Text
ACCE1ERATED D
BUTlON DEMONS TION SYSTEM REGULATOR INFORMATION DISTRIBUTION SSTEM'RIDS)
ACCESSION NBR:8809010108 DOC.DATE: 88/08/26 NOTARIZED:
NO DOCKET FACIL?50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION STAHLE,C.
PWR Project Directorate 1
SUBJECT:
Forwards encl Tech Specs pages to be exchanged for like numbered pages in util 880126 ltr.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR / ENCL Q SIZE:
TITLE: OR Submittal: General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
/P2 R~
05000244 8
RECIPIENT ID CODE/NAME PDl-3 LA STAHLEgC INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DOEA/TSB 11 DOCS-ABSTRACT E
01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
0 1
1 1
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PDl-3 PD NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/PMAS/ILRB12 OGC/HDS2 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 5
5 1
1 1
1 1
1 1
1 1
0 1
1 1
1 D'
8 h
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 19
t zinzz znznzz uiZ II 1IIeteiZ 3P.::::
ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 August 26, 1988 TEl.EPHONE AREA CODE TIE 546-2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Mr. Carl Stahle PWR Project Directorate No.
1 Washington, D.C.
20555
Subject:
Technical Specification for Reactor Trip Breakers Generic Letter 85-09 R.E.
Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Stahle:
Rochester Gas and Electric submitted an Application for Amendment to the Ginna Operating License dated March 10, 1987 and reflected new requirements for operation and testing of the reactor trip breakers.
Changes in the application were then made in a letter to you dated January 26, 1988 and reflected NRC requested changes and format changes engendered.
by NRC approval of Amendment No. 24.
On June 22, 1988 a telecon was held. between members of your staff and members of the RG&E Engineering staff.
The attached pages should be exchanged for the like numbered pages in our January 26, 1988 submittal as they reflect the changes requested in the June 22, 1988 telecon.
Very truly yours, Robert C.
Mec edy General Manage Nuclear Production Attachments 88090>oioa BgooO24~
.88082~
PDR PDQCK 0 PgU p