ML17250A774
| ML17250A774 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 11/13/1980 |
| From: | Maier J ROCHESTER GAS & ELECTRIC CORP. |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8011180668 | |
| Download: ML17250A774 (4) | |
Text
REGUL'AT ~Y INFORMATION DISTRI BUTI 0 YSTEM (RIDS)
ACCESSION NBR:801118066 DOCNDATE,: 80/1 1/13 NOT'IZED ~
NO FACILE50 244 Robert Emmet Giinna Nuclear Pl ant~ Unit 1r Rochester G
AUTH ~ NAME:
AUTHOR AFF0ILiIATION MAIKRPJ ~ K ~.
Paci fic G'as 8 Electric-Co ~.
RKCI P ~ NAME RECIPIENT" AFF ILLATION CRUTCHF I ELDr D ~
Operating Reactors Branch 5
DOCKET 05000244 SUBJEClT:
Responds to", NRC 801031 1 tr clarifying TMIr r el ated items approved for i mp1 amen tat i on. Out 1 i ne L schedule for model justification for Item II~ K ~ 3 ~ 30 re revised small break LOCA methods was submitted to NRC in West { nghouse 800926 1 t I ~
OISTRISUTION COOE0 AOOIS COPIES RECEIVES:LiTR L ENCl.i 2 SIZE:--'ITLEt Gener al Di st ribut i on-for, af ter Issuance of Operating License NOTES t 1 copy'KP Sect:,. Ldr ~.
05000244" REC I P IENT I D CODE'/NAME<
ACTION:
CRUTCHFlIELD 04 COP IES LIT'TR ENCLi 1 3-RKCIPIENTj ID CODE/NAME'I COPIES LTTR ENCL)
KXTERNALi~
ACRS NSIC'905 INTERNALt: D/DIR E HUM FAG 08 NRC PDR 02 OR ASSESS BR 1 0 1
1 1
1 6 1
1.
RKG F ILE" LPDR 06 1 1 0 1 03 1csO TOTAL NUMBER OFT COPlIES REQUIRED:
LTTR
- .API!<<"
'<<I-Tr 0 E <<T~ )
<<0 '
P rr'r '4 <<)
~
'0 << i ~,'>>
I iryiOt ENCL'
+-'"Ar..; '.'-l <
'r 0N;1 0 +" TrTT ir+.pe g!<<<<r0y>>q '( <<<<-"." ~I<<'f~'<<4 l4jrN h II h1 R / II I'"F h b h JOHN f. MAlfR VlCE PRESIDENT gpss QJ (7 ( 0/BP AlltÃt <! i(uidllÃl I urtiztzu ",, >g NBU'<0" ROCHESTER GAS AND"EL~ECTR)L CORPORATION p)Q 58 o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 'z e Le p H0 Ne Aseh cooe 7ie 546.2700 , '~~<~>~~S~gy~t;pS November 13, 1980 Director of Nuclear Reactor Regulation Attn: Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch 45 U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Clarification of TMI Action Plan Requirements R.
E. Ginna Nuclear Power Plant Docket No. 50-244 E
Dear Mr. Crutchfield:
Darrel Eisenhut's letter dated October 31, 1980 provided clarification of, and incorporated in one document, all TMI related items approved for implementation by the Commission.
Item II.K.3.30, revised small break LOCA methods, required licensees to submit an outline program for model justification or revision by November 15, 1980.
Westinghouse Electric Corpora-tion has stated that it feels very strongly that the small'break LOCA analysis model currently approved by the Staff for use on Westinghouse designed NSSS is conservative and in conformance with 10 CFR 50.46 and Appendix K.
Nevertheless Westinghouse has agreed to work toward improvements of the current methods.
The program outline and schedule are contained in a letter from Mr. T.
M. Anderson to Mr. D. G. Eisenhut dated September 26, 1980 (NS-TMA-2318).
A new model based on a computer code different from the one currently used is planned to be developed and sub-mitted to the NRC staff by January 1, 1982. If new plant specific calculations are required to demonstrate R.
E. Ginna compliance with Appendix K to 10 CFR Part 50, those calculations will be submitted within one year of Staff approval of the new model.
Very truly yours, Jo n E. Maier lp~ ll l
.0 1
,II p
WV Oil +g 8 ~
)'I f l~