-6g REGULATO INFORMATION DISTRIBUTION
.STEM (RIDS)
ACCESSION NBR:SS0S100172 DQC. DATE: SS/0S/04 NOTARIZED:
NO
,FACIL: 50-244 Robert Emmet Ginna Nuclear Planti Unit 1i Rochester G
AUTH. NAME AUTHOR AFFILIATION KOBERi R. N.
Rochester Gas Zc Electric Corp.
REC IP. NAME
~ REC IP IENT AFFILIATIQN LEARNS G. E.
PNR Prospect Directorate 1
SUBJECT:
Advises that special communications not required to be made on tueekends or holidays re notif'ication within 48 h
results of'ube insps indicated'egredation beyond certain stated criteria.
DISTRIBUTION CODE A001D COPIES RECEIVED: LTR 1
ENCL 0 SIZE:
TITLE:
QR Submittal:
General Distribution NOTES:
DOCKET 0 05000244 REC IP IENT ID CODE/NAME PNR-A ADTS PWR-A EB PWR-A FOB PNR-A PSB INTERNAL: *DM/LFMB T/TSCB REG F 04 COPIES LTTR ENCL RECIPIENT ID CODE/NAME PMR-A PD1 PD 01 PNR-A EICSB FAIRTILEiM PNR-A RSB ELD/HDS4 NRR/GRAS RGN1 COPIES LTTR ENCL EXTERNAL: 24X LPDR NSIC 0S 05 1
1 1
1 EGSG BRUSKE> S NRC PDR 02 TOTAL NUMBER OF COP IES REQUIRED:
LTTR 23 ENCL 1
>>, j ltd P3 Ill II
>>~
P II I S I
~
)PAL I
I>>I
82PS
/8F L L
~ 0>> Na Ndd Zi(
iii iiiiiiiiiiiiI 3Z,::::
ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 ROGER W. KOBER VICE PRESIDENT ELECTRIC & STEAM PROOUCTION TELEPHONE AREA COOK Tld 546-2700 March 4I 1986 Director of Nuclear Reactor Regulation Attention:
Mr..George E. Leari Chief PWR Project Directorate No.
1 U.S. Nuclear Regulatory Commission Washingtonr D.C.
20555
Subject:
Steam Generator Sleeving, R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Lear:
By letters dated January 30I 1986 and February 7I 1986I the NRC Staff provided their review and approval of recent changes in Rochester Gas and Electric's steam generator tube sleeving program.
In these letters RGGE was required to notify NRR within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> if the results of tube inspections provided indication of tube degradation beyond certain stated criteria.
This requirement for notification was based upon agreements reached with the NRC Staff that were documented in our letter of January 29I 1986.
Our agreement with the Staff was that notification will be made to NRR within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> but no sooner than the next normal working day.
Thus> special communications are not required to be made on weekends or holidays.
In subsequent discussions between Mr. M. Fairtilei NRRI and Mr. P. Wilkensi RGSE<
on February 18I 1986I this agreement was confirmed.
Ve truly yoursi Rope r W.
Kober 8603l00i72 860304 I