ML17249A862

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-244/79-18 on 791203-06.Noncompliance Noted: Failure to Respond to Audit Findings,To Comply W/Requirement of Security Plan,Paragraph 13 & to Have Written Procedures for 10CFR71,App E.Portion Withheld (Ref 10CFR2.790)
ML17249A862
Person / Time
Site: Ginna 
Issue date: 02/01/1980
From: Crocker H, Markowski R, Yuhas G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17249A858 List:
References
50-244-79-18, NUDOCS 8004300244
Download: ML17249A862 (34)


See also: IR 05000244/1979018

Text

SOO4300 ++

eport

No

50"244/79-18

Docket No.

U.S.

NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

Region I

License No.

Priority

Licensee

Rochest r Gas

and Electric Company

89 East Avenue

Category

Rochester,

New York

14649

R.

E. Ginna Nuclear Power Plant

Facility Name:

Ontario,

New York

Inspection at:

Inspection conducted:

December

3 6

1979

Inspectors:

R.

S.

alar onski,

Renege

Inspector

i- 9

date signed

Approved by.

G. P.

u as,

Radiation Specialist

hJ

H.

W. Crocker,

ting .Chief

Radiation Support Section

date signed

-date signed

8

dat

si gned

Ins ection

Summar

Ins ection on December 3-6,

1979

Re ort No. 50-244/79-18)

P

'

'"0 '"

P

9'

b

inspectors of the licensee's

response

to IE Bulletin 79-19,

"Packaging

of Low-Level Radioactive

Waste for Transport

and Burial".

Areas inspected

included: regulatory requirements,

burial site requirements,

procedures,

training audits,

inspection of packages

and review of records.

In

addition, the inspector

reviewed actions

taken by the licensee

in response

to previous inspection findings and to the indications of a primary to

secondary

steam generation

leak that occurred

on December

1, 1979.

Region I Form 12

(Rev. April 77)

Upon arrival at 4:15 p.m.,

December 3,

1979 areas of the plant including;

the reactor containment building, auxiliary building, control

room and

outside radioactive material

storage

areas

were toured by the inspectors.

The inspection. involved 66 inspector-hours

on site by two NRC regional

based

inspectors.

Results:

Of the ten areas

inspected.

no items of noncompliance

were

ident>fied in six areas;

two apparent

items of noncompliance

were identified

in one area (Infraction - failure to comply with 10 CFR 71.3 when delivering

licensed material to a carrier for transport,

Infraction - failure to

comply with 10 CFR 71.5,

Paragraph ll); and one apparent

item of noncompliance

was identified in each of the following areas;

(Inspection - failure to

have written procedures

10 CFR 71 Appendix E, Criteria 5, Paragraph

7;

Infraction - failure to respond

to audit findings,

10 CFR 71 Appendix E,

Criteria 16, Paragraph

9; Infraction - failure to comply with a requirement

of the Security Plan,

Paragraph

13).

ry

Persons

Contacted

DETAILS

  • C. Anderson,

Manager guality Assurance

J.

Brown, Shift Foreman

  • M. Dillion, Security

D. Filkins, Supervisor,

Chemistry

and Health Physics

  • E. Gordon, Health Physicist

R. Morrill. Training Coor dinator

B. guinn, Health Physicist

"T. Schuler, guality Control Engineer

S. Spector,

Maintenance

Engineer

  • B. Snow, Plant Superintendent
  • R. Mood, Security

The inspector also talked with several

other licensee

employees

including members of the health physics,

operations

and maintenance

staffs.

  • denotes

those present at the exit interview on December 6, 1979.

Licensee Action on Previous

Ins ection Findin s

(Closed)

Noncompliance .(50-244/76-18-01)

Failure to comply with

back shift requirements for radiation protection coverage.

The

licensee

has assigned

health physics technicians

to each shift to

insure around-the-clock radiation protection coverage.

(Closed) Previously Identified Item (50-244/79-13-01

)

gual ifications

of the Supervisor,

Chemistry and Health Physics.

From interviews

with the individual the inspector determined that his qualifications

(Bachelor of Science

(Chemistry), University courses

in health

physics,

eleven

and one half years of nuclear

power plant experience,

five of which involved applied radiation protection)

meet the

requirement of Technical Specification 6.3.

