ML17249A573

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1980
ML17249A573
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/08/1980
From: Harding T
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17249A572 List:
References
NUDOCS 8002150380
Download: ML17249A573 (10)


Text

OPERATlNG DATA REPORT DOCKET NO.

DATE Pebru 8 1980 7

e COMPLETED BY Tom Harding TELEPHONE 1-716-546-2700 OPERATING STATUS Ext. 291-205, at Ginna I. Unit Name: GINNA STATION N Notes The Reactor Power

-. Reporting period: Janua 1980 Level averaged 100%

3. Licensed Thermal Power (hfWt): in the Report Month.
4. aVameplatc Rating (Gross hfWe):

S. Design Electrical Rating (Net hfWe):

7. hlaxlmam Dependable Capaeiey (Nee hlWe): ~7
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):

l0. Reasons For Restrictions, If Any:

This hfonth Yr.-to-Date Cumulative I I. llours In Reporting Period 744 744 89 256 I Z. iVumber of Hours Reactor Was Critical 744 744 68 423.77 l3. Reactor Reserve Shutdown Hours 1 621.57

  • 744 744 66,700.63 I li. Ilours Generator On-Line 0 0 8.5 l S. Unit Reserve Shutdown Hours l6. Gross Thermal Energy Generated (hfWH) 1 127 568 1 127 568 89 403 370 li. Gross Electrical Energy Generated (hfWH) 29 057 852 I 8. Nct Electrical Energy Generated (MWH) 354 198 354 27 515 746 l9. Unit Service Factor 100%
20. Unit Availability Factor 100%
21. Unit Capacity Factor (Using hJDC Net) 101.29% 101.29% 68.03%
22. Unit Capacity Factor (Using,DER Nct) 1 01 29%

~ 101.29% 68.0  %

ey 2.f. Unit Forced Outage Rate 0 0 0 2 I. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Annual Refueli and Maintenance Overhaul tentativel schedu ed fo March 28, 1980.

2S. If Shut Down At End Of Report. Period, Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COhfhlERCIAL OPERATION 40 ~ hhs [Rav, I/78) 800216o SZ

Aa AVERAGE DAILY UNIT POWER UNIT DOCKET NQ.. 50 244 UNI T N I @iona Statio Februa 8 1980 BY 7e'OMPLETED Tom Harding TEI.EP HONE 1-716-546-2700 Ext. 291-205, at Ginna MONTH Janu 1980 DAY AVERAGE DAILYPOWER LEVEL DAY, AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 476 476 17 2 475 18 476 476 476 20 475 21 476 475 476 22 475 23 478 477 24 476 476 25 10 477 26 477 21 476 12 28 13 476 29 476 476 30 476 15 477 31 476 16 477 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

49 ~ 87 (RKVo 1/78)

DOCKI:.T No.

IINI'I NAhti: lI1 Ginna Station UNlT SHUTDOWN AND POWER REDUCTIONS Rebruar 8 1980 COhlPLETED IIY om ar ng TI'.LEPIIONI...1-716-546-2700 291-205; at Ginna C P4 e~0 c u Licensee C

0 ln 0 Vl C Ew Cause L Corrective No. Date L

0 0 0

0 0~+

0

>to Event C

0 0 Action to 00&

~

0 0 0

~ CL oln C Report 8 lo LJ Prevent Recurrence 0

O No Shutdown or significant power reduction to 'report. The Reactor Power Level averaged 100% in the Report Month.

I F: Forced Reason: hlcthodi Exhibit G - Instructions S: Schcdulcd A-Equipmcnc Failure (Explain) 1-hlanua1 for Preparation of Daca 0-hla in tcna ncc or Tcs t 2-hlanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 016I)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 49 69 (REVe i/78) 11-Ocher (Explain) Exhibit 1 - Same Source

Jp r

h 4

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 0-2 UNIT Ginn St t on Unit 81 DATE Februa 8, 1980 I

COMPLETED BY Tom. Harding TELEPHONE 1>>716-546-2700 Ext. 291-205, at Ginna MONTH J n 1980 The Reactor Power Level averaged 100% in the Report Month, with no signiHcant power reductions.

49 123 (1/73)

I V Gonna Station Maintenance Report For January, 1980 During January, normal inspection and minor maintenance was performed.

Major safety related maintenance included:

1) Preventive maintenance overhaul of the LB Service Rater Pump and Rotor.
2) installation of a new valve downstream of the regenerative'eat exchanger drain valve 311P. The valve had been leaking through and=

had. become an operating nuisance.

3) Replacement of a failed isolation amplifier for the nuclear instru-mentation intermediate range H-35.