ML17250A961
| ML17250A961 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 08/28/1989 |
| From: | Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | Perkins K Office of Nuclear Reactor Regulation |
| References | |
| GL-89-12, NUDOCS 8909120238 | |
| Download: ML17250A961 (8) | |
Text
gc CEEE WTED DIKBUTI ON DEMONSTTION SYSTEM REGULATORY INFORMATION DISTRIBUTION, SYSTEM (RIDS)
ACCESSION NBR:8909120238 DOC.DATE: 89/08/28 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION MRECREDY,R.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION PERKINS,K.E.
Operator Licensing Branch
SUBJECT:
Forwards proposed operator licensing
& requalification exam schedule,per GL 89-12.
DISTRIBUTION CODE:
M003D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Operator Regualification Program NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A COPIES LTTR ENCL 1
0 1
1 RECIPIENT ID CODE/NAME PD1-3 PD COPIES LTTR ENCL 1
1 INTERNAL: AEOD/DOA NRR/DLPQ/HFB 10 NUDOCS-ABSTRACT RGN1 AEOD/DSP/TPAB 1
1
/JKRQ LB 10 1
1 REG FILE 1
1 EXTERNAL: LPDR NSIC NRC PDR 1
1 R
I D
S h
NOXE 'IO ALL 'SIDS" RRCZPIENIS
(.I PURSE HELP US IO REMCE %RUB! ~~CT 'QK DOCUMEÃZ CXWGK)L DESK RXH P1-37 (EZZ. 20079) I EZaIMZNAXB~ K[ME PKH DIPI%GBlOTZOS TOTAL NUMBER OV%5RES~IP L%5P %
ENCL 12
a
~ ~~
fi/ IIIIIIIl//I/I/Illl/III
'( IrlF@III/ IIIIIIIIII
~i'april(t
!iuriIIIII l
SEATE ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 (V
-P 1
TELEPHONE AREA CODE TIE 546 2700 lt
!i August '28, 1989
'1 Mr. Kenneth E. Perkins Jr., Chief Operator Licensing Branch" OWFN-10D-18 U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Perkins:
Zn response to your Generic Letter 89-12, attached is a schedule of our needs for operator licensing examinations, along with our anticipated requalification examination schedule.
Please contact Mr. Robert Carroll at (315) 524-4446, ext.
328, if you have any questions regarding our schedule.
Sincerely, Attachment Robert Me edy General Manager Nuclear Production xc:
W. Russell S. Spector G. Meier Ginna Resident Inspector 8909'1202 ~8 -SyOP2~
PDR ADOCK 05000244 V
l
~e h
I 7l P
'P H
h f
e l
Enclosure 1
PROPOSED OPERATOR LICENSING EXAf1INATION SCHEDULE FORMAT Facility R. E. Ginna NRC Region FY 1990 FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90)
(10/1/90-9/30/91)
(10/1/91-9/30/92)
(1U/1/92-9/30/93)
-J 1.
Assigned.
Date (GL 89-03)
FEB FEB PRO 0.
0 0
0 PSRO Instant gSRU Upgrade 8SRO Limited 2.
Assigned Date (GL 89-03)
<<RO PSRO Instant 8SRO Upgrade 5
PSRO Limited
.0
,0
~ 0 Please indicate instial cold license examinations by placing an asterisk (*) by the date.
Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two aster isks (**}. (t or example, if Unit 1 is in operation and Unit 2 is approaching fuel load, and three RO candidates with no prev>ous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit 1 are'o be examined to extend their licenses to Unit 2, then indicate "RO 3,5**.")
I' ll
~
~
~
Enclosure 2
PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FOPMAT Facility R. E.'inna NRC Region Planned Simulation Facility Certltication/Approval Date FY 1990 FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90)
(10/1/90-9/30/91)
(10/1/91-9/30/92)
(10/1/92-9/30/93) 2.
3.
5.
Date 1/15/90 Date 1/22/90 Date 1/29/90 Date 2/9/90 Date 2/12/90 Date 2/91 Date Date Date Date Date 2/92 Date Date Date Date Date~293 Date Date Date Date
0, st 4
~
~,
'hq
~
k~
J I