Review of Licensee's

Res onse to IE Bulletin 79-19

The inspector reviewed Rochester

Gas

and Electri'c Cqrpovation's

response

dated

September

25,

1979 to assure

that all information

required by the bulletin was included and to ascertain

that corrective

action comnitments were made.

Or anization

Procedure

A-201, "Ginna Station Administrative and Engineering

Staff Responsibilities",

Revision-l, dated July 18,

1979 places

responsibility for the control of solid, liquid and gaseous

radioactive

wastes with the Supervisor,

Chemistry

and Health Physics.

The procedure

places responsibility to prepare

procedures for

handling and shipping solid radioactive waste with the Health

Physicist.

He is also assigned

responsibility to oversee

these

operations.

The Operations

Engineer is responsible for directing operations

involving radioactive waste.

No mention of radwaste responsibilities

is made in regard to the

Maintenance

Engineer.

Maintenance

personnel

routinely construct

shipping containers for low specific activity material.

They also

are responsible for preparation of 17H drums used for solidification.

Maintenance

personnel

stated that these actions are performed'under

the direction of the health physics staff.

The i"nspector noted that processing

and shipment of radioactive

waste is a collateral responsibility of each of the professionals

noted above.

Re ulator

Documents

The inspector verified that the licensee

has

a current set of DOT

and

NRC regulations.

The licensee

subscribes

to a commercial

service that provides bi-weekly updates of regulatory changes

and

related matters.

The inspector

noted that no formal procedure

has

been

implemented

to assure that these notifications of regulatory

changes

are implemented

as appropriate

into facility procedures.

Burial Site

Re uirements

At this time the licensee

ships radioactive waste only to the'outh

Carolina burial site.

The inspector

reviewed the licensee's

copy

of Chem-Nuclear

Systems,

Inc. South Carolina Radioactive Material

License

No. 097, 'Amendment

No.

26 dated October 30,

1979.

This is

the most recent revision of that license.

/y

The licensee

also maintains

a copy of the "Barnwell Site Disposal

Criteria" issued

September

28,. 1979 and effective December 1, 1979.

7.

Procedures

In response

to IE Bulletin 79-19, the licensee

stated that approved

procedures

for waste process

operations

and shipment of radioactive

material

had

been established.

inspector reviewed the following procedures:

r

RD-9, Preparing

Waste for Shipment

or Storage,

Revision 4,

dated February

10,

1979

RD-10, Shipping Radioactive Material, Revision 7, dated

February

28,

1979

RD-11, Receipt of Radioactive Materials, Revision 1, dated

July 9,

1979

S-4.1,

Drumming Waste Evaporator Bottoms, Revision 9, dated

November 19,

1979

S-4.4,

Spent Resin

Removal

to Shipping Casks,

Revision 19,

dated October ll, 1979

S-4..4.1,

Spent Resin

Package - Site Receipt and Shipment,

Revision 5, dated

February

10,

1979

S-4.6,

Operation of the Radioactive

Waste Press,

Revision 2,

dated October 29,

1976

M-18.1,

Drum Preparation for Waste Evaporator Bottoms,

Revision

0, dated February 20.

1976

gCIP-21, Shipping

Package

ATCOR LL-50-100 Inspection,

Revision

2, dated

December '4,

1979

gCIP-22, Shipping Package

HN-100 Series

1 Inspection,

Revision

1, dated April 1979

gCIP-23, Shipping Package

6144 Inspection,

Revision 0, dated

May 29,

1979

Based on=this review the inspector

concluded that procedures

RD9 and R010 were in need of revision in order to eliminate

confusion

and inconsistencies

with the "Barnwell Site Disposal

Criteria".

The Health Physicist presented

documents

indicating

these

two procedures

are currently in the process of revision

and upgrade.

Procedures

RD9 and

RD10 will be reviewed in a subsequent

inspection

(50-244/79-18-01).

10 CFR 71 Appendix E, Criterion 5, "Instructions,

Procedures

and Drawings" states

that:

"Activities affecting quality

shall

be prescribed

by documented instructions,

procedures,

or

drawings of a type appropriate

to the circumstances

and shall

be accomplished

in accordance with these instructions,

procedures,

or drawings.

