ML17249A573

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1980
ML17249A573
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/08/1980
From: Harding T
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17249A572 List:
References
NUDOCS 8002150380
Download: ML17249A573 (10)


Text

OPERATING STATUS OPERATlNG DATA REPORT DOCKET NO.

DATE Pebru 8

1980 e

COMPLETED BY 7

Tom Harding TELEPHONE 1-716-546-2700 Ext. 291-205, at Ginna I. Unit Name:

GINNA STATION N

-. Reporting period:

Janua 1980

3. Licensed Thermal Power (hfWt):
4. aVameplatc Rating (Gross hfWe):

S. Design Electrical Rating (Net hfWe):

7. hlaxlmam Dependable Capaeiey (Nee hlWe): ~7 Notes The Reactor Power Level averaged 100%

in the Report Month.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):

l0. Reasons For Restrictions, If Any:

This hfonth Yr.-to-Date Cumulative I I. llours In Reporting Period 744 744 I Z. iVumber of Hours Reactor Was Critical 744 744 l3. Reactor Reserve Shutdown Hours 744 744 Ili. Ilours Generator On-Line l S. Unit Reserve Shutdown Hours 0

0 l6. Gross Thermal Energy Generated (hfWH) 1 127 568 1 127 568 li. Gross Electrical Energy Generated (hfWH)

I 8. Nct Electrical Energy Generated (MWH) 354 198 354 l9. Unit Service Factor 100%

20. Unit Availability Factor 100%
21. Unit Capacity Factor (Using hJDC Net) 101.29%

101.29%

22. Unit Capacity Factor (Using,DER Nct) 1 01

~ 29%

101.29%

2.f. Unit Forced Outage Rate 0

0 2 I. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Annual Refueli and Maintenance Overhaul tentativel March 28, 1980.

89 256 68 423.77 1 621.57

  • 66,700.63 8.5 89 403 370 29 057 852 27 515 746 68.03%

68.0 ey 0

schedu ed fo 2S. If Shut Down At End Of Report. Period, Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COhfhlERCIAL OPERATION Forecast Achieved 40 ~ hhs

[Rav, I/78) 800216o SZ

Aa AVERAGE DAILYUNIT POWER UNIT DOCKET NQ.. 50 244 UNIT NI @iona Statio Februa 8

1980 7e'OMPLETED BY Tom Harding TEI.EP HONE 1-716-546-2700 Ext. 291-205, at Ginna MONTH Janu 1980 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)

DAY, AVERAGE DAILYPOWER LEVEL (MWe-Net) 2 476 475 476 17 18 476 476 476 10 12 13 15 16 475 475 475 477 476 477 477 476 476 477 477 20 21 22 23 24 25 26 21 28 29 30 31 476 476 478 476 476 476 476 476 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

49 ~ 87 (RKVo 1/78)

UNlT SHUTDOWN AND POWER REDUCTIONS DOCKI:.T No.

IINI'INAhti:

lI1 Ginna Station Rebruar 8

1980 COhlPLETED IIY om ar ng TI'.LEPIIONI...1-716-546-2700 291-205; at Ginna No.

Date C0 VlL 0

~

0 0&

0 ~

P4 C0 00 CL e~0 c

u 00~+

>to oln C

0O Licensee Event Report 8

Ew 0

lo C0 ln C0 00 LJ Cause L Corrective Action to Prevent Recurrence No Shutdown or significant power reduction to 'report.

The Reactor Power Level averaged 100% in the Report Month.

I F:

Forced S:

Schcdulcd 49 69 (REVe i/78)

Reason:

A-Equipmcnc Failure (Explain) 0-hla intcna ncc or Tcs t C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 11-Ocher (Explain) hlcthodi 1-hlanua1 2-hlanual Scram.

3-Automatic Scram.

4-Other (Explain)

Exhibit G - Instructions for Preparation of Daca Entry Sheets for Licensee Event Report (LER) File (NUREG-016I)

Exhibit 1 - Same Source

r Jp

h 4

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

0-2 UNIT Ginn St t on Unit 81 DATE Februa 8,

1980 I

COMPLETED BY Tom. Harding MONTH J n 1980 TELEPHONE 1>>716-546-2700 Ext. 291-205, at Ginna The Reactor Power Level averaged 100% in the Report Month, with no signiHcant power reductions.

49 123 (1/73)

V I

Gonna Station Maintenance Report For January, 1980 During January, normal inspection and minor maintenance was performed.

Major safety related maintenance included:

1)

Preventive maintenance overhaul of the LB Service Rater Pump and Rotor.

2) installation of a new valve downstream of the regenerative'eat exchanger drain valve 311P.

The valve had been leaking through and=

had. become an operating nuisance.

3)

Replacement of a failed isolation amplifier for the nuclear instru-mentation intermediate range H-35.