ML17251A883

From kanterella
Jump to navigation Jump to search
Discusses Inconsistencies in SER Forwarded on 861216 Re Application to Store Consolidated Spent Fuel & to Expand Spent Fuel Pool.Inconsistencies Re Use of Fuel W/Burnable Poisons & Auxiliary Bldg Crane Should Be Clarified
ML17251A883
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/02/1986
From: Kober R
ROCHESTER GAS & ELECTRIC CORP.
To: Lear G
Office of Nuclear Reactor Regulation
References
NUDOCS 8612090491
Download: ML17251A883 (6)


Text

REQULATORV I RVATION DISTRIBUTION SVS

<RIDS>

ACCESSlOQ NBR: 8612090491 DOC. DATE: 86/12/02 NOTARIZED:

NO FACIL: 50-Z44 Robert Emmet Qinna Nuclear Plant> Unit 1> Rochester G

AUTH. NAI'IE AUTHOR AFFILIATION KOBER> R. W.

Rochester Qas Zc Electric Corp.

REC IP. NANE RECIPIENT AFFILIATION LEAR. G. E.

PWR Prospect Directorate 1

SUBJECT:

Discusses inconsistencies in GER fortoarded on 8612ib re application to store consolidated spent fuel 8r to expand spent fuel pool. Inconsistencies re use of fuel i'/burnable poisons Sr auxiliary bldg crane should be clarified.

DISTRIBUTION CODE:

AOOID COPIEE RECEIVED: LTR I

ENCL Q EIIE:

TITLE:

OR Submittal:

General Distribution NOTES: License Exp date in accordance uith 10CFR2> 2. 109(9'/19/72).

DOCKET 05000244 05000244 REC IP IENT ID CODE/NAI'IE PWR-A EB PWR-A FOB PWR-A PD1 PD 01 PWR-A PSB INTERNAL: ADI'I/LFNB NRR/

SCB RE L

04 COPIES

'TTR ENCL RECIPIENT ID CODE/NAI'IE PWR-A EICSB PWR-A PD1 LA DI IANNl>D PWR-A RSB ELD/HDS4 NRR/ORAS RGN1 COP IES LTTR ENCL 2

1 1

'XTERNAL: EQM BRUSKE> S

'RC PDR 02 LPDR NSIC 03 05 TOTAL NUI'IBER OF COPIES REQUIRED:

LTTR 23 ENCL

,J I

n 1

J J

kl

'H

i o

WiÃllll/

u/S/IP'I/O/f/Ni NllllliI ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, 8Z,:.:::

N.Y. 14649-0001 ROGERNN. KOBER NRCE PRESIDENT ELECTRIC &STEAM PRODUCTION December 2~

1986 T ELE P NN0 N E AREA CODE Tld 546.2700 Director of Nuclear Reactor Regulation Attention:

Mr. George E. Lear> Chief PWR Project Directorate No.

1 U.S. Nuclear Regulatory Commission Washington>

D.C.

20555

Subject:

Safety Evaluation Storage of. Consolidated Fuel R.

E. Ginna, Nuclear Power Plant Docket No. 50-244

Dear Mr. Lear:

By letter dated December 16I 1985I the NRC Staff provided a

Safety Analysis Report on an application by Rochester Gas 6 Electric dated February 27, 1985.

This application requested an amendment to the Ginna Technical Specifications allowing the storage of consolidated spent fuel and increasing the storage capacity of the spent fuel pool.

The SER concluded that storage of consolidated fuel was acceptablei but maintained the limit on storage capacity at 1016 fuel assemblies.

In our review of the SERI two statements were noted in the Staff's analysis that were not consistent with the amendment application or our responses to Staff requests for additional information.

These statements concern the use of fuel with burnable poisons and the auxiliary building crane.

Your review and clarification of this SER is requested.

The inconsistencies noted below present the potential for unnecessary confusion and the perception that plant operation may exceed the bounds of the licensing basis.

Although these issues were discussed with the NRC Staff after Amendment 12 was issuedi no further action has been taken.

In Section 2.1 of the December 1985 SER it is stated that "Rochester Gas 6 Electric does not have nor do they contemplate to use fuel assemblies with burnable poisons>...".

The reference given was our response to Staff questions dated July lli 1985.

In the response to question 4 of that letter>

RGGE included a provision that the applicability of the burnup-enrichment curves of Figure 5.4-2 of the Technical Specifications would be verified if burnable poisons were used.

The verification would assure that the criteria for the pool Keff of less than or equal to.95 would be met.

The provisions ab'j.2090491 ab1202 PDR ADOCK.05000244 P

P DRY

P Pl t

II h e

II

for this evaluation were incorpora ted into proposed changes to the basis of the specification which were included in our response.

This same proposed change to the basis included a statement requested by the NRC Staff concerning the effect of storing less than 179 fuel rods per half canister.

Neither of these changes to the basis were incorporated into the specification approved by the SER.

In Section 2.3.2 of the SER<

the Staff analysis of canister handling appears to conclude that because the auxiliary building crane meets the single failure proof criteria of NUREG-0612 and handling of the canister uses the 5 ton hook of the Auxiliary Building crane<

the handling of the canister will satisfy the single failure proof guidelines and is therefore acceptable.

The Staff references the SER on the modification to the Auxiliary Building crane dated October 1<

1984.

This SER<

and the RGGE submittals on which this SER was based<

never addressed any modification to the crane that would result in a load being transported by the 5 ton hook in a single-failure proof mode.

Rather the radiological effects of a canister drop were evaluated and found to be acceptable.

RG6E has modified the 40 ton hook on the auxiliary building crane to be single failure proof to meet other heavy load'handling concerns that are separate from use of the 5 ton hook for canister movements.

Your review of these issues and clarification of the SER will be appreciated.

In addition>

the amendment approval noted that the request to increase the storage capacity of the pool would be handled by a separate licensing action.

RGGE is still interested in the completion of that activity.

RGSE will contact the NRC Staff to develop a schedule to address these issues.

Thank you for your assistance.

Ver truly yours<

Roger W. Kober

I