ML17249A773
| ML17249A773 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 03/14/1980 |
| From: | White L ROCHESTER GAS & ELECTRIC CORP. |
| To: | Ziemann D Office of Nuclear Reactor Regulation |
| References | |
| TASK-05-11.A, TASK-05-11.B, TASK-5-11.A, TASK-5-11.B, TASK-RR NUDOCS 8003190516 | |
| Download: ML17249A773 (6) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBRg800319051b DOC,DATE; 80/03/14 NOTARIZED! YES DOCKET FACIL;50 244 Robert Emmet G'inqa Nuclear Planti UnitA ir Rochester G
05000244 AUTH'AME AUTHOR AFFIL'IATION WHITEe L ~ D ~
Rochester',
Gas 8 Electr ic Corp, RECIP ~ NAME RECIPIENT AFFILIATION ZIEMANNr0 ~ L ~
Operating Reactors Branch 2
SUBJECT:
Responds to 800223 ltr re LWR primary coolant, sys pressure isolation valves, Need= for surveillance or periodic testing being evaluated
.Periodic check valve pressure integrity test program being developed, DISTRIBUTION CODE:
ABOIS COPIES. RECEIVED:LTR g'NCI. <
SIZEs TITLE! Gener al. Distribution for after Issuance of Operating Lic NOTES~ 4 a~KL+<EP<~M~
RECIPIENT COPIES ID CODE/NAME LtTTR EN L
RECIPIENT ID CODE/NAME COPIES LTTR ENCL ACTION', 05 BC ggQ M P INTERNAL:
0 REG "FILE'7 ENGR BR-19 PL'ANT SYS BR 21 EFI.T TRT SYS OELD EXTERNAL! 03 LPDR 23 ACRS 2
1 1
1" 1
1 16 1
02 NRC PDR 15 COREr PERF< BR 18 REAC SFTY BR 20 EEB EPB DOR STS GROUP LEADR 04 NSIC ~
1 1
1 1
)
1 RAP:
P.
7 oc.iC'.
8uvcggg o
1 o
TOTAL NUMBER OF COPIES REQUIRED'TTR ~
ENCL
ll 1
F I
~
II
/
f I
ff k
r II IIP A '<<4>> 8: '<".A 4
t i iiizirz; iiiiiiiiiiiii
'iiiii' i zxeii illisi'iiiii/ll/ ~iiiiissi ROCHESTER GAS AND ELECTRIC CORPORATION
'"".. ".,1Oaa I
A
$ 1AIC I
o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR.
VICK PRKKIOKNT TKLKPHONK ARKA COOK TI6 546.2700 March 14, 1980 Director of Nuclear Reactor Regulation Attention:
Mr. Dennis L. Ziemann, Chief Operating Reactors Branch No.
2 U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
LWR Primary Coolant System Pressure Isolation Valves R. E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Ziemann:
This letter is in response to a February 23, 1980 letter (received March 4, 1980) from Darrell G. Eisenhut to "All LWR Licensees" concerning the "LWR Primary Coolant System Pressure Isolation Valves".
In that letter, it was requested that we provide information, within 20 days of receipt of the letter, in order to determine whether the Ginna license should be modified to require either continuous surveillance or periodic testing.
Our responses to the questions raised in the NRC letter are as follows:
Describe the valve configuration at, your plant and indicate if an Event V isolation valve configuration exists within the Class I boundary of the high pressure piping connecting PCS piping to low pressure system piping; e.g.,
(1) two check valves in series, or (2) two check valves in series with a MOV;
Response
This information was previously provided to the NRC staff during the review of SEP Topic V-ll.A, "Require-ments for Isolation of High and Low Pressure Systems,"
transmitted from L. D. White, Jr. to Mr. Dennis L.
Ziemann on January 25, 1979.
Only two arrangements are similar to the "Event. V" configurations.')
The high head safety injection to the cold leg has two check valves in series with an open MOV.
However, the safety injection piping is 1500 psi piping, rather than low pressure-piping.
It also has a relief valve in the line which relieves back to the pressurizer relief tank inside con-tainment.
Since there is substantially more protection from an Event V in this arrangement (P~ 0 1
1V0 SO O3i 905 l t'
~
4
r ROCHESTER GAS ANP ELECTRIC C RP.
pATE March 14, 1980 To Mr. Dennis L. Ziemann SHEET NO.
than in the scenario described in WASH-1400, it will require further evaluation by RG&E to deter-mine the need for providing any additional margins of safety, such as periodic testing or surveillance.
b) the low head safety injection system has one check valve and one, normally closed MOV.
This MOV receives a safety injection signal to open.
2.
If either of the above Event V configurations exist at your facility, indicate whether continuous surveillance or periodic tests are being accomplished on such valves to ensure integrity.
Also indicate whether valves have been known, or found, to lack integrity.
Response
At the present time there is no continuous surveillance or periodic testing on these valves to ensure pressure integrity.
However, in the ten years of operation there has been no indication of any gross leakage in any of these check valves.
3.
If either of the above Event V configurations exist at your facility, indicate whether plant procedures should be revised or if plant modifications should be made to increase reli-ability.
Response
-As noted in Response la above, RG&E is evaluating the need to perform any continuous surveillance or periodic testing for the high head safety injection check valves.
For the low head safety injection check valves (853 A, B),
we are presently in the process of developing a
periodic check valve pressure integrity test program, to be, used during startups prior to exceeding the RHR system design pressure.
When the details of this periodic testing program are finalized, it will be incorporated in the plant procedures.
The programs for check valve surveillance or testing for the high head safety injection lines (if needed) and the low head safety injection lines will be imple-mented prior to startup following our Spring 1980 refueling outage.
Very truly yours,
~,p.
L. D. White, Jr.
Subscribed and sworn to me on this /gYday of March 1980.
ARY L.
R ISS NOTARY PUBLIC, State of N. Y. Monroti Cd.'y Coatmission Expires March 30, 19+)
E it
'iJ l'