Responds to IE Bulletin 80-15 Re Loss of Emergency Notification Sys.Emergency Sys Powered by 48-volt Dc. Procedure Change Initiated to Require 1-hr Notification. One Manhour Expended on Bulletin
ML17250A665
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/29/1980
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-80-15, NUDOCS 8010010825
Download: ML17250A665 (4)


Text

$"<"SPS '"I'77/'Fl

'I"'JS' St@"'pf'9 ROCHESTER GAS AND g,+I. f',IW ELECTRIC CORPORATION 0

89 EAST AVENUE, ROCHESTER, N.Y. I4649 LEON O. WHITE. JR.

Vlcc PAeSIDSNT Ieeep<CNe AREA COoe Via 546 2700 August 29, 1980 Mr. Boyce H. Grier, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

IE Bulletin No. 80-15, "Possible Loss of Emergency Notification System (ENS) With Loss. of Off-site Power" R. E. Ginna Nuclear Power Plant, Unit ~~1 Docket No.

-244

Dear Mr. Grier:

In response to Inspection and Enforcement Bulletin 80-15 dated June 18, 1980,. concerning the Emergency Notification System, the following information is provided.

New York Telephone was contacted on June 25, 1980 and confirmed that the ENS Communication is powered through their equipment.

The system is powered by 48VDC in their Central Office in Ontario.

Loss of off-site power would not affect most of the phones in this network.

Because of the NRC special instructions for the phone requirements for the resident inspector, his extension of the ENS would be inoperable during loss of off-site power.

Since the system operates continuously on DC power, no test was conducted to verify all extensions would operate with loss of off-site power.

A change to procedure Administrative Order A-.56 Communications Systems at Ginna Station has been initiated which willrequire one hour notification to the USNRC of system inoperability.

ROCHESTER GAS AHD ELECT ORP.

DATE August 29, 1980 Mr. Boyce H. Grier, Director SHEET HO.

2 To assist in evaluating the value/impact of each Bulletin on licensees, manpower expended in conduct of the review and preparation of this report is approximately one manhour.

No corrective actions were necessary.

Very truly yours, L. D. White, Jr.