ML17250A671
| ML17250A671 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 09/26/1980 |
| From: | White L ROCHESTER GAS & ELECTRIC CORP. |
| To: | Novak T Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8010030375 | |
| Download: ML17250A671 (4) | |
Text
REGULI'Y INFORMATION DISTRIBUTI SYSTEM (RIDS)'CCESSION NBR:8010030375, DOC ~ DATE: 80/09/26 NOTARIZED:
NO DOCKET' FACIL:50-244 Rbbert Emmet Ginna Nuclear Plant< Unit ii Rochester-G 05000244.
AUTH INANE AUTHOR AFFIL:I ATION NHITE P L', D ~
Rochester Gas L Electric Corp'EC IP. NAME RECIPIENT AFFILIATION NOVAKgT ~ MD Assistant Director for Opelating Reactor's
SUBJECT:
Responds to NRC 800815 ltr re exposure ofT fuel'ssemblies control rods during transfer wgile in r'efueling mode, Revised Tech Specs will be revised to>> include min>> level requirement;,
DISTRIBUTION CODE:
ASSIS COPIES.RECEIVED:LTR l'NCL'IZE>f'ITLE:
Gener al. Distr ibution for after Issue'nce of Oper ating Laic NOTES: 1 copy:SEP Sects L'dry 05000244 RECIPIENT ID CODE'/NAME ACTION:
CRUTCHF IELD 04 INTERNAL'/DIRPHUM FAC08 NRC PDR 02 OR ASSESS BR 10 COPIES Ltl'TR ENCL 13 1
RECIPIENT.
ID CODE/NAMEt I8E 0
06 11 01 COPIES LTTR ENCL' 1
1.
EXTERNAL: ACRS NSIC 09 05 16 1
1 LPDR 6 198O 31 0
TOTAL NUMBER OF COPIES REQUIRED:
LTTR ENCL
I e
"r'll h
t t
ll
'l
~
'k "'~
f e
e II p
p 'f
/1 f
I
('
'('
f' j
t g
4 f Fl, II
)
f
$ 'v f t,,'i
<~
'l V
V f
m u
S l'
l S
e
~
t pl P
w i
V
t 0
vrouw zztz rr rrrrrrrrrrrrl r rrrrrrrrrr
.2;,"" (
ROCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER, N.Y. 14649 I.EON D. WHITE, JR.
VICE PRESIDENT TEI.KPIIONE ARE* CODE TIS 546-2700 September 26, 1980 Director of Nuclear Reactor Regulation ATTN: Mr. Thomas M. Novak, Assistant Director for Operating Reactors Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Subject:
August 15,,1980 NRC Letter to AllWestinghouse Pressurized Water Reactor Licensees Water Level above Reactor Vessel ge-wh de 6
. E. Ginna~uclear P
er Plant, Unit $ 1 Doc
Dear Mr. Novak:
This is in response to your letter concerning'the possibility of exposure of fuel assemblies and control rods during transfer while the plant is in Mode 6 (Refueling).
It has been normal practice at Ginna during refueling mode to main-tain approximately 24.5 feet of water above the reactor vessel flange.
Since the manipulator crane lifts the bottom of the fuel assembly no more than one foot above the reactor vessel flange during the transfer, this results in a water height of approximately 10 feet above the top of-the fuel assembly and control rods at their highest point during transfer.
Thus, our past practice of maintaining the proper refueling water level exceeds the NRC recommenda-tion.
This requirement is not at present part of our Technical Specification.
Our Technical Specifications willbe revised to include the requirements of maintaining at least 23 feet of water above the reactor vessel flange while in refueling mode and our appropriate refueling procedures willbe revised to include this minimum level requirement.
Very truly yours, L. D. White, Jr.
86100EO 3 7 ISS F
0
'I k
4 e
u"
~
~
(J' f
l r
I 1