REGULA Y INFORMATION=OISTRIBUTIO
~YS7Et1 (RIDS)
ACCESSION. NBR!8001090314 DOC ~ DATE t 80/01/04 NOTARIZED ~
NO DOCKET l ACLLi50 244 Robert tmmet Ginna'Nuclear P'Ianti Unit 'li'ochester G
owe AUTli~ ~AMK HFlkfEiL ~ DE
'AEC7P",NAME Z IBMA'ANe D ~ I
~
AUTHOR AFF IL'I ATION
"'ocliester Cas C Electric Corp, RECIPIENT AFFILEAT'ION' Operating Reector s I3ranch 2
SUBJECT:
Responds to NRC 790808 ltr -re adequacy of station electric-distribution sys voltages,Provides status rept of testing program,Equipment to monitor amperesivo.its tL watts on safety re)ated busses will be installed during shutdown>
DISTRIBUTION CODE:
A015S COPI'ES RKCEIYED:LTR Q KNCL SIZE:
o, /
T Ons te mergency ower ystems
.OTES: UC-~'. QQ&C W>VLCC, M ~HAH.~L-~
ACTION!
INTERNAL!
EXTERNALS PIES TR ENCL 1ii i
1 1i 03 LPDR 3i ACRS REC'IP IENT CO ID COO@NAME L.Y Ob BC 01 12 TA/
DO iS OKLD'"
i7 AOXJL~ SYS BR 20 ENGR(
BA.
22 l LANT SYS BR 24 PAR 'SYS BR 2b TONDEj9 29 8RIAKMAN S
HANAUER RECIPIENT IO CODE/NAME" LA ~R &M>
02 NRC PDR 13 I8E i6 HPA is IEC SYS BR 21 HEAC SFTY BR 23 ADV"RELIC BR 25 WAMBACA T 27 MCDOAACO<D 3tj EBS""
"'4
- NSIC, COPIES L'fYA"8ACL 1
1 1i 1
~YWwC)f=bA.XO > 2. l-gj J~B x~ >>~O.
D TOTAL NUMBER OF COPIES HKQUIRKDs LTTR ~
ENCL
U P
L f,
II lt P
P
~ Il U
VPP
-I W PUe-7 UI
1 y
zutvzzu' ziuizixiil AND 4
'iizgzi/zizizuiz i ulcc i~me ROCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR.
VICE PRESIDENT TELEPHONE AREA CODE 7IS 546.2700 January 4,
1980 Director of Nuclear Regulation Attention:
Mr. Dennis L. Ziemann, Chief Operating Reactors Branch 52 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Adequacy of Station Electric Distribution System Voltages
Dear Mr. Ziemann:
In compliance with Mr. William Gammill's letter dated August 8, 1979, to all Power Reactor Licensees regarding the above subject, RGGZ is pursuing a testing program which will validate the results of the load flow analysis submitted on December 6,
1979.
This letter will serve as the status report which was promised by letter dated October 8, 1979.
The testing program will consist of installing recording equipment which will continuously monitor amperes, volts and watts on each of the safety-related inplant buses plus the offsite buses up to and including the 34.5 kv bus.
This equipment will be acquired and will be installed during a regularly scheduled plant shutdown.
Data will be collected over a one or possibly two year period so as to obtain electrical data which represents as many operating modes and plant transient conditions as possible.
Ax4.wP L. D. White, Jr.