ML17251A917

From kanterella
Jump to navigation Jump to search
Forwards Implementation Rept Re Reactor Vessel Level Monitoring Sys.Util Completed Installation During Spring 86 Outage,Per NUREG-0737,Item II.F.2
ML17251A917
Person / Time
Site: Ginna 
Issue date: 12/22/1986
From: Kober R
ROCHESTER GAS & ELECTRIC CORP.
To: Lear G
Office of Nuclear Reactor Regulation
Shared Package
ML17251A918 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.2, TASK-TM NUDOCS 8612300261
Download: ML17251A917 (4)


Text

REGULATORY I RUAT ION DISTR IBUTION 'SYS t i

( R IDS )

ACCESSION NBR: 8612300261 DOC. DATE: 86/12/22 NOTARIZED:

NO DOCKET 0 FACIL:50-244 Robert Emmet Qinna Nuclear Plant>

Unit 1> Rochester G

05000244 AUTH. NANE AUTHOR AFFILIATION KOBER> R. W.

Rochester Qas 5 Electric Corp.

REC IP. NANE RECIPIENT AFFILIATION LEAR> Q. E.

PWR Prospect Directorate 1

SUBJECT:

Forwards implementation rept re reactor vessel level monitoring sgs. Util completed installation during Spring 86 out ag e.

h DISTRIBUTION CODE:

AOOID COPIES RECEIVED: LTR 1

ENCL g SIZE: / + +0 TITLE:

OR Submittal:

General Distribution NOTES: License Exp date in accordance with 10CFR2> 2. 109(9/19/72).

05000244 RECIPIENT ID CODE/NANE PWR-A EB PWR-A FOB PWR-A PD1 PD 01 PWR-A PSB COPIES LTTR ENCL 1

5 5

1 1

RECIP IENT ID CODE/MANE PWR-A EICSB PWR-A PD1 LA DIIANNI>D PWR-A RSB COPIES LTTR ENCL 2

2 0

1 1

'. INTERNAL: ADN/LFNB RR SCB 04 0

1 1

ELD/HDS4 NRR/GRAS RGN1 0

0 1

1 EXTERNAL:

EQLM BRUSKE> S NRC PDR 02 1

1 1

LPDR NSIC 03 05 1

1 1

TOTAL NUNBER OF COPIES REQUIRED:

LTTR 23 ENCL 19

h

~ iI'I~

,f ling

'i t

tQ I I ~It, )

i I

'll

, I I tl t

r I I I ~

'I

',< )tf'V h,t I h '..

I " '><hl h

II Ilt tl I,

~ I<

Hl r 'a.h hl i "

g h rrh >S.'

) l. ht'i r*"

) ")

~fg )

r Q f I If h

h Fed

>, 'I,...

<Ih.)

P r 0

h I

f~p j: yK p'll/,',y

~',

t

~ 'I II II ll'f tt I

II I r"

'hij )

h htril.

)I I '<

a 3

IL I'I li tt ~

w P,'" )w I

h-.I 'I Ii lt I A

'l

't-4

,'" w ll rl q

h trh,'

I I hrtt

Hcv j

Nil/Zl/1 I iliIII ILIAOAI~

Z(iz Ii iiiiiiiiiiI 8F'::::

~,

r ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 ROGER W. KOBER VICE PRESIDENT ELECTRIC & STEAM PRODUCTION TCLCPHONC

  • Rc* cooc TIs 546-2700 December 22, 1986 Director of Nuclear Reactor Regulation Attention:

Mr. George E. Lear, Chief PWR Project Directorate No.

1 U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Implementation Report - Reactor Vessel Level Indicatioq System R.E. Ginna Nuclear Power. Plant Docket. No. 50-244

Reference:

RG&E/NRC letter from R.W. Kober'to W.A. Paulson "Inadequate Core Cooling Instrumentation, NUREG-0737, Item II.F.2" dated August 7, 1984.

Dear Mr. Lear:

Our letter dated August. 7, 1984 (Referenced letter) provided information requested by the Staff regarding Inadequate Core Cooling Instrumentation.

That letter committed to providing the Staff with an implementation report 9 months after the Reactor Vessel Level Indication System (RVLIS) was installed.

RG&E completed installation during the Spring 86 outage.

Since that time we have completed functional testing and calibration. In the referenced letter, we stated our intent to implement modified procedures in March of 1987.

However, because this coinsides with the 1987 planned outage which will impact the training schedule we will implement modified procedures six weeks after the outage.

Attached is an implementation report which describes the RVLIS which has'een installed at Ginna.

V truly yours, AJ R

er W. Kober Attachment pal

L I