ML17250A520
| ML17250A520 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 08/25/1980 |
| From: | White L ROCHESTER GAS & ELECTRIC CORP. |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8009020026 | |
| Download: ML17250A520 (6) | |
Text
REGULATORY
%FORMATION DISTRIBUTION S EM (RIDS)
ACCESSION NBR 8009020026 DOC ~ DATE 80/08/25 NOTARIZED NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant~
Unit ii Rochester G
05000244 AUTH BYNAME AUTHOR AFFILIATION NHITEiL~ D ~
Rochester Gas L Electric Corp.
REC IP ~ NAME RECIPIENT AFFILIATION CRUTCHF IELDg D.
Operating Reactors Branch 5
t
SUBJECT:
Notifies that revised definition of "operable" should not be incorporated into Tech Specs w/o adding corresponding ection statements'evision max should be deferred for incorporation w/further Tech Specs changes'ISTRIBUTION CODE:
A035S COPIES RECEIVED t LTR ENCL W SIZE!
A(
TI'TLE: SEP Topi cs NOTES: 1 copy:SEP Sect.
L'dr.
05000244 RECIPIENT ID CODE/NAME ACTION:
CRUTCHF IELD 04 INTERNAL: A/D MATLLQUAL13 D/DIRgHUM FAC08 HYD/GEO BR 10 02 G FIL 01 COPIES LlTTR ENCL 7
RECIPIENT ID CODE/NAME CONT SYS A
07 DIRiHUM FAC S09 I8E:
06 OR ASSESS BR 11 SEP BR 12 COPIES LTTR ENCL EXTERNAL: ACRS NSIC 14 05 16 1
1 LPDR 03 gPP Q 1989 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 88'NCL
l <<
Y' I
PP <<l C
'I
~ P
nZZZ I////////
iaaf aa tan% ja a
i
//////
I//
/S/8/Z ROCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR, VICE PRESIDENT TELEPHONE AREA CODE TIII 546-2700 August 25, 1980 Director of Nuclear Reactor Regulation Attention:
Dennis M. Crutchfield, Chief Operating Reactors Branch No.
5 U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Definition of Operability R.E.
Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Crutchfield:
By letter dated April 10,
- 1980, we were requested to revise our Technical Specifications to incorporate additional clarification
.of the term "operable".
Model Technical Specifications were provided as guidance.
Inasmuch as Ginna does not have Standard Technical Specifica-
- tions, a careful review was necessary to determine the impact of the requested revisions in light of the existing Specifications.
The review disclosed many instances where significantly faster shutdowns to cold shutdown would be required by the Ginna Technical Specifications with the proposed revision than by Standard Technical Specifications.
This is due to the fact that the Ginna Technical Specifications do not, contain the detailed Action Statements as are found in Standard Technical Specifications with their progressive stages of action. ~ was the judgement of both the Plant Operations Review Committee and the Nuclear Safety Audit and Review Board that the revised definition of the term "operable" should not be incorporated into the Ginna Technical Specifications without also adding the corresponding action statements.
- Further, it was concluded that such a significant revision need not. be pursued at this time but may be deferred to be incorporated with the Techncial Specification changes that may be forthcoming as 8009080 DQ,Q
~ i s 'i e '~
~ 4 I ih (~
~ g
ROCHESTER GAS AND ELECTRIC CORP.
DATE August 25, 1980 To Director of Nuclear Reactor Regulation Attention:
Dennis M. Crutchfield, Chief Operating Reactors Branch No.
5 SHEET NO.
a result of the Systematic Evaluation Program such as suggested in SEP Topics V-10.A and VIII-3.A In the interim, the guidance of the Staff's April 10 letter will be followed.
Very truly yours, L.D. White, Jr.