ML17249A906
| ML17249A906 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 05/16/1980 |
| From: | White L ROCHESTER GAS & ELECTRIC CORP. |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8005210433 | |
| Download: ML17249A906 (4) | |
Text
4 OR SNFORMATION DISTRIBUTION S LITEM (RIDS) ge~/~
REGULAT ACCESSION NBR 8005210433 DOC ~ OATEN'0/05/16 NOTARI ED NO DOCKET FACIL:50 244 Robert Emmet Ginne Nuclear Plant~
Unit 1i Rochester G
05000244 AUTH'AME AUTHOR AFFILIATION NHITEiL,D, Rochester Gas 8 Electric Cor p.
REC IP ~ NAME RECIPIENT AFFIL.I ATION Office of Nuclear Reactor Regulation CRUTCHF IELDiD, Operating Reactors Branch 5
SUBJECT:
Responds to NRC 800410 request for proposed Tech Spec to Clarify term "operable," Util will perform review of proposed Tech Spec L forward results to. NRC within 60 90 days, Facility does not have
- STS, DISTRIBUTION CODE:
A001S COPIES RECEIVED:LTR ENCL ~
SIZE+
J TITLE: General Distribution for after Issuance of Operating Lic W,',.a. Awv5oe
- b. @~WE NO T E S
~ eemeereeeeewa~iewwteweew
~mmeseeepi~www eoeewswmearem~eeessweeeewee~eewwmweasewwee~eomwmeeeeewee~ee RECIPIENT ID CODE/NAME ACTION:
05 BC OQQ Q+
INTERNAL:
0 ILE 12 ILE 17 ENGR BR 19 PLANT SYS BR 21 EFLT TRT SYS OELD EXTERNAL! 03 LPDR 23 ACRS COPIES LTTR EN L
1 16 RECIPIENT ID CODE/NAME 02 NRC PDR 15 CORE PERF BR 18 REAC SFTY BR 20 EEB EPB DOR STS GROUP LEADR 04 NSIC COPIES LTTR ENCL 1
1 1
1 1
TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL
0 P
(
,II m
t e ~ s
(
tl 1
'sR d
tsar~>> ~Pi
~,7: e~'-<d C
l L'
/////////// /'//////
ROCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR.
VICE RRESIDENT TELEPHONE AREA CODE TIE 546.2700 May 16, 1980 Director of Nuclear Reactor Regulation ATTN: Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.
5 U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Subject:
Technical Specifications on Equipment Operability R. E. Ginna Nuclear Power Plant, Unit No.
1 Docket No. 50-244
Dear Mr. Crutchfield:
By letter dated April 10, 1980, which we received on April 18, 1980, Mr. Darrell Eisenhut requested that we propose a Technical Specification to clarify the use of the term OPERABLE.
A proposal was prepared and presented to the Plant Operations Review Committee and the Nuclear Safety Audit and Review Board (NSARB).
The NSARB has recommended that the proposal not be submitted until a review of the Technical Specifications can be com-pleted to ensure that implementation of the Staff guidance willnot result in any adverse impacts.
Such adverse impacts could occur since Ginna does not have Standard Technical Specifications and has some Specifications without the extensive "Action Statements" such as are found in the Standard Technical Specifications.
We expect to perform a review and to submit proposed Technical Specifications within the next 60 to 90 days.
I Very truly yours, L. D. White, Jr.
~7 i