These shall include appropriate quantitative or

qualitative acceptance

criteria for determining that important

activities have been satisfactorily accomplished."

The licensee routinely uses

three different NRC certified

shipping containers

(Certificate of Compliance

(C of C$ Nqs.

6144,

6601, 9086}.

Procedures

S-4.4.1 state that shipping

casks

be prepared

in accordance with the suppliers

instructions.

Based

on a review of documentation maintained

and discussions

with licensee

representatives,

no written procedures

were

provided by the cask supplier or developed .by the licensee

that directed the loading or closure of these

packages

when

utilized on February

1, 1979,

(C of

C 6601) and'ay

29,

1979

(C of C 6144} to ship 86 Ci and 19.88 Ci of licensed radioactive

material

to the waste burial site.

Failure to utilize written procedures

for activities affecting

quality such

as loading and closure of a shipping package

represents

noncompliance with 10 CFR jl Appendix E, Criteria

5

(50-244/79-18-02}.

The inspector

reviewed documentation

generated

pursuant to

procedure

gCIP-21 for the February 1, 1979,

and gCIP-31 for

the May 29,

1979 shipment of radioactive materials.

These

guality Control Inspection

Procedures

appear

adequate

to

assure

that most of the requirements

expressed in'0 CFR 71.54

"Routine determinations"

have been met, however,'either of

these

procedures verify that the package

has

been

loaded

and

closed in accordance

with written procedures.

Procedures

gCIP-21

and gCIP-22 will be reviewed in a subsequent

inspection (50-244/79-18-03) .

8.

~Trainin

References:

A-101, Ginna guality Assurance

Program Implementation,

Revision

0;

A-102.6;

R.

E. Ginna Systems

Familiarization Program;

Revision

0;

A-102.7,

R.

E. Ginna Auxiliary Operator gualification Program,

Revision 0;

A-102.9, Maintenance Training Program,

Revision 0;

A-102.10, Health Physics Technician Training and Responsibility

Limits, Revision 1; and

A-1002, gualification of Surveillance

and Inspection Personnel,

Revision

1

The inspector

reviewed procedure

A-101 to establish

those onsite

organizations

which participate in the transfer,

packaging

and

shipping of low level radioactive material.

It was noted that

operations,

health physics, quality control

and maintenance

personnel

are involved in this activity.

The above procedures

as well as lesson plans, lecture outlines,

and/or examinations

were reviewed

on a sampling basis

to assure

that the training program was designed

to provide sufficient familiarity

with the appropriate

operating procedures,

and methods

were specified

to assure that personnel

have

a sufficient degree of familiarity

with operating

procedures

to assure

safe operations.

The findings in this area

were:

a.

The response

to items

5 and

6 of IE Bulletin 79-1'9 dated

September

25,

1979 stated that training in the operating

procedures

would be completed

by January

1, 1980.

A

During the review of Audit No. 79-33:CA, the inspector noted

that a finding of the audit

(AFCAR 1} indicated that maintenance

department

personnel

did not have procedures

and

had, not

received training to date (i.e. October 5,

1979) in the preparation

of drums and boxes

as required

by 49 CFR 178.

During the sampling review of the lesson

plans associated

with

radioactive waste

systems

and training conducted

by the Health

Physicist in NRC Part

71

and

DOT regulations,

the inspector

noted that preparation of drums and boxes

was not specifically

itemized as

a lecture topic.

During the review of procedures

detailed in Paragraph

7, it

was identified that procedural

coverage

associated

with the

assemblage

of licensed

casks

had not been developed,

and

therefore

had not been incorporated into the training outlines

reviewed

by the inspector.

The inspector discussed

the incorporation of training in

DOT

and

NRC shipping regulations into the operator

and systems

training program by January

1,

1980 as stated in the response

with the Training Co-ordinator.

He stated that the incorporation

would occur as scheduled.

Item 4 of IE Bulletin 79-19 stated

the licensee is expected

to

provide procedures

which provide special attention. to controls

associated

with the chemical

and physical

form of the low

level radioactive material.

Item 6 stated that training is

expected

to be provided for processing

waste into an acceptable

chemical

and physical

form.

Item 4 of the response

to this bulletin indicated that a

process

control

system is being developed coincident with the

impending Environmental

Technical Specifications

which will

further define controls for physical

and chemical

packaging.

