REGULA'1 INFORMATION DISTR IBUTIO YSTEM (RIDS) r ACCESSION 'BR: 8802290130 DOC. DATE: 88/02/22 NOTARIZED:
NO DOCKET 0 FACIL: 50-244 Robert Emmet Ginna Nuclear Plant.
Unit ii Rochester G
05000244 AUTH. NAME AUTHOR AFFILIATION SNOW> B. A.
Rochester Gas
- 5. Electric Corp.
RECIP. NAME RECIPIENT AFFILIATION STAHLEi C.
Office of hfuc) ear Reactor Regulationi Director (Post 870411
SUBJECT:
Advises that Rev 13 of subJect document submitted for regulatory review on 871223. Review identified need for further clarification of changes submitted on pages 5 0 53.
Revised pages 5 5 53 encl.
DISTRIBUTION CODE:
8004D COPIES RECEIVED: LTR g ENCL g SIZE:~~X TITLE:
GA Topical Reporti Amendmenti or Correspondence (Docket/Utility Speci NOTES: License Exp date in accordance with 10CFR2
- 2. 109(9/19/72>.
05000244 RECIPIENT ID CODE/NAME PD1-3 LA INTERNAL: ARM/DAF MB REG FI E
01 EXTERNAL: DMB/DSS NRC PDR COPIES LTTR ENCL 1
1 1
2 2
1 1
1 1
RECIPIENT ID CODE/NAME STAHLE. C NRR/DLPG/GAB RGN1 FILE LPDR COPIES LTTR ENCL 1
2 2
1 1
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL 11
% ~
l' E
I I
t 4, E
S "7
A L
r
I/IIIIIIIII~'IIIIIiIIII l u7i //i,iran(ze I//I
/////////8 LLIE0
~i ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 7ELEPHONE AREA CODE VIE 546.2700 February 22, 1988 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Mr. Carl Stahle PWR Project Director No.
1 Washington, D.C.
20555
SUBJECT:
Submittal of Quality Assurance Program R.E.
Ginna Nuclear Power Plant Docket Number 50-244
Dear Mr. Stahle:
Revision 13 of subject document was submitted for regulatory review on December 23, 1987.
The review identified need for further clarification of the changes submitted on pages 5 and 53.
The Superintendent, Nuclear Production has been reinserted on page 5 as sharing responsibility with the Superintendent Ginna Station for the proper implementation of the quality assurance program requirements at Ginna Station.
The Ginna Station Organization on page 53 has been revised to indicate the Control Room Foreman position to be the second SRO on shift required when the RCS Average Temperature is greater than 200 F.
The corrected
- pages, enclosed herein, are to be inserted into the revision 13 submittal.
Very truly yours, Bruce A.
Snow Superintendent, Nuclear Production BAS:cern Enclosure xc:
C. Marschall, Senior Resident Inspector USNRC Region 1
880m~~ ~