ML17251A168
| ML17251A168 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 07/11/1988 |
| From: | Snow B ROCHESTER GAS & ELECTRIC CORP. |
| To: | Russell W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-88-003, IEB-88-3, NUDOCS 8807190046 | |
| Download: ML17251A168 (2) | |
Text
gc CELE RATED 31.'~~BUTlON DEMONSTRXTJON SYSTEM REGLLAl:NPOR.'r%-:ON DIS'R 3UTI S'rS,:"N (RIDE)
ACCESSION NBR:8807190046 DOC.DATE: 88/07/11 NOTARIZED:
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Roches-er G
AUTH.NAM" AUTHOR AFFIr ZATION SNOW,B.A.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION RUSSELL,W.T.
Region 1, Ofc of the Director
SUBJECT:
Advises that plant has no GE HFA-type latching relays,per NRC Bulletin 88-003, "Inadequate Latch Engagement...."
DISTRIBUTION CODE: IEllD COPIES RECEIVED:LTR'J ENCL Q SIZE:
TITLE: Bulletin Response (50 DKT)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
DOCK-T 05000244 D
05000244 8
RECIPIENT ID CODE/NAME PDl-3 LA STAHLEiC INTERNAL: AEOD/DOA AEOD/DSP/TPAB NRR/DEST/ADE 8H NRR/DEST/MEB 9H NRR/DOEA/GCB 11 NRR PMAS ILRB12 EG FME 02 RGN1 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP NRR RIVENBARKiG NRR/DEST/ADS 7E NRR/DOEA/EAB 11
'RR/DREP/EPB 10 NUDOCS-ABSTRACT RES/DE/EIB NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
j D
D R
I h
D S
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 44-
+OC~ STER GAS AND ELECTRIC CORPORATIOhl o 89 EAST AVEIVL'E. ROCKIEST '9, July ll, 1988 Mr. William T. Russell Regional Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406
Subject:
Response
to NRC Bulletin 88-03 Inadequate Latch Engagement in HFA Type Latching Relays Manufactured by General Electric (GE)
Company R. E. Ginna Nuclear Power Plant, Unit No.
1 Docket No. 50-244
Dear Mr. Russell:
In response to the instructions of NRC Bulletin 88-03, please be advised that R.
E.
Ginna Nuclear Power Plant does not have any HFA type latching relays subject to this bulletin.
Staff time required to prepare the requested documentation for this bulletin was approximately twelve hours.
Very truly yours, e
Bruce A. Snow Superintendent Nuclear Production xc:
U.S. Nuclear Regulatory Commission (origi.nal)
Document Control Desk Washington, D.C.
20555 Ginna Senior Resident Inspector 8807190046 880711 PDR ADOCK 05000244 Q
PNU pIl