ML17250A584
| ML17250A584 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 07/18/1980 |
| From: | Noon F WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| To: | Lilley M ROCHESTER GAS & ELECTRIC CORP. |
| Shared Package | |
| ML17250A585 | List: |
| References | |
| RGE-80-97, ST-SST-103, NUDOCS 8009170295 | |
| Download: ML17250A584 (4) | |
Text
RKGUL'A Y
INFORMATION DISTR I BUT I 0" SYSTEM (RIDS)
ACCESSION NBR:80091,70295 DOC ~ DA7K: 80/07/18 NOTARIZED:, NO DOCKET ¹ FRCIL!50 204 Rober t Emmet Ginna Nucl ear Pl ant g Unit 1P Rochester G
0500024<i AUTH BYNAME AUTHOR AFFILIATION NOONKF Hestinghouse Electric Corps RKC IP ~ NAME RECIPIENT AFFILIATION LILLKY~M.P.,
Rochester Gas 8
E) ectric Corp.
SUBJECT:
Forwards "Piping Stress Analysis ReptPRHR Sys/Section 250."
Analysis results L support loads reflect layout arrangement shown on encl Isometric,C 381 350~Sheet 1KRevision DE Any mods to la'yout of sys rrlll rrsrrsnt nasnalysls of oiplns sys, trtorrmrrLMw P.
- s. dr'rrSryo+A DISTRIBUTION CDDE:
ADO fs COPIES RECEIYED:LTR g ENCL V SIZE: lg fJg, TITLE! General Distribution for after-Issuance of Operating Lic NOTES: 1 copy:SEP Sect.
Ldr ~
05000204 RECIPIENT ID COOK/NAME ACTI'ONs CRUTCHFIELD 00 INTERNAL'/DIRgHUM FAC08 ILK 06 OELD 11 01 COPIES LfTTR ENCL 13 13 1
1
'2 2
1 0
1 1
RECIPIENT ID CODK/NAME DIRPHUM FAC 07 NRC PDR 02 OR ASSESS BR 10 COPIES LTTR ENCL 1
1 1
1 1
0 EXTERNAL.
1 LPDR 03 sE'p 18 ))80 gd DS TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL
i'l 4
0 4
n tl
Westinghouse Electric Corporation Water Rea'ctor Divisions Nuclear Technology Olvision Box 355 PmsburghPonrzylvanla15230 July 18, 1980 ST-SST-103 RGE-80-97 Mr. M. P. Lilley Rochester Gas tl Electric 89 East Avenue Rochester, New York 14649
Dear Mr. Lilley:
r ROBERT EMMETT GINNA NUCLEAR GENERATING STATION R.
E. Ginna Seismic Upgrading Program Residual Heat Removal S stem, Section 250 Transmitted herein is the piping stress report for the.R.
E. Ginna Nuclear Generating Station Unit No. 1, Residual Heat Removal
- Systerc, Section
- 250, SDTAR-80-05-05.
Analysis results arid support loads contained herein reflect the layout arrangement shown on marked isometric C-381-354, Sheet 1,. Revision
.o Any significant modifications to the layout of this system of piping and or its restraints will w'arrant reanalysis of this piping system.
Minor design changes or construction modifications will generally not affect stress results and support recommendations.
- However, case by case review of the discrepancies can be used to determine. overall sjstem behavior and effects.
If any questions exist relative to the above transmittal, please contact W. A. Massie of Westinghouse.
Yery truly yours, W. A.
t assie/dj Attachment F. Noon,,lanager Eastern Region WNI Support cc:
R.
E.
R.
C.
M. P.
T. R.
B. H.
P.
l"l.
'g. D. A.
J.
C.
Smi th - 1L, 1A
- Mecredy, RGE - 1L, lA Lilley, RGE - 1L, 1A
- lleis, RGE - ll., iA
- Bell, CAI - 1L, lA
- Cameron, SA - 1L, 1A
- Snow, RGE - lL, lA
- Hutton, RGE - 1L, lA 80097yp Qg5
0,
~j aj