ML17250A961

From kanterella
Jump to navigation Jump to search
Forwards Schedule of Needs for Operator Licensing Exam & Anticipated Requalification Exam Schedule,In Response to Generic Ltr 89-12
ML17250A961
Person / Time
Site: Ginna 
Issue date: 08/28/1989
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Perkins K
Office of Nuclear Reactor Regulation
References
GL-89-12, NUDOCS 8909120238
Download: ML17250A961 (8)


Text

gc CEEE WTED DIKBUTI ON DEMONSTTION SYSTEM REGULATORY INFORMATION DISTRIBUTION, SYSTEM (RIDS)

ACCESSION NBR:8909120238 DOC.DATE: 89/08/28 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION MRECREDY,R.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION PERKINS,K.E.

Operator Licensing Branch

SUBJECT:

Forwards proposed operator licensing

& requalification exam schedule,per GL 89-12.

DISTRIBUTION CODE:

M003D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Operator Regualification Program NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A COPIES LTTR ENCL 1

0 1

1 RECIPIENT ID CODE/NAME PD1-3 PD COPIES LTTR ENCL 1

1 INTERNAL: AEOD/DOA NRR/DLPQ/HFB 10 NUDOCS-ABSTRACT RGN1 AEOD/DSP/TPAB 1

1

/JKRQ LB 10 1

1 REG FILE 1

1 EXTERNAL: LPDR NSIC NRC PDR 1

1 R

I D

S h

NOXE 'IO ALL 'SIDS" RRCZPIENIS

(.I PURSE HELP US IO REMCE %RUB! ~~CT 'QK DOCUMEÃZ CXWGK)L DESK RXH P1-37 (EZZ. 20079) I EZaIMZNAXB~ K[ME PKH DIPI%GBlOTZOS TOTAL NUMBER OV%5RES~IP L%5P %

ENCL 12

a

~ ~~

fi/ IIIIIIIl//I/I/Illl/III

'( IrlF@III/ IIIIIIIIII

~i'april(t

!iuriIIIII l

SEATE ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 (V

-P 1

TELEPHONE AREA CODE TIE 546 2700 lt

!i August '28, 1989

'1 Mr. Kenneth E. Perkins Jr., Chief Operator Licensing Branch" OWFN-10D-18 U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Perkins:

Zn response to your Generic Letter 89-12, attached is a schedule of our needs for operator licensing examinations, along with our anticipated requalification examination schedule.

Please contact Mr. Robert Carroll at (315) 524-4446, ext.

328, if you have any questions regarding our schedule.

Sincerely, Attachment Robert Me edy General Manager Nuclear Production xc:

W. Russell S. Spector G. Meier Ginna Resident Inspector 8909'1202 ~8 -SyOP2~

PDR ADOCK 05000244 V

PDC

l

~e h

I 7l P

'P H

h f

e l

Enclosure 1

PROPOSED OPERATOR LICENSING EXAf1INATION SCHEDULE FORMAT Facility R. E. Ginna NRC Region FY 1990 FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90)

(10/1/90-9/30/91)

(10/1/91-9/30/92)

(1U/1/92-9/30/93)

-J 1.

Assigned.

Date (GL 89-03)

FEB FEB PRO 0.

0 0

0 PSRO Instant gSRU Upgrade 8SRO Limited 2.

Assigned Date (GL 89-03)

<<RO PSRO Instant 8SRO Upgrade 5

PSRO Limited

.0

,0

~ 0 Please indicate instial cold license examinations by placing an asterisk (*) by the date.

Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two aster isks (**}. (t or example, if Unit 1 is in operation and Unit 2 is approaching fuel load, and three RO candidates with no prev>ous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit 1 are'o be examined to extend their licenses to Unit 2, then indicate "RO 3,5**.")

I' ll

~

~

~

Enclosure 2

PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FOPMAT Facility R. E.'inna NRC Region Planned Simulation Facility Certltication/Approval Date FY 1990 FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90)

(10/1/90-9/30/91)

(10/1/91-9/30/92)

(10/1/92-9/30/93) 2.

3.

5.

Date 1/15/90 Date 1/22/90 Date 1/29/90 Date 2/9/90 Date 2/12/90 Date 2/91 Date Date Date Date Date 2/92 Date Date Date Date Date~293 Date Date Date Date

0, st 4

~

~,

'hq

~

k~

J I