ML17250A810

From kanterella
Jump to navigation Jump to search
Forwards Pages 3.10-6 to 3.10-10 of Tech Specs Re Control Rod Misalignment,To Facilitate Review
ML17250A810
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/10/1980
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML17250A811 List:
References
NUDOCS 8012160540
Download: ML17250A810 (3)


Text

REGULAT Y INFORt'IATIQN DISTR IBUTIQ"'STEN (R IDS)

ACCESSION NBA: 8012160540 DQC. DATE: 80/12/10 NOTARIZED: NQ DOCKET FAC IL: 50-244 Robert Emmet Ginna Nuc lear P lant'ni t 1I Rochester G 05000244 AUTH. MANE c AUTHOR AFFILIATION YiAIER. J. E. Rochester Gas 5 Electric Corp.

REC IP. NAtlE RECIPIENT AFFILIATION CRUTCHFIELDI D. Operating Reactors Branch 5

SUBJECT:

Forwards Pages 3. 10-6 to 3. 10-10 of Tech Specs re control li rod misalignmentI to f-aci tate review.

DISTR IBUTIOiiI CODE'OOIB COPIEB RECEIVED: LTR /ENCL iP SIZE: P9 P TITLE: General Distribution for after issuance of Operating License NOTES: 1 copy: SEP Sect. Ldr. 05000244 REC I P IENT COP IEB REC IP IENT COPIES ID CODE/MANE LTTR ENCL ID CODE/MANE LTTR ENCL ACTION: CRUTCHF IELD 04 13 13 INTERNAL: D/DIRI HUH FAC08 DIRI DIV OF LIC 1 1 ISE 06 2 2 NRC PDR 02 1 1 0 11 1 0 QR ASSESS BR 10 1 0 v FIL 01 EXTERNAL: ACRB OV 16 16 LPDR 03 NBIC 05 DEC 1'7 1980 QC) PC TOTAL NUNBER OF COPlEB REQUIRED LTTR ~ ENCL

0 7

I I

K.. ~ R.-.a@~

zzmr uzsz A HO ;i< i, YORK i mmes, ZZZuI 'uZg

>'mm ROCHESTER GAS AND ELECTRIC CORPORATION D 89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E. MAIER TELEPHONE VICE PRESIDENT AREA CODE 710 546.2700 December 10, 1980 Director of Nuclear Reactor Regulation Attention: Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No. 5 U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Request for Technical Specification Change Control Rod Position Indication System R.E. Ginna Nuclear Power Plant Docket No.50-244

Dear Mr. Crutchfield:

By letter dated September 3, 1980, we proposed a change to the Ginna Technical Specifications for control rod misalignment to be consistent with Standard Technical Specifications. Based on recent conversations with your Staff, we have determined that because of the manner in which Technical Specification changes for Ginna were issued a number of years ago, requirements in the Technical Specifications we are using appear on different pages than in the version that NRC Staff reviewers are using.

Nevertheless, we believe the specific requirements are identical.

To facilitate your review of the control rod misalignment Technical Specifications, enclosed are copies of pages 3.10-6 to 3.10-10 from our Technical Specifications. In the longer term, we will be working with your Project Manager for Ginna to provide consistency in the location of requirements in our Technical Specifications.

Very truly yours,

~ ~c~

Ol IKJ L7

~

CD~~

C>Z Jo n E. Maier

~ 800I r

RR 1 ~

II(

R RW