Suppls 800910 Response to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Mod to Provide for Continuous Continuity Testing Planned
ML17250A852
Person / Time
Site: Ginna 
Issue date: 11/17/1980
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-80-20, NUDOCS 8101080112
Download: ML17250A852 (2)


Text

ROCHESTER GAS AND ELECTRIC CORPORATION e

did

%HI 01Ii&O O(4'9 EAST AVENUE, ROCHESTER, N.Y. I46d9 JOHN K. h(AIER VICE PRESIDENT TCECPHONd AREA coDE Tld 546-F700 November 17, 1980 Mr. Boyce H. Grier, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

IE Bulletin No.80-20 R.E.

Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Grier:

This letter supplements our response of September 10, 1980 to IE Bulletin 80-20, Failures of Nestinghouse Type W-2 Spring Return to Neutral Control Switches.

In our response we committed to perform continuity tests on all switches which are actuated within 7 days of their actuation and on all switches at least once per 31 days.

Ne wish to clarify that the continuity tests will not necessarily be performed while the 'plant is at cold or refueling shutdown.

For switches that are actuated during a cold or refueling outage, continuity tests will be performed within 7 days of leaving cold shutdown.

For switches that are not actuated during a cold or refueling outage, continuity tests will be performed within 14 days of leaving cold shutdown unless this is more restrictive than an elapsed 31 days since the last, test.

In this latter case, the 31 day test interval will be applied.

A modification is currently planned which will provide for continuous continuity testing'.

The testing discussed above will no longer be required once the modification is installed.

Very truly yours,

-4~~,Ql(~

J.. Maier xc:

Director, Div. of Reactor Operations Inspection Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Nashington, D.C.

20555