Responds to NRC Re Violations Noted in Insp Rept 50-244/87-27.Corrective Actions:Listed Items Incorporated Into P&ID Upgrade Effort
ML17251A549
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/14/1989
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8906290401
Download: ML17251A549 (10)


Text

sreprm>> r J 'L ROCHESTER GAS AND ELECTRIC CORPORATION

~ eg EAST AVENUE, ROCHESTER, N.Y. 14649-0001 June 14, 1989

.C(.CP~ONE

<~cd cooa.ie 546.2700 Mr. William T. Russell Regional Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406

Subject:

Inspection Report 50-244/87-27 Notice of Violation R.E.

Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Russell:

Our letter to you dated February 5, 1988 on the subject Notice of Violation stated that: "Full compliance will be achieved for all Ginna Station System P&IDs by June 30, 1989".

Zn order to ensure the high quality P&IDs which we desire, RG&E has increased the scope of the P&ID Upgrade project beyond what was originally estimated.

Along with the previously communicated corrective steps, RG&E has also incorporated the following items into our P&ID Upgrade effort:

a) gather nameplate information (where accessible) for all valves and equipment shown on the P&IDs; primarily to support development of a mechanical equipment database for use in our Configuration Management Program.

b) field labeling of all valves which were not previously shown on the P&IDs (primarily instrumentation valves);

c) field verification and labeling of many subsystems which appeared as "skid mounted" on the original P&IDs; d) generation and implementation of a Standard Nomenclature list to identify the components shown on the P&IDs.

The incorporation of the above items into our P&ID Upgrade Project has resulted in the generation of approximately 35 new drawings, with significant additional detail.

Because of the increased scope required for RG&E to ensure a

quality end

product, the currently-projected date for completion of this project is November 30, 1989.

Very truly yours, Robert C. Mecredy General Manager Nuclear Production MFKN044 Attachments xc:

Mr. Allen R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555 Ginna Senior Resident Inspector

ACCEMENTED a

os REGULATORY ZNEORMATZON DZSTRZBUTZON SYSTEM (RZDS)

<ACCESS'ION NBR:.8906290401 DOC.DATE: 89/06/14 NOTARZSED:

NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

TH.NAME AUTHOR AFFILIATION REDY,R.C.

Rochester Gas a Electric Corp.

CIP.NAME RECIPIENT AFFILIATION RUSSELL,W.T.

Region 1, Ofc of the Director

SUBJECT:

Responds to NRC 880205 ltr re violations noted in Insp Rept 50-244/87-27,Corrective actions:PGZDs upgraded.

DISTRIBUTION CODE:

ZE01D COPIES RECEIVED'LTR l

ENCL L SIZE TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

DOCKET 05000244 05000244 c;

RECIPIENT ID CODE/NAME PDl-3 PD INTERNAL: AEOD AEOD/TPAD NRR SHANKMAiNiS NRR/DLPQ/PEB NRR/DREP/EPB 10 NRR/PMAS/ILRB12 OE LIEBERMANiJ aa~~

RGN1 FILE 01 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME JOHNSONiA AEOD/DEZZB DEDRO NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB 10 NUDOCS-ABSTRACT OGC/HDS2 RES MORISSEAUzD COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 2

2 1

1 1

1 1

1 D

S E

ERNAL: LPDR NSIC 1

1 1

1 NRC PDR 1

1 R

I D

NOIE 'IO ALL '%3ZG" RECIPIEPIS:

PLE'ASE HELP US TO REDUCE 'RASTE.'XM5KT 'IHE DOCUMENT CORI'.ROL DESK, RXN P1-37 (EXT. 20079)

KO EXAMINATE YOUR NAME FRCH DZSTRIBUTIOH LISTS FOR DO(XIMEMIS YOU jXINITNEEDf TOTAL NUMBER OF COPIES REQUIRED:

LTTR 23 ENCL 23

June 14, 1989 Mr. William T. Russell Regional Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406

Subject:

Inspection Report 50-244/87-27 Notice of Violation R.E. Ginna Nuclear Power Plant Docket No. 50"244

Dear Mr. Russell:

Our letter to you dated February 5, 1989 on the subject Notice of Violation stated that.: "Full compliance will be achieved for all Ginna Station System P&IDs by June 30, 1989".

In order to ensure the high quality P&IDs which we desire, RG&E has increased the scope of the P&ID Upgrade project beyond what was originally estimated.

Along with the previously communicated corrective steps, RG&E has also incorporated the following items into our P&ID Upgrade effort:

a) gather nameplate information (where accessible) for all valves and equipment shown on the P&IDs; primarily to support development of a mechanical equipment database for use in our Configuration Management Program.

b) field labeling of all valves which were not previously shown on the P&IDs (primarily instrumentation valves);

c) field verification and labeling of many subsystems which appeared as "skid mounted" on the original P&IDs; d) generation and implementation of a Standard Nomenclature list to identify the components shown on the P&IDs.

The incorporation of the above items into our P&ID Upgrade Project has resulted in the generation of approximately 35 new drawings, with significant additional detail.

seosaeo4o~

~gooO244 eosi<

@OR gOQCK O

pgg 6

Because of the increased scope required for RG&E to ensure a

<papality end

product, the currently-projected date for completion of this project is November 30, 1989.

Very truly yours, 9

Robert C. Mecredy General Manager Nuclear Production MFKK044 Attachments xc:

Mr. Allen R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555 Ginna Senior Resident Inspector

8