Review of training provided to those individuals responsible

for the radioactive waste shipping program indicated the

following:

The Supervisor,

Chemistry and Health Physics

and the

Health Physicist attended

a two day seminar

on transportation

of radioactive materials in August 1978

The Health Physicist attended

a training session

on

shipment of radioactive material at the American Nuclear

Society Meeting in November 1979.

He also participated

in a meeting of the American Industrial

Forum's

Sub-

Coomittee on Reactor

Waste Solidification in Washington,

O.C. on November 1,

1979

Assessment

of these training programs

provided by a licensee

representative

indicated, that although,

they were informative,

they did not provide detailed specific guidance frequently

necessary

to permit compliance with federal regulations.

Training of individuals involved in processing

and shipment of

radioactive materials will be reviewed in a subsequent

inspection

(50-244/79-18-04).

9.

~ACh

P

References

guality Assurance

Manual - Ginna Station; various sections;

gA 1801

GS, gualification of Auditing Personnel,

Revision 6;

gA 1802 GS, Audit Scheduling

and Planning;

Revision 7;

gA 1804

GS, Reporting and Followup of RG8E Audit Findings,

Revision 6; and,

A1801, Ginna Station

Response

to Internal Audits, Revision

0

The above references

were reviewed to verify that

an audit program

had been established of all activities associated

with the transfer,

packaging

and transport of low level radioactive wastes.

The above

procedures

provide general

provisions for: qualification of audit

personnel;

a system for assuring that corrective actions are taken

on audit findings; audit scheduling;

and formal audit reports

and

their distribution to management.

10

The inspector further reviewed internal audits report nos.

79-25:GS

and 79-33:CA'dated

September

10,

1979 and October 11, 1979'espectively.

The audits were reviewed to:

assess

the scope of the audit program

related to radioactive waste shipments;

and, verify that corrective

action was administrated

in accordance

with established

procedures.

The findings in this area

were as detailed in the following subparagraphs:

a 0

b.

c

d.

Audits were conducted

as stated in item 8 of the response

to

IE Bulletin 79-'19 dated

September

25, 1979.

The scope of the above referenced

audits included

a review of

the maintenance of regulations;

organizational

and procedural

coverage;

training; and, shipping records.

During the conduct of the audit associated

with report no. 79-

33:CA, the auditor had identified that training and procedures

had not been developed

in the preparation of drums

and boxes

for shipping

as required by 49

CFR 178.

The finding had been formally documented

(AFCAR 1) and transmitted

to the site organization responsible.

AFCAR

1 specified

a due

date of November 12.

1979.

Administrative procedure,

A1801 requires

the submittal of the

response

to an audit finding on or before the due date.

As of

December

5, 1979,

a response

had not been submitted.

This is

contrary to 10 CFR 71, Appendix E, Criterion 16 and procedure

A1801

and is an item of noncompliance

(50-244/79-18-05).

The inspector discussed

the training provided to auditors with

the guality Assurance

Manager.

It was noted that no specialized

training had been provided in low level radioactive waste

shipping.

The equality Assurance

Manager stated that during

previous aduits,

an outside specialist

had been utilized.

The

inspector discussed

the advisability of providing some specialized

training to the appropriate

RG8E personnel

who perform internal

audits,

inspections

and/or surveillances

in this area with the

guality Assurance

Manager.

10.

Onsi te Observation

During the inspection,

a 55 gallon

17H drum containing waste evaporator

bottoms solidified in accordance

with procedure

S-4.1

was selected

for- examination of potential free standing water.

The.lid plug was removed

and the drum inverted over

a drip pan

assembly.

The drum remained in this position for two hours.

The

inspector did not observe

any visibl.e water from this drum.

11.

Records of Shi ments

The inspector reviewed records of shipments of radioactive materials

made in the period from March 1978 to December

1979.

The findings

of'his review are noted below:

a..

The Semiannual

Effluent Release

Report submitted in accordance

with Technical Specification 6.9.3.b

and referenced

in Item 9

of the response

to IE Bulletin 79-19 for the period January

thru May. 1979 was found to have

an inconsistancy.

The first

page states,

"The solid waste shipped included 219.23 curies

of activity in 64,152 cu. ft.

The tabulation of shipments of

solid waste attached

to the report indicates

a total curie

content of 136.76 and total volume of 6,415.2 cu..ft.

The-

inspector audited the- 1979 solid waste shipping records'and

found the total activity to be 136.76 curies

and 6,415 cu. ft.

This matter was brought to the attention of the Superyisor,

Chemistry and Health Physics.

The Supervisor,

Chemistry and Health Physics stated

the matter

will be resolved

and

a correction submitted

as appropriate.

The correction will receiVe

NRC:RI in office reyjeW L50-

244/79-18-06).

b.

10 CFR 71..3 requires that no licensee deliver licensed rater ial

to a carrier for transport except

as authorized jn a genepal

or specific license issued

by the Commission

op as exempted.

A general

license js issued to ship licensed qaterial

pursuant

to 10 CFR 71..12(b) in a package for which a Certificate of

Compliance

has

been issued

provided that the shlppep

has

a

copy of the Certificate of Compliance, all documents

referred

to in that Certificate and compli'es with the terms

and condjtions

of that Certificate.

12

(1)

The inspector reviewed the Certificate of Compliance

No.

6601, Revision

3 and

5 for the Model

No. LL-50-100 cask.

Both revisions of this Certificate of Compliance reference

Drawing No. 1042-B-0004

Rev.

C.

Records of solid radioactive

waste shipments

indicate

262 Ci and

86 Ci of licensed

material

were delivered to a carrier for transport in

this cask on June

26,

1978 and February

1, 1979.

Inspection

of documents

maintained

by the licensee did not include

Drawing No. 1042-B-0004

Rev.

C.

A licensee

representative

acknowledged that they did not have

a copy of this drawing.

A facsimile of Drawing No. 1042-B-0004

Rev.

C was received

by the licensee

on December

5, 1979.

(2)

The inspector reviewed the Certificate of Compliance

No.

6144 Revision

3 for the Model CNSI-6144 cask.

Referred

to in this Certificate of Compliance is a document titled,

"Chem-Nuclear Systems,

Inc. supplement

dated

November 1,

1977.

Records of solid radioactive waste shipments

indicate that 19.88 Ci of licensed material

were delivered

to a carrier for transport in this cask

on May 29, 1979.

Inspection of documents

maintained

by the licensee

did

not reveal

the "Chem-Nuclear Systems,

Inc. supplement

dated

November 1, 1977."

A licensee

representative

acknowledged that they did not have

a copy of this document.

Failure to have

a copy of all documents

referred to in a

Certificate of Compliance for a package

as required by 10 CFR 71.12(b) represents

noncompliance with 10 CFR 71.3 (50-244/79-

18-07).

10 CFR 71.5 requires that

no licensee deliver licensed material

for transport unless

the licensee

complies with the applicable

requirements of the regulations appropriate

to the mode of

transportation

as they relate to marking and labeling of

packages.

49

CFR 172, Subpart

C - "Shipping Papers"

states

in

section

172.203 that, for:

"(d) Radioactive material

(1) the

description for a shipment of radioactive material

must include

the following additional entries

as appropriate:

(i}

The

name of each radionuclide in the radioactive material

that is listed ig

9 173.390 of this subchapter.

Abbre-

viations, e.g.

""9Mo" are authorized..."

13

~ The inspector reviewed the licensee's

Radioactive Materials

Shipment Record

No. 79-2 and the Chem-Nuclear

Systems,

Inc.,

Radioactive

Shipment Record

Form No.

2955 for the February 1,

1979 shipment of Type 8 quantities radioactive materials

to

the Barnwell, South Carolina burial site.

These

forms listed

the below radionuclides

to be present in the radioactive

material.

Nucl ide

134

Cs

137

Cs

"Co

guantity

11,140 millicuries

58,740 millicuries

16,060 millicuries

Total of

86,000 millicuries

This shipment consisted of dewatered

spent resins in a

NRC

certified cask.

Spent resins are likely to contain many

radionuclides typically present at a nuclear facility.

One

radionuclide expected in spent resins is Strontium 90.

A

licensee representative

calculated

an. estimate of 90 Sr. present

in the resins.

This documented

estimate indicates that 58

millicuries of 90 Sr were present.

The licensee

added this

value to the

sum of other radionuclides

known to be present

and documented

a total content of 86,000 millcuries on both

shipping forms.

Review of the June

26,

1978 shipment of spent resins

also

indicate that 30 millicuries of 90 Sr were calculated

to be

present,

but were not indicated on the shipping forms.

Failure to list Type

B quantities of 90 Sr on the shipping

papers

as required in 49

CFR 172.203(d)

represents

noncompliance

with 10 CFR 71.5 (50-244/79-18-08).

10 CFR 20.205,

"Procedures for picking up receiving,

and

opening packages."

requires that each licensee

who expects

to

receive

a package

containing quantities'of radioactive material

in excess of Type A quantities

must comply with several

requirements

involving timely receipt,

survey and notification of deficiencies.

The licensee

has established

and implemented

procedure

RDll to

insure these requirements

are met.

14

Review of records

indicates that the licensee

received

one

shipment on March 9,

1979 of a Type

B quantity of radioactive

material.

The package

was received

and surveyed in accordance

with procedure RDll.

No notifications were required

based

on

survey results since all applicable requirements

were complied

with.

12.

Tube Leak in "B" Steam Generator

LER-79-022)

On December

1, 1979, at approximately 9:00 p.m., the onshift licensed

operators

noted an increase

in the Air Ejector Radiation Monitor

(R-15}.

Subsequent

followup. action resulted in confirming that a

leak of 0.007 gallons/minute

had developed in the "B" Steam Generator.

A plant shutdown was

commenced at 9:05 a.m.

on December

2, 1979 to

effect repairs.

During this inspection,

the inspectors

reviewed the actions

taken

subsequent

to the identification of the leak.

This review consisted

of discussion with the personnel

onshift at the time and plant

supervision;

and, review of the Official Record, Shift Foreman's

Log, Procedure

0-6. 10, Revision

2

(PCN 79-2583)

and records of

radioanalysis of the Steam Generator.

The inspector determined that:

notification to licensee

management

and the

NRC had been

made;

the procedures utilized to operate

the plant subsequent

to the

identification of the leak were compatible with the calculated

leak rate;

sufficient sampling

was conducted

to assess

the magnitude of

the leak and the offsite releases;

and,

preliminary calculations

performed by the inspector indicated

that the release

to the environment was less

than

11 of the

values specified

by the Technical Specifications

in section

3.92.

No items of noncompliance

were identified.

P

15

13.

Plant Tour

The inspectors

conducted

a general

plant tour.

The areas

toured consisted of the external

areas

inside the security

fence,

the Auxiliary Building, the Containmerit Vessel

and the

Control

Room.

I

During the conduct of this tour the inspectors

observed/

determined:

general

housekeeping

and cleanliness;

temporary storage of low level radioactive waste;

general,.posting

of radiation areas;

general

control of step off pads,

disposal of protective

clothing, observation of calibration status of personnel

monitoring devices,

and Radiation

and Special

Mork Permits;

control

room manning;

discussions

were conducted with control

room operators

pertaining to reasons for selected

lighted annuciators;

security measures

associated

with the plant outage;

and,

verfication by use of an

NRC instrument

on a sampling

basis that radiation area posting

was consistent with

dose rate levels

IR

16

b.

THIS PAGE

HAS BEEN INTENTIONALLY DELETED; IT CONTAINED 10 CFR 2.790(d)

INFORMATION - NOT FOR PUBLIC DISCLOSURE.

17

14.

Exit Interview

The. inspector met with licensee

representatives

(denoted in paragraph

1) at the conclusion of the inspection

on December 6, 1979.

The

inspector

summarized

the scope

and findings of the inspection.-

The inspector

expressed

concern with the licensee's

program for

packaging

and shipment of low level radioactive waste.

The inspector

expressed

.the need for additional

management attention in this area

prior to future shipments of radioactive materials.

The 'licensee representatives

stated that to his knowledge

no shipment

of radioactive material

had left the facility prepared

in a manner

that would not.have afforded the designed

containment or had arrived

at its destination with radiation or contamination .levels in excess

of any applicable limits.

He also stated that the radioactive

material

shipping program is presently being upgraded

and that all

shipments

made during this period will be carefully scrutinized to

insure compliance is maintained with all applicable requirements.