BU'EON DEMONSXTION SYSTEM REGULA RY INFORlUQTION DISTRIBUTION SYSTEM (RIDS)
" ACCESSION NBR:8906290453 DOC.DATE: 89/06/21 NOTARIZED: YES FACIL:50-244'Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME.
i'UTHOR AFFILIATION MECREDY,R.C.
Rochester Gas a Electric Corp.
RECIP.NAM" RECIPIENT AFFILiATiON JOHNSON,A.R.
Project Directorate I-3
SUBJECT:
- orwar'ds response to'RC Bulletin 89-001, "Failure of Westinghouse Steam Generator.
Tube Mechanical Plugs."
DISTRIEUT:ON CODE:
IE11D 'OPIES RECE IVED: LTR
(
ENCL j'IZE:
TITLE: Bulletin Response (50 DKT)
Vi OTES:License Ezp date in accordance with 10CFR2,2.109(9/19/72).
DOCKET 05000244 D,
05000244 S
INTERNAL:
RECIPiENT iD CODE/NAME
- PDl-3 LA JOHNSON,A
'"OD/DOA NRR/DEST/ADE 8 NRR/DES'/MEB 9H NRR/DOEA/GCB ll NRR/PMAS ILRB12 P~
RGN1 "ILE 01 COPIES LTTR ENCL 1
0 1
1-1 1
1 1
1 1
RECIPIENT
.ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DEST/ADS 7E NRR/DOEA/EAB 11 NRR/DREP/EPB 10 NUDOCS-ABSTRACT
=RES/DSIR/EIB COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
h'XTERNAL:
1 R
I D
S NOXE 'IO ALL 'KIDS" RIXXPIENIS:
PIZASE HELP US IO REDOCE HASTE!
CGNI'ACI'IHE DOCX3MEÃ.!,'XNI'ROLDESK, ROOM Pl-37 (EXT. 20079)
KO ELZMDRTH KKR NAME FBCH DISTRIBUTXCN LISTS PGR DOCX1MEHZS YOU DGHIT NEED!
D S
TOTAL NUMBER OF COPIES REQUIRED.
LTTR 19 ENCL 18 p
h
~.
~.",'".".
ER G~,,
A'i':, "I.'RI - CORPORATION
~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 June 21, 1989 TCLCPnONC, Aaricoor v)e 546-2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Allen R. Johnson Project Directorate I-3 Washington, D..C.
20555
Subject:
Response
to Bulletin 89-01 Failure of Westinghouse Steam Generator Mechanical Plugs R.E.
Ginna Nuclear Power Plant'ocket No. 50-244 Tube
Dear Mr. Johnson:
NRC Bulletin 89-01 requested that licensees verify installation of selected steam generator tube mechanical plugs supplied by Westinghouse, and if applicable, address action items 2 through 4.
Enclosed is. the Rochester Gas and Electric response to actions requested.
Very truly yours, Robert C. Mecredy General Manager Nuclear Production Subscribed and sworn to before me on this 21st day of June, 1989.
SAMUEL K BROWNE lCFNYPOBUC, QsN 4 NwY04
~aafion Ho. N170l1 OuaWiedhMonoe Oy.I Wklto MIConmtiaanbpna Goo.8419
&21 JPOK049 acyO&290<OCK 0500p~g p5S 8+0"Oa~~
Enclosure pDR 0
xc:
U.S. Nuclear Regulatory Commission Region I 475 Allendale'oad King of Prussia, PA 19406 Ginna Senior Resident Inspector
ACTIONS REQUESTED NRC BULLETIN 89-01 A.
Res onse to Action Item 1:
Rochester Gas and Electric (RG&E) has reviewed the information provided by Westinghouse in WCAP-12244, Rev.
1 and in Reference 2 of NRC Bulletin 89-01; and RG&E concurs that no mechanical plugs from heat batches 3279; 3513,
- 3962, and 4523 are installed in the Ginna steam generators.
Presently, Ginna has 176 Westinghouse Alloy 600 mechanical plugs installed in the B steam generator dand no Westinghouse Alloy 600 mechanical plugs installed in the A steam generator.
These plugs are from three different heat batches.
The specific heat batches installed at,.Ginna and the number of plugs in each heat batch are presented below.
11 1
1
~11 NX-9789 NX-1660, NX-2386 40 14 33 40 16 33 80 30 66 B.
Res onse to Action Items 2(a) 2(b) and. 2(c):
These items were not applicable to Rochester Gas and Electric since Westinghouse mechanical plugs from heat batches
- 3279, 3513,
- 3962, and 4523 are not installed at Ginna.
C.
Res onse to Action Item 2(d):
1 All of the Westinghouse Alloy 600 mechanical plugs present in the B
steam generator at Ginna were installed in outages between December 1979 and October 1982.
Subsequent to the 1982
- outage, Rochester Gas and Electric discontinued using Westinghouse Alloy 600 mechanical plugs.
Rochester Gas and Electric has no plans to install any Westinghouse Alloy 600 mechanical plugs in the future.
D.
Res onse to Action Item 2(e):
During the 1989 refueling outage at Ginna seven (7) mechanical plugs were removed from the Ginna steam generators
[four (4) from the A steam generator and three
[3] from the B steam generator).
Two of these plugs which were representative of heat batches NX-1660 and NX-9789 were provided to Westinghouse for examination to'ssess their resistance to PWSCC.
At future outages samples of any Westinghouse mechanical plugs that are removed will be offered'o Westinghouse for examination to improve their data base on heat batch specific resistance to PWSCC.
Res onse to Action Items 3 and 4:
These items are not applicable to Rochester Gas and Electric since Westinghouse mechanical plugs from heat batches
- 3279, 3513,
- 3962, and 4523 are not installed at Ginna.