OPERATING STATUS OPERAT)NG DATA REPORT DOCKET NO-50 244 DATE J
ua 9
1980 COMPLETED BY Andrew E. McNamara TELEPHONE 1-716-546-2700 Ext. 291-205, at Ginna l. Unit Name:
GINNA STATION UNI
- 2. Reporting period:
- December, 1979 490
- 3. Licensed Thermal Power (MWt):
4i. Nameplate Rating (Gross MWe):
S. 1)csign Electrical Rating (Net MWe):
490
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe)t The Reactor Power Level averaged 100% in the Report Month, exceptions were a Unit Shutdown from 12/2 - 12/19, detailed on Page 3.
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If Any (Net MWe):
l0. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative 8 760 339.70 42.46 327.5 486 144 159 810 152 082 02 02%%u 4
for March 15 1980.
I I. Ilours In Reporting Period 744 I 2. Number of Hours Reactor Was Critical 6,477.35 I <
Reactor Rcscrvc Shutdown Hours
- 75. 06 l4i. Ilours Generator On-Line 6,378 IS. Ilnit Rcscrvc Shutdown Hours 0
0
- 16. Gross Thermal Energy Generated (MWH) l 7. Gross Electrical Energy Generated (MWH) l8. Nct Electrical Energy Gencratcd (MWH) 29 960 510 I'). Unit Service Factor
- 20. Unit Availability Factor
~%%u
.%%u C%%u 0
2.$. Unit Forced Outage Rate 2 I. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Annual Refueli and Maintenance Overhau1 tentativel 88 512 67,679,77 1 621.57
- 65,956.63 8 5
- 88 275 802 28 685 791 27 161 548 4.52%
4.5
- 67. 74%
scheduled 2S.'f Shut Down At End Of Report. Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Cumulative total commencing January 1, 1975 Forecast ggg00 orb Achieved
AVERAGE DAILYUNIT POWER UNIT DOCKET NQ.. 50 244 UNIT tII pinna Statio Janaar 9, 1980 COMPLETED BY Andrew E. McNamara MONTH DECEMBER 9
DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 475 405 DAY.AVERAGE DAILYPOWER LEVEL (MWe-Net) 17 18 20 149 415 TELEPHONE 1-716-546-2700 Ex't 29 1 205 9 at Gonna 10 12 13 14 21 22 23 24 25 26 27 28 29 30 31 471 473 476 476 477
'77 477 476 476 475 476 INSTRUCTIOiVS On this format, list the average daily unit power'level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
tRKV I/78>
1
~
A
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT hfONTIID~E~~
l)O(:KET NO.
~o-244 IINIq NAhff:
tt1 Ginna Station f)ATf Jant 9
1980 C:OhfPLETED BY r.>~a Andrew E. McNamara Ti:LI:I>>IONI: 1-716-546-2700 Ext. 291-205, at Ginna No.
Date C0 sg o 0 O~
C0 oo 0
c v o ~
CIA C 0
Cl Licensee Event Report ff E~
0 vl o0 EA o C0 Mj C
Q t7 go Cause L Corrective Action to Prevent Recurrence 6~7 12-2-79 416.5 A
1 S/G Type Leak (79-22)
Relief Line Nozzle (79-23)
(HTEXCH)
"B" Steam Generator Tube Leak '-
Pressurizer Relief Line Nozzle Repair - Boric Acid Tanks, Low Boron Concentration.
F:
Forced S:
Schcdulcd a9 89 (AEVI'/7SI Reason:
A-Equipmcnt I ailurc (Explain) l3-hfa intcna ncc or Test C-Rcfucling D-Regulatory Restriction E-Operator Training 8: I.iccnsc Examination F-Administrative G-Operational Error (Explain)
II-Other (Explain) 3 hfcthod:
I-hfanual 2-hfanual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Liccnscc Event Rcport (LER) File (NUREG-OI6I)
Exhibit I - Same Source Yearly Unit Shutdown Number.
a 1
1
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
0-2 UNIT Ginna Station Un't 0 DATE Januar 9
1980 COMPLETED BY Andxew E. McNamara MONTH DECEMBER TEI.EPHONE 1-716-546-2700 xt.
, at irma The Reactor Power Level averaged 100% until the Unit was shutdown on 12/2 for repair of a tube leak on the "B" Steam Genexator.
The pressurizer relief line nozzle was also repaired during the shutdown.
On 12/17 the Reactor was taken critical and shortly afterwards was placed in the hot shutdown condition when the Boric Acid Tanks were found.to be out of specifications due to low boron concentration.
The Unit remained shut-down until startup on 12/19.
The Reactor Power Level was gradually increased to 100% on 12/20 and remained there for the remainder of the Report Period.
C A
C
(
~
~
)
~
r GINNA STATION MAIN ANCE REPORT FOR DECEiSER 1979 During December, normal inspections and minor maintenance was performed.
Major safety related maintenance included:
1.
Replacement of one source range (NV-32) and both intermediate ranges (N-35, N-36) of the nuclear instrumentation.
2.
Plugging of two leaking tubes and 11 other tubes that were within the plugging criteria in the "B" steam generator.
3.
Permanent repair of the south handhole on the "B" steam generator by welding the damaged area on the steam generator flanged area.
This had previously been repaired using furmanite.
4.
Replacing the body to bonnet gasket on pressurizer spray valve 431A.
5.
Replacement of a spare primary loop RTD.
6.
Weld repair of the corrosion cracking on the pressurizer relief valves safe'nd.
.7.
Replacement of reactor protection relay RT 10 on train "A" after a failed coil was found.