple G. E. Lear R. w. Reid T. J. Carter L. C. Shao R. L. Baer A. Schwencer B. K. Grimes Project Manager - M. Fletcher Attorney, OELD OI&E (3)

OSD (3)

B. Falkenberry, I&E B.. M. Diggs Receptionist, Bethesda OPA R. Fraley, ACRS (16)

Principal Staff

Participants:

G. Lainas T. Ippolito E. Adensam R. Silver P. W. O'Connor

. R. Snaider.

I UNITED STATES CLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20666 Apri 1 12, 19 76 Docket Nos. 50-298, 50-237, 50-249, 50-254, 50-265 Dennis L. Ziemann, Chief, Operating Reactors Branch #2, POR FORTI-ICOMiNG MEETING WITI-1 NEBRASKA PUBLIC POWER DISTRICT, COMMONWEALTH.

EDISON COMPANY, AND ENERGY.INCORPORATED - AIR CONTAINMENT ATMOSPHERE DILUTION (ACAD) HYDROGEN CONTROL SYSTEM FOR COOPER NUCLEAR STATION; DRESDEN UNITS 2/3, AND QUAD CITIES 1/2 Date.and Time:

Thursday, April 22, 1976

. 9 : 00 a. m; Location:

Maryland National Bank Building, Room 6110

Purpose:

To discuss design and operation of (1) Containment Atmosphere Monitoring System, (2) Containment Atmosphere Dilution.

System, and (3) Containment Pressure Bleed Subsystem

Participants:

Nebraska Public Power District Enciosure:

Agenda J. Pilant, et al

  • Commonwealth Edison Company G. Abrell, et al NRC C. Grimes, J. Knight, M. Fletcher, R. Snaider

/JJuki'/1.1~

Michael H. Ff~tcher, Project Manager Operating Reactors Branch #2 Division of Operating Reactors

I*

MEETING AGENDA ACAD/CAM HYDROGEN CONTROL SYSTEM I.

Containment Atmosphere Monitoring System principl~s of operation

- physical location of components initiating signals.

II.

Containment Air Dilution System

- sizing analysis *for* maximum flow rate

- fan performance evaluation

- control of inlet flow valve

- single.failure analysis

- system operation III.

Pressure Bleed Subsystem

- vent fan sizing analysis

. - exhau.st flow path

- calculated periods of vent release

- operation of vent outlet flow control and automatic shutoff valves

- backup purge capability IV.

Analysis

- modeling of vent*s and vacuum breakers

- *makeup and purge flow fractions

-* decay heat assumption