Responds to Generic SER on Rev 0 to Generic Implementation Procedure Developed by Seismic Qualification Util Group Re USI A-46.Util Will Either Commit to Pursue Generic Resolution of USI A-46 or File plant-specific Response
ML17251A318
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/07/1988
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Stahle C
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR NUDOCS 8810140198
Download: ML17251A318 (5)


Text

ACCELERATED DIARIBUTION DEMONST107ION SYSTEM REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS)-

ACCESSION NBR:8810140198 DOC.DATE: 88/10/07 NOTARIZED-NO

'OCKET FACXL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFXLIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to generic SER on resolution of USI A-46.

DISTRIBUTION CODE:

A048D COPIES RECEIVED:LTR

(

ENCL t SIZE:

TITLE: OR/Licensing Submittal:

Equipment Qualification NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

, R I i I 05000244

> <<)'ECIPIENT

<<%D'ODE/NAME PD1-3 LA STAHLE,C

COPIES,

't'TTR ENCL 1

0 1

1

';, RECIPIENT" "4-"( ~, '

COPXEQ'):,

'"'ID CODE/NAME

'TTR 'ENCL

'D1-3 PD 1

0 INTERNAL: ARM/DAF/LFMB NRR/DEST/MEB 9H OGS AB RACT REG F 01 1

0 1

1 1

1 1

1 NRR/DEST/ADE 8H NRR/DEST/SGB 8D OGC/HDS2 RES/DSXR/EIB 1

1 1

1 0I 1

1 1

EXTERNAL: LPDR NSIC 1

1 1

1 NRC PDR 1

4 r

4 S

i' TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 10

ZltIIIg ZZZZZSZ ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 'f4649-0001 October 7, 1988 TKLCPHONE AAEAcooE 7ld 546-2700 U.S. Nuclear Regulatory'ommission Document Control Desk Attn:

Mr. Carl Stahle PWR Project Directorate No.

1 Washington, D.C.

20555

Subject:

Response

to Generic SER on Resolution of Unresolved Safety Issue A-46 R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Stahle:

On July 29,

1988, the NRC Staff issued.

a Safety Evaluation Report (SER) on Revision 0

of the Generic

'Implementation Procedure (GIP) developed by the Seismic Qualification Utility Group (SQUG).

The letter to SQUG enclosing the SER requests that SQUG member utilities provide to the NRC, within 60 days, a schedule for implementing the GIP.

By letter to Mr.

Shao, dated August 19,
1988, SQUG clarified that the 60 days would expire on October 7,

1988.

This letter responds to that request.

According to the generic schedule submitted by SQUG in its October 9,

1987 letter, the GIP was to be completed by the end of calendar 1988, followed by NRC review in the first quarter of 1989.

However, as the SER acknowledges, the GIP is not yet complete.

Several technical areas have not yet been fully included in the GIP.

Moreover, the SER does not resolve certain licensing issues central to the completion of the GIP raised in Part 1 of Revision 0.

Given this delay in SER issuance, this objective is considered not achievable.

The schedule for completion of the GIP has been established to be in the first quarter of 1989.

This schedule is dependent upon:

(1) satisfactory and timely resolution of all outstanding

issues, (2) accomplishment of all interim'ilestones as set forth in the schedule and (3) continued agreement between SQUG and NRC on major technical and licensing issues.

I li i R

RG&E will not be in a position to establish the scope of its A-46 commitment until the GIP is completed and all licensing issues resolved.

Given the magnitude of the effort required to achieve resolution of A-46, final implementation must be carefully integrated into outage schedules.

Assuming no significant changes in the workscope currently envisioned.

for resolution, the plant walkdown associated, with the resolution of this issue can be undertaken by the conclusion of the second refueling outage after the final SER is issued and open items resolved.

Identification of safe shutdown equipment and other tasks necessary to prepare

" for the walkdown will be accomplished prior to that outage.

If the GIP is completed during the first quarter of

1989, and, a

final SER with no open items or significant change in workscope is issued in the second quarter of

1989, this outage would commence for R.E.

Ginna on or about March 1, 1991.

If the schedule for GIP development and NRC review slips further, the walkdown and other activities would have to be delayed.

RG&E will review the final GIP after approval by the NRC and resolution of all outstanding issues.

Based on this

review, RG&E will either commit to pursue a

generic resolution of USI A-46 or file a plant-specific response.

Should the generic resolution be pursued, RG&E may, at its

option, elect to modify certain aspects of the generic program based upon suitable justification.

Very truly yours, Robert C. Mecre y General Manager Nuclear Production xc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector

h 4

1 ll