ML17250B256
| ML17250B256 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 06/02/1993 |
| From: | Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | Andrea Johnson NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| References | |
| GL-89-13, NUDOCS 9306090226 | |
| Download: ML17250B256 (3) | |
Text
iCCEI ERAT DOCMCENT DIST UTION SYSTEM REGULAT INFORMATION DISTRIBUTIO YSTEM (RIDS)
.SSION NBR:9306090226 DOC.DATE: -93/06/02 NOTARIZED: NO DOCKET N
CIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 UTH.NAME AUTHOR AFFILIATION ECREDY,R.C.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Project Directorate I-3 P
SUBJECT:
Responds to NRC ltr re violations noted in insp rept 50-244/93-05 on 930320.Corrective actions:svc water sys reliability optimization program plan revised.
DISTRIBUTION CODE:
IEOID COPIES RECEIVED:LTR
(
ENCL + SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response D
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244
/
RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD/DEIB AEOD/TTC NRR/DORS/OEAB NRR/DRIL/RPEB e
NRR/PMAS/ILPB1 NUDOCS-ABSTRACT OGC/HDS1 RES MORISSEAU,D EXTERNAL: EG6G/BRYCE,J.H.
NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME JOHNSON,A AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFB NRR/DRSS/PEPB NRR/PMAS/ILPB2 OE DI REG FIL 02 Nl F
E 01 NRC PDR COPIES LTTR ENCL D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL
- 'IIIrifi~ll~ll'/~kiril,"'.
ROCHESTER GAS AND ELECTRIC CORPORATION ROBERT C MECREOY Vice Prerident
'innrr Nucfeer Production t
rrc ~
~ ~ r eisa Qi
'T "
~ lock c ",
I.,state
~
89 EAST AVENVE, ROCHESTER N. Y. 14649-0001 TELEPHONE AREACODE 7 re 546-2700 June 2,
1993 U. S. Nuclear Regulatory Commission Document Control Desk Attn:
Allen R. Johnson Project Directorate I-3 Washington, D.C.
20555
Subject:
Response
to Inspect on Report 50-244/93-05 dated March 20, 1993 Regarding Service Water System Inspections R.E.
Ginna Nuclear Power Plant Docket No. 50-244 Ref.(a):
Letter from R.
C. Mecredy (RG&E) to A. R. Johnson (NRC),
"Ginna Station Modifications Engineering Work Requests (EWR) 5161,
- 4970, and,5405",
dated February 23, 1993
Dear Mr. Johnson:
The purpose of this letter is to explain the status of two RG&E commitments recently reviewed by the NRC.
In Section 3.2 of the subject inspection report and its cover letter, it was indicated that RG&E had deferred the completion of two commitments until the 1994 refueling outage.
The inspector was concerned that these items did not receive proper follow-up and the docket did not reflect these changes in status.
The report identified this concern as unresolved item 93-05-01.
These two commitments, identified in RG&E's tracking.system as R01968 and R01969, had previously been made by RG&E as part of our response to Inspection Report No.91-201, Service Water System inspection.
The first item (R01968) involved development of an erosion/corrosion program and the second item (R01969) involved the conduct of an underground piping inspection of the service water system.
Relative to R01968, our commitment to develop an erosion/corrosion program has not been extended.
The 1993 Refueling Outage Erosion/Corrosion Inspection Plan (SWSROP-001) was completed to support the 1993 outage and the Service Water System Reliability Optimization Program (SWSROP) Plan was revised (Rev. 2, 4/20/93) to include the necessary changes to the erosion/corrosion activities previously identified by NRC as weaknesses during the Generic Letter 89-13 reviews of our program.
Therefore, item R01968 is completed.
9306090226 930602 PDR ADQCK 05000244 6
~pP
Relative to R01969, a letter was submitted, Reference (a),
which notified the NRC of our intent, and the basis for the extension, of the underground piping inspection, which is being developed under Engineering Work Request 5405.
Since the 93-05 inspection was conducted during the period from February 16-.19, 1993, just prior to our submittal being
- made, this may have resulted in the inspector's reported concern.
Item R01969'as been rescheduled for the 1994 refueling outage.
We trust that the Reference (a) submittal and this additional information provides the necessary clarification.
Very truly yours, Robert C. Mecredy GAH/285 Attachment xc: Mr. Allen R. Johnson (Mail Stop 14D1)