ML17251A505

From kanterella
Jump to navigation Jump to search
Amend 36 to License DPR-18,revising Rod Insertion Limits for Cycle 19 Fuel Reload to Ensure That All Criteria for Reload Met
ML17251A505
Person / Time
Site: Ginna 
Issue date: 05/22/1989
From: Wessman R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17251A506 List:
References
NUDOCS 8906010028
Download: ML17251A505 (4)


Text

~ gO~ R<cuc Wp0 co ~

~

~+a 00 D Q'+0, qO'

    • y4 e

UNITED STATES t

NUCLEAR,REGULATORY COMMISSION WASHINGTON, D. C. 20555 l

I ROCHESTER GAS AND ELECTRIC CORPORATION DOCKET NO. 50-244 R.

E.

GINNA NUCLEAR POWER PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 36 License No.

DPR-18 1.

The Nuclear Regulatory Commission (the Comission) has found that:

A.

The application for amendment by Rochester Gas and Electric Corporation (the licensee) dated February 24, 1989 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regu'Iations; and D.

The issuance of this amendment will not be inimical to the comIon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51

'f the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. DPR-18 is hereby amended to read as follows:

8906010028 S90522 PDR ADOCK 05000244 P

PDC

(2)

Technical S ecifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 36

, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective on the date of issuance.

FOR THE NUCLEAR REGULATORY COHHISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

lay 22, 1989

~ cu Richard H. Wessman, Director Project Directorate I-3 Division of Reactor Projects I/II

ATTACHMENT TO LICENSE AMENDMENT N036 FACILITY OPERATING LICENSE NO.

DPR-18 DOCKET NO. 50-244 Revise Appendix A'echnical Specifications by removing the pages identified below and inserting the enclosed pages.

The revised pages are identified by the captioned amendment nUmber and contain margina l lines indicating the area of change.

REMOVE INSERT

I IGURE 3. IO-1 CONTROL ROD IN)ERTION LIMITS VERSUS CORE POWER FOR DOL THROUGII EOL l)cl. h(d line is

<>pi> I. i(:d!)Ie only I or Cy<

I <:

I ')

M i I li <:y<: I I>i>r iiiil> <ii

< >il.i I ii.iri 5250 HHD/HTU pr.-oviding Cycle 18 b<rrnu!) Iiri:

(.x(.(.(l<l<.(l I 2 I 5() Hill)/HTIJ.

100 I>>

>-o 80

<>JoI

60 O

P I

40 20 0

"'I I"

!!l j!U

I:I IIII

':::-.j

,:I::I:.I:i

~

~

l>.I jl>l

i:::j!i::::

':-::;:j:::::

I::
I:I'.:~

i.';I !!!I

"~I'I

.'!:I i."I ii'.! I:li ijil II."

li::I II~!

ii:I,

~ ~

~ ~

~

~ ~

Ijli iii!

~ ~ ~ ~

ll:

ln

~

I Ji lji III

~l

~Ii ij I

I":.a!,

I'll

~

D Dank I

I II II jj I

!II, I."I

'ji'l!l jl I I,I I

I I

~

I II an j

I I rl

j:

I i

I I ~

~

i',

jll I

III:

I!i!

j>>

jj Hjl:i j~li, II!I

!,'i!

j>>j

>Il

!i!::

I:
I
I::

i:

~ I ill>

WO ~

>III

I:I i>jr>

!I:j "I:

~>'Ir i!il

>ijll

'lii lli'Ill Ial

ili I'!I

~I:.

>>: 'll:

!Ii> !i i I":!iii

~

>iii p" P'.ii

~, '

I'.

I

.:: I:::

liii ilia j"i

'-'-'ll!

Ii::

j: ~'j>l:

i)li ~l':

i>ii 'i!I ll LL'ljlIrll

>a I"I U

II!i l.ij t:.ji ii:

II>'.

i"

~ >:

~ ~

g!>

IL'>!

~ ~

~ ~

I IU.25'. I 0

10 20 30 40 -

50 60 70 Core Power (Percent of 1520 MWT) 80 90 100