ML17250A596
| ML17250A596 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 07/18/1980 |
| From: | Noon F WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| To: | Lilley M ROCHESTER GAS & ELECTRIC CORP. |
| Shared Package | |
| ML17250A597 | List: |
| References | |
| RGE-80-93, ST-SST-105, NUDOCS 8009170312 | |
| Download: ML17250A596 (1) | |
Text
Westinghouse Water Reactor Electric Corporation Divisions Mr. M. P. Lilley Rochester Gas I! Electric 89 East Avenue-Rochester, Hew York 14649
Dear Mr. Lilley:
Hucrear Teehnniegy Oiviaibn Box 35s pinsborRhpennsylvania15230 July 18, 1980 ST-SSTA Q5.
RGE 93.
ROBERT EMMETT GIHNA NUCLEAR GENERATING STATION R.
E. Ginna Seismic Upgrading Program Residual Heat Removal S stem, Section
- 200 Transmitted herein is the piping stress report for the R. E. Ginna.'luclear Generating Station Unit Ho. 1, Residual Heat Removal
- System, Section
,200 S DTAR"80 03.
Analysis results and support loads contain d herein reflect the layout arrangement shown on marked isometric C-381-354, Sheet 1, Revision D.
Any significant modifications to the layout of this system of piping and or its restraints will warrant reanalysis of this piping system, Minor design changes or construction modifications will generally not affect stress results and support recommendations.
- However, case by case review of the discrepancies can be used to determine'overall system benavior ana effects.
If any questions exist relative to the above transmittal, please contact W. A. Massie of Westinghouse.
Very truly yours, W. A.
t assie/dj Attachment F. Hoon, Manager Eastern Region WNI Support cc:
R.
E.
R.
C.
M P
T.
R.
.B. H.
P.
M.
B. A.
Smith - 1L, lA
- Mecredy, RGE - 1L, lA Lilley, RGE - 1L, 1A
- Weis, RGE - 1L, lA Bell, GAI - 1L, lA
- Cameron, GAI - 1L, lA
- Snow, RGE - 1L, 1A