AC'(!ELERATED DISIBUTION DEMONSTRlk'ION SYSTEM

/

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8805200097 DOC.DATE: 88/04/30 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION

'CNAMARA,A.E.

Rochester Gas 6 Electric Corp.

SNOW,B.A.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Apr 1988.W/880512 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR NCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

R I

05000244 ~

RECIPIENT ID CODE/NAME PDl-3 LA STAHLE,C INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB ll

~g@S B12 01 EXTERNAL: EG&G WILLIAMS,S NRC PDR COPIES LTTR ENCL 1

0 1

0 1

1 2

2 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DLPQ/PEB ll NRR/DREP/RPB 10 NUDOCS-ABSTRACT RGN1 LPDR NSIC COPIES LTTR ENCL 5

5 1

1 1

1 1

1 1

1 1

1 1

1 1

1 A

R TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 20 I

~;

$ I

OPERATING DATA REPORT DOCKET NO.

DATE Ma 12 1988 COMPLETED BY Andrew E. McNamara

= OPERATING STATUS 1520 470 I ~ Unit Name:

R.E. 6INNA NUCLEAR POWER PLANT

2. Reporting Period:

ril 1

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWc):
6. Maximum Dependable Capacity (Gross MWc):

TELFPHONE 3

Ginna Station Notes The unit was maintained at 100K reactor power level for the majority of the report period with one exception, detailed on page 3 and 4.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWc):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative 719*

2 903.00 1 885.2 719 4

15 829 059 7

3 366 504 2

7 62.71%

57 57K 1

2 57.57K 103.29 11.20K OX ypc, Date and Duration of Each):

11. Hours In Reporting Period
12. Number of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Linc
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (bIWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated

{MWH)

19. Unit Scrvicc Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor {Using MDC Net)
22. Unit Capacity Factor (Using.DER Nct)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months {T 161 543.00 125 903.67 1 687.55**

173 378 748 56 911 644 76.45K 76.45K 72.56K 72.56K 6.58K

25. If Shut Down At End Of Report. Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIAL.CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

  • Rnnrs rn Standard Time to Eastern Daylight Savings Time 8805200097 880430

'~

I g January 1,

1975 PDR ADOCK 05000204 R

DCD Forecast Achieved Afv. 44$

49 es

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE Ma 12 1988 COMPLETED BY Andrew E.

McNamara TELEPHONE 1

315 524-4446 Ext.

301 at Ginna MONTH A ril 1988 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2 ~

3 ~

4 ~

5.

6 ~

7 ~

8.

9.

10

'2.

13

'4

~

15

'6

'89 491 471*

492 493 491 492 488 490 490 490 491 491 492 492 492 17

'8.

19

'0

'21

~

22

'3

'4

'5.

26 ~

27

'8.

29

'0

'1

~

492 491 492 491 491 491 491 491 4

1 491 490 492 491 326**

  • Eastern Standard Time to Eastern Daylight Savings Time
    • lA2 Condenser - 2 Tube Leaks INSTRUCTIONS I

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH APRIL 1988

'I I)O(:KI'.1 NO.

SO 244 VNI'I'NAMI:R.E. GINNA NUCLEAR POWER PLANT-l)A1'I:.

Ha 12 1988

(:OMPLI'.1'I'.I) IIY Andrev E. McNamara I'I:LIIPHON I:

-444 x-301 Ginna Station Ho.

Date 0

III 0n-CIt 00 lO0D 0I e0 E 0 0cn C

0 Cl Licensee Event Report N

Em 0

D Vl 00 IA cD Ir$

00 0

E 0

O Cause gI Corrective Action to Prevent Recurrence 88-1 4-30-. 88 S

23 HF HTEXCH

'oad reduction Tube leaks in lA2 condenser plugged 2 tubes.

Addition al details on page 4.

I F:

Forced S:

Scheduled ACV. 4494949 Reason:

A-Equipmcnt Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Ocher (Explain)

Method:

I-Manual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain) 4 Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (I,ER) File (NVREG-0161)

Exhibit I - Same Source

NARRATZVE

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE Ma 2

1988 COMPLETED BY Andrew E.

M Namara TELEPHONE 1

315 524<<4446 EXT. 301 at Ginna MONTH A ril 1988 The reactor power level was maintained at 100% for the majority of the report period, with one exception:

On 4/30 the power level was reduced to 45% to isolate the 1A2 condenser to repair two tube leaks.

The power level was restored to 1004 by the end of the day.

GINNA STATION MAINTENANCE REPORT

SUMMARY

APRIL, 1988 During the month of April, routine maintenance and inspections were completed.

Ma)or safety related work included:

a ~

b.

c ~

d.

e.

go MOVATS Testing on MOV-9704A, MOV-9704B, MOV-3504A, MOV-

3505A, MOV-4000B, MOV-4027, and MOV-9703A.

Snubber Inspection Per M-40 Control Room Toxic Gas Monitor Replace Pump Tech.

Support Diesel PT-12.5 Surveillance Sec.

Diesel PT-12.3 Surveillance "C>> Charging Pump Repack Boric Acid Filters - Replace

~ '

r

~

'l 0

4

~

~j ROCHESTER GAS AND ELECTRIC CORPORATION

~ e9 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 LO

~ *K4 iOCC "< 5 0'2 GINNA STATION May 12, 1988 Director, Office of Management Information and Program Analysis U.S.

NUCLEAR REGULATORY COMMISSION Washington, DC 20555

Subject:

Monthly Report for April, 1988 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of April, 1988.

Very truly yours, Bruce A. Snow Superintendent Nuclear Production BAS/eeh Attachments cc:

Mr. William T. Russell NRC (1)