A,CCEILRATED DI BU.TION DE MONS TI0.'i SYSTEM 1 ~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 8907270011 DOC. DATE: 89/07/19 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Project Directorate I-3
SUBJECT:
Responds to 890628 request for addi info re 890526 response to NRC structural upgrade program SER.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal:
General Distribution DOCKET g
05000244 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A INTERNAL: NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/MTB 9H NRR/DOEA/TSB 11 OC ~EMB EG FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
1 5
5 1
1 1
1 1
1 1
1 1
0 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD NRR/DEST/CEB 8H NRR/DEST/ICSB NRR/DEST/RSB 8E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
0 1
1 1
1 R
D h
NorE 'ro ALL Rzrs REczpIENrs.
PIZASE HELP US 'IQ REDUCE RRHR!
COMrAC1 'IHE DCXUMEÃZ CONrROL DESK ROON Pl-37 (EXT. 20079) m 1KaIKQCGR ACR NME PBCH DISTRIBUTION LISTS FOR DOCUMEPZS KNJ DGN~T NEEDt TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 20 p ~P-D S
p' Pg 4
I 41 1
A
IIIIIIIIII/
IIIIII/////III I!IIIIIIIIIII ilZZZI)ll IIIIIIIIIIII ROCHESTER GAS AND ELECTRIC. CORPORATION o 89 EAST AVENUE, July 19, 1989 ROCHESTER, N.K 14649-0001 TELEPHON C AAKAcoDK 7I5 546-2700 U.S. Nuclear Regulatory Commission Document Control Desk (w/o sketches)
Attn:
Allen R. Johnson Project Directorate I-3 Washington, D.C.
20555
Subject:
Request for Additional Information Structural Upgrade Program SER R.E.
Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Johnson:
During a conference call held June 28, 1989 between RG&E (Len
- Sucheski, George Wrobel) and the NRC (Al Johnson, David Jeng, John Ma, Neal Johnson), it was requested that RG&E provide additional explanation of two issues related to RG&E's May 26, 1987 response to the NRC's Structural Upgrade Program SER.
Attached is the requested information:
1) calculations for translating the ANSI 58.1-1982 straight wind shape and magnitudes to Ginna structures, including applicable sketches.
This data is submitted relative to Issue 52 of RG&E's May 26, 1987 response.
2) calculations related to the critical buckling stress of the diesel generator roof deck referenced in Issue 55 of the same response.
We trust that this information will allow the NRC to finalize the Structural Upgrade Program SER.
Our latest estimate of the completion of all modifications, including the Diesel Generator Building upgrade, is summer 1990.
Very truly yours, Robert C. Mecredy General Manager Nuclear Production GJWN055 Attachment 89072700ii 85'07i9 PDR ADOCK 05000244 P
xc:
U.S. Nuclear Regulatory Commission (w/attach)
Allen R. Johnson Project Directorate I-3 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission (w/o attach)
Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector (w/o attach)
ATTACHMENT TO RGRE LETTER DATED JULY 18 1989 ISSUE I2 - WIND LOAD SHAPE DOCUMENT Procedure for Load Calculations 1-WP-023-0412-0305-0 COMMENT This document shows the final results of tornado wind loads and their application to Ginna Station.
Tornado Loading 1-DC-023-0412-152-0 Pages 18-29 This calculation shows the specific application of ANSI A58.1 for determination of tornado wind loads.
Wind Loading 1-DC-023-0412-151-0 Pages 2A-47 This calculation shows the specific of ANSI A58.1 for determination of wind loads on Ginna structures.
Wind Loading 1-DC-023-0412-151-0 Pages 48-75 These drawings show the wind pressure load applied to the plant structures.
ISSUE I5 - BUCKLING CALCULATION DOCUMENT Reference and calculation example
~
COMMENT This calculation shows how the critical buckling stress for the decking is established.
LAS